최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국경영과학회지 = Journal of the Korean Operations Research and Management Science Society, v.31 no.3, 2006년, pp.63 - 79
박찬우 (한국철도기술연구원 철도시스템안전연구본부 안전기술연구팀) , 이효성 (경희대학교 기계. 산업시스템공학부)
In this study we consider a CONWIP system in which the processing times at each station follow a Coxian distribution and the demands for the finished products arrive according to a compound Poisson process. The demands that are not satisfied immediately are either backordered or lost according to th...
Baynat, B. and Y. Dallery, 'A Unified View of Product-form Approximation Techniques for General Closed Queueing Networks,' Performance Evaluation Vol.18(1993), pp. 205-224
Buzacott, J,A. and D. Kostelski, 'Matrixgeometric and Recursive Algorithm Solution of a two-stage Unreliable Flow Line,' IIE Trans., Vol.19(1987), pp.429-438
Duenyas, I. and W.J. Hopp, 'CONWIP Assembly System with Deterministic Processing and Random Outages,' IIE Transactions, Vol.24, No.4(1992), pp.97-111
Duenyas, I. and W.J, Hopp, 'Estimating the Throughput of an Exponential CONWIP Assembly System,' Queueing Systems, Vol.14(1993), pp,135-157
Duenyas, I, W.J. Hopp and M.L. Spearman, 'Characterizing the Output Process of a CONWIP Line with Deterministic Processing and Random Outages,' Mgmt. Sci., Vol.39(1993), pp.975-988
Gstettner, S. and H. Kuhn, 'Analysis of Production Control Systems Kanban and CONWIP', Int. J. Prod. Res., Vol.34, No,11 (1996), pp.3253-3273
Hall, K.W., 'Synchro MRP: Combined Kanban with an MRP, the Yamaha PTMAC system-production Planning and Control in Japan,' American Production and Inventory Control Society, (1986), pp.43-56
Herzog,U., L. Woo and K.M. Chandy, 'Solution of Queueing Problems by a Recusive Technique,' IBM J. Res. Dev., Vol.19 (1975), pp.295-300
Karmarkar, U.S., 'Push, Pull and Hybrid Control Schemes,' Working Paper QM8614, (1986) Graduate school of Management, Univ. of Rochester
Kimura, O. and H. Terada, 'Design and Analysis of Pull Systems; a Method of Multistage Production Control,' Int. J. Prod Res., Vol.19(1981), pp.241-253
Kragewsky, L.J. and L.P. King, 'Kanban, MRP, and Shaping the Manufacturing Environment,' Mgmt. Sci., Vol.33(1987), pp. 39-57
Law, A.M. and W.D. Kelton, Simulation Modeling and Analysis, 2nd ed., McGrawHill, New-York, 1991
Marie, R.A., 'An Approximate Analytical Method for General Queueing Networks,' IEEE Trans. Soft. Eng., Vol.SE-5(1979), pp.530-538
ong, J,S., S.H. Xu, and B. Lin, 'OrderFulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes,' Operations Research, Vol. 47, No.1(1999), pp,131-149
Spearman, M.L., ' Push and Pull Production System: Issues and Comparisons,' Opns. Res., Vol.40(1992), pp.521-532
Spearman, M.L., 'Customer Service in Pull Production System,' Opns. Res., Vol.40 (1992), pp.948-958
Spearman, M.L., D.L. Woodruff and WJ, Hopp, 'CONWIP: A Pull Alternative to Kanban,' Int. J. Prod. Res., Vol.28(1990), pp.878-894
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.