Method of installation of a tension leg platform
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
E02D-029/09
E02D-029/00
E02B-017/08
E02B-017/00
출원번호
US-0789659
(2004-02-27)
발명자
/ 주소
Wybro,Pieter G.
Wu,Shukai
Treu,Johannes J.
Chaplin,David E.
출원인 / 주소
Modec International LLC
Sea Engineering Associates, Inc.
대리인 / 주소
Andrews Kurth LLP
인용정보
피인용 횟수 :
7인용 특허 :
8
초록▼
A method and system for attaching a TLP to its tendons using pull-down lines to rapidly submerge the hull to installation draft while compensating for inherent hull instability during submergence and to provide motion arrest and aid in station keeping. The system includes tensioning devices mounted
A method and system for attaching a TLP to its tendons using pull-down lines to rapidly submerge the hull to installation draft while compensating for inherent hull instability during submergence and to provide motion arrest and aid in station keeping. The system includes tensioning devices mounted on the TLP, usually one for each tendon. Each tensioning device is equipped with a pull-down line which is connected to the corresponding tendon. The TLP hull is submerged to lock-off draft by applying tensions to the pull-down lines connected to the top of the tensions, or by a combination of applying tensions to the pull-down lines and ballasting the hull. As the tensioners take in pull-down line, the hull submerges, i.e. the draft increases. After lock-off, high levels of tension in the pull-down lines can be rapidly transferred to the connection sleeves by slacking the pull-down lines, thus allowing the TLP to be made storm-safe much faster than by prior art methods which require de-ballasting to tension the tendons. In concert with TLP installation, the method may be used attach the mooring tendons to the seabed by suspending and lowering the tendons into their foundation receptacle in the seabed.
대표청구항▼
What is claimed is: 1. A method for mooring a floating hydrocarbon drilling or production vessel to a plurality of tendons, said vessel characterized by having no temporary stability or buoyancy modules coupled thereto and by having a plurality of tensioning devices and a plurality of connection sl
What is claimed is: 1. A method for mooring a floating hydrocarbon drilling or production vessel to a plurality of tendons, said vessel characterized by having no temporary stability or buoyancy modules coupled thereto and by having a plurality of tensioning devices and a plurality of connection sleeves designed and arranged to receive upper ends of said tendons and be secured thereto, the method comprising the steps of, anchoring lower ends of said tendons to the seafloor, coupling a plurality of pull-down tension members from said tensioning devices to said upper ends of said tendons, tensioning said pull-down tension members using said tensioning devices to further submerge said vessel, concurrently ballasting said vessel, tensioning said pull-down tension members with high tension, submerging said vessel until said connection sleeves receive said upper ends of said tendons, coupling said connection sleeves to said tendons, and rapidly transferring said high tension from said pull-down tension members to said connection sleeves by slacking said pull-down tension members. 2. The method of claim 1 further comprising the step of, controlling tensions in said plurality of pull-down tension members by taking in at least said one of said tension members to increase its tension or paying out at least one of said tension members to decrease its tension. 3. The method of claim 1 further comprising the step of, tensioning said pull-down tension members causing said vessel to submerge without ballasting said vessel. 4. The method of claim 1 wherein said anchoring lower ends of said tendons comprises the steps of, suspending an upper end of one of said tendons from said floating vessel, positioning said tendon above a foundation anchored in seabed, lowering the lower end of said tendon into said foundation, and securing said lower end of said tendon to said foundation. 5. The method of claim 4 further comprising the step of, suspending said tendon by a constant tension device. 6. The method of claim 4 further comprising the step of, providing motion compensation between said suspended tendon and said vessel. 7. The method of claim 4 further comprising the step of, suspending said tendon by a line passing though one of said connection sleeves. 8. The method of claim 7 further comprising the steps of, raising said tendon through said connection sleeve, and then coupling one of said plurality of pull-down tension members to said upper end of said tendon. 9. The method of claim 1 wherein, said pull-down tension members pass through said connection sleeves. 10. A method for installing an offshore floating vessel, said vessel characterized by having no temporary stability or buoyancy modules coupled thereto and by having a connection sleeve designed and arranged to receive an upper end of a generally vertical tensile mooring member and be secured thereto, said mooring member having a lower end anchored to the seafloor, the method comprising the steps of, coupling a pull-down tension member from said vessel through said connection sleeve to said upper end of said mooring member, and tensioning said pull-down tension member to further submerge said vessel, tensioning said pull-down tension member to further submerge said vessel until said connection sleeve receives said upper end of said mooring member, coupling said connection sleeve to said mooring member, and after coupling said connection sleeve to said mooring member, slacking said pull-down tension member. 11. The method of claim 10 wherein, said tensioning is performed by a tensioning device. 12. The method of claim 11 wherein, said tensioning device is a winch. 13. The method of claim 11 wherein, said tensioning device is a strand jack. 14. The method of claim 11 wherein, said tensioning device is coupled to said vessel at a location above the waterline when said connecting sleeve receives said upper end of said mooring member. 15. The method of claim 11 wherein, said tensioning device is removably coupled to said vessel. 16. The method of claim 15 wherein, said tensioning device comprises a stopper or gripper. 17. The method of claim 11 further comprising the step of, routing said pull-down tension member to provide a generally vertical pull to said upper end of said tensile mooring member. 18. The method of claim 17 wherein, said routing is performed by a fairlead which is disposed between said tensioning device and said connection sleeve. 19. The method of claim 11 further comprising the step of, controlling said tensioning device locally. 20. The method of claim 11 further comprising the step of, controlling said tensioning device remotely. 21. The method of claim 10 wherein, said vessel is a tension leg platform. 22. The method of claim 21 wherein said tension leg platform has an integrated deck. 23. The method of claim 10 further comprising the step of, measuring the tension in said pull-down tension member.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (8)
Dove Peter George Scott ; Treu Johannes Jacobus, Anchor installation vessel and method.
Koivusaari, Rauno; Tuokkola, Yrjo; Jarvinen, Arvo; Liljelund, John; Vuorinen, Matti; Kasanen, Erkki; Savolainen, Jorma; Miettinen, Pekka, Method for installing and servicing an apparatus recovering the kinetic energy of water, and an apparatus recovering the kinetic energy of water.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.