초록
▼
A system and method for generating disassembly, procurement and production plans dealing with recyclable parts and products are provided. Production demand information on products to be manufactured, collection schedule information on individual used products and recyclable part table on recyclable
A system and method for generating disassembly, procurement and production plans dealing with recyclable parts and products are provided. Production demand information on products to be manufactured, collection schedule information on individual used products and recyclable part table on recyclable parts contained in the used products are stored in memory; recyclable part availability information is generated by referring to the collection schedule information and the recyclable part table; and by referring to the production demand information and the recyclable part availability information, a disassembly plan on the recyclable parts is created based on the production demand. Further, the production demand information and the recyclable part availability information are referenced to generate a procurement plan on parts and materials that cannot be fully supplied from available, recyclable parts alone. Based on the disassembly and procurement plans, a production plan is created.
대표청구항
▼
1. A disassembly plan generation system for creating a disassembly plan to disassemble collected, used products, the system comprising:a collection schedule information memory unit to store collection schedule information on each used product; a recyclable part table memory unit to store a recyclabl
1. A disassembly plan generation system for creating a disassembly plan to disassemble collected, used products, the system comprising:a collection schedule information memory unit to store collection schedule information on each used product; a recyclable part table memory unit to store a recyclable part table showing recyclable parts contained in each used product; a production demand memory unit to store production demand information on products to be manufactured using the recyclable parts; a recyclable part availability information generation unit to generate recyclable part availability information on recyclable parts by referring to the collection schedule information and the recyclable part table and to store the recyclable part availability information in a recyclable part availability information memory unit; and a production demand development unit to generate a disassembly plan on recyclable parts based on a production demand by referring to the production demand information and the recyclable part availability information. 2. A procurement plan generation system according to claim 1, wherein the recyclable part availability information generation unit relates those recyclable parts to each other which, when used for the manufacture of a product, have an exclusion relation with each other in the recyclable part table, stores them in the recyclable part availability information memory unit, and manages the recyclable part availability information according to the exclusion relation.3. A procurement plan generation system for creating a procurement plan to procure parts and materials for products to be manufactured, the system comprising:a production demand memory unit to store production demand information on products to be manufactured; a collection schedule information memory unit to store collection schedule information on each used product; a recyclable part table memory unit to store a recyclable part table showing recyclable parts contained in each used product; a recyclable part availability information generation unit to generate recyclable part availability information on recyclable parts by referring to the collection schedule information and the recyclable part table and to store the recyclable part availability information in a recyclable part availability information memory unit; and a production demand development unit to generate a procurement plan on parts and materials that cannot be fully supplied from available, recyclable parts alone by referring to the production demand information and the recyclable part availability information. 4. A disassembly plan generation system according to claim 1, wherein the recyclable part availability information generation unit relates those recyclable parts to each other which, when used for the manufacture of a product, have an exclusion relation with each other in the recyclable part table, stores them in the recyclable part availability information memory unit, and manages the recyclable part availability information according to the exclusion relation.5. A production, procurement and disassembly plan generation system for creating production, procurement and disassembly plans on recyclable products, the system comprising:a production demand memory unit to store production demand information on products to be manufactured; a collection schedule information memory unit to store collection schedule information on each used product; a recyclable part table memory unit to store a recyclable part table showing recyclable parts contained in each used product; a recyclable part availability information generation unit to generate recyclable part availability information on recyclable parts by referring to the collection schedule information and the recyclable part table and to store the recyclable part availability information in a recyclable part availability information memory unit; and a production demand development unit to generate the disassembly plan on recyclable parts according the production demand by referring to the production demand information and the recyclable part availability information, generate a procurement plan on parts and materials that cannot be fully supplied from available, recyclable parts alone, and generate a production plan based on the disassembly and procurement plans. 6. A disassembly plan generation method for creating a disassembly plan to disassemble collected, used products, the method comprising the steps of:storing collection schedule information on each used product and a recyclable part table showing recyclable parts contained in each used product; storing production demand information on products to be manufactured by using the recyclable parts; generating recyclable part availability information by referring to the collection schedule information and the recyclable part table; and generating a recyclable part disassembly plan according to a production demand by referring to the production demand information and the recyclable part availability information. 7. A disassembly plan generation method according to claim 6, wherein those recyclable parts which, when used for the manufacture of a product, have an exclusion relation with each other in the recyclable part table are related to each other and the recyclable part availability information is managed based on the exclusion relation.8. A procurement plan generation method for creating a procurement plan on parts and materials for products to be manufactured, the method comprising the steps of:storing production demand information on products to be manufactured, collection schedule information on individual used products, and a recyclable part table showing recyclable parts contained in the used products; generating recyclable part availability information by referring to the collection schedule information and the recyclable part table; and generating a procurement plan on parts and materials that cannot be fully supplied from available, recyclable parts alone by referring to the production demand information and the recyclable part availability information. 9. A disassembly plan generation method according to claim 8, wherein those recyclable parts which, when used for the manufacture of a product, have an exclusion relation with each other in the recyclable part table are related to each other and the recyclable part availability information is managed based on the exclusion relation.10. A production, procurement and disassembly plan generation method for creating production, procurement and disassembly plans on recyclable products, the method comprising the steps of:storing production demand information on products to be manufactured, collection schedule information on individual used products, and a recyclable part table showing recyclable parts contained in the used products; generating and storing recyclable part availability information by referring to the collection schedule information and the recyclable part table; generating a recyclable part disassembly plan according to the production demand by referring to the production demand information and the recyclable part availability information, generating a procurement plan on parts and materials that cannot be fully supplied from the available, recyclable parts alone, and generating a production plan based on the disassembly and procurement plans.