IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
UP-0111498
(2005-04-21)
|
등록번호 |
US-7513965
(2009-07-01)
|
발명자
/ 주소 |
- Oldani, Tino
- Jarvi, Daniel
|
출원인 / 주소 |
- Ingersoll Machine Tools, Inc.
|
대리인 / 주소 |
Reinhart Boerner Van Deuren P.C.
|
인용정보 |
피인용 횟수 :
13 인용 특허 :
6 |
초록
▼
An apparatus and method are provided for performing a high-speed event, such as a cut/add of a tow, in an automated fiber placement process, by initiating the high-speed event prior to a fiber placement head reaching a location along a tool path of the fiber placement head at which it is desired to
An apparatus and method are provided for performing a high-speed event, such as a cut/add of a tow, in an automated fiber placement process, by initiating the high-speed event prior to a fiber placement head reaching a location along a tool path of the fiber placement head at which it is desired to have the high-speed event completed.
대표청구항
▼
What is claimed is: 1. A method for performing at least one of cutting or adding a tow, changing tension, temperature, or pressure applied on a tow, on the fly, herein referred to as a high-speed event, in an automated fiber placement process using a fiber placement head of a fiber placement machin
What is claimed is: 1. A method for performing at least one of cutting or adding a tow, changing tension, temperature, or pressure applied on a tow, on the fly, herein referred to as a high-speed event, in an automated fiber placement process using a fiber placement head of a fiber placement machine for fabricating a composite structure, the method comprising the steps of: determining a time-based tool path for the fiber placement head during fabrication of the composite part, including a completion location of the fiber placement head along the tool path at which it is desired to have completed the high-speed event; determining a latency value for the fiber placement machine to perform the high-speed event; and using the latency value to determine an initiation location of the fiber placement head along the tool path disposed sufficiently in advance of the completion location such that initiation of the desired high-speed event at the initiation location of the fiber placement head results in completion of the desired high-speed event substantially at the completion location of the fiber placement head. 2. The method of claim 1, further comprising the step of, initiating the desired high-speed event substantially at the initiation location of the fiber placement head along the tool path. 3. The method of claim 2, wherein the high-speed event is performed according to a desired process. 4. The method of claim 1, further comprising: determining and tabulating a desired position during fabrication of the composite structure for starting or stopping the desired high-speed event; determining and tabulating a completion location of the fiber placement head along the tool path for each desired position for starting or stopping the high speed event; and determining and tabulating an initiation location of the fiber placement head for starting or stopping at least one of the high-speed events. 5. The method of claim 4, further comprising determining and tabulating latency values for the fiber placement machine to perform the high-speed event, and using the tabulated latency values for determining the initiation location of the fiber placement head along the tool path. 6. A computer readable medium having computer executable instructions for performing at least one of cutting or adding a tow, changing tension, temperature, or pressure applied on a tow, on the fly, herein referred to as a high-speed event, in an automated fiber placement process using a fiber placement head of a fiber placement machine for fabricating a composite structure, by determining a time-based tool path for the fiber placement head during fabrication of the composite part, including a completion location of the fiber placement head along the tool path at which is desired to have completed the high-speed event, by determining a latency value for the fiber placement machine to perform the high-speed event, and by using the latency value to determine an initiation location of the fiber placement head along the tool path disposed sufficiently in advance of the completion location such that initiation of the desired high-speed event at the initiation location of the fiber placement head results in completion of the desired high-speed event substantially at the completion location of the fiber placement head. 7. The computer readable medium of claim 6, further comprising instructions for initiating the desired high-speed event substantially at the initiation location of the fiber placement head along the tool path. 8. The computer readable medium of claim 7, further including instructions for performing the high-speed event according to a desired process. 9. The computer readable medium of claim 6, further comprising instructions for: determining and tabulating a desired position during fabrication of the composite structure for staffing or stopping the desired high-speed event; determining and tabulating a completion location of the fiber placement head along the tool path for each desired position for starting or stopping the high speed event; and determining and tabulating an initiation location of he fiber placement head for starting or stopping at least one of the high-speed events. 10. The computer readable medium of claim 9, further comprising instructions for determining and tabulating latency values for the fiber placement machine to perform the high-speed event, and using the tabulated latency values for determining the initiation location of the fiber placement head along the tool path. 11. A method for cutting and adding tows (cut/add) "on-the-fly" in an automated fiber placement process using a fiber placement head of a fiber placement machine for fabricating a composite structure, the method comprising the steps of: determining a time-based tool path for the fiber placement head during fabrication of the composite part, including a completion location of the fiber placement head along the tool path at which is desired to cut/add a tow "on-the-fly;" determining a latency value for the fiber placement machine to cut/add a tow; and using the latency value to determine an initiation location of the fiber placement head along the tool path disposed sufficiently in advance of the completion location such that initiation of the desired "on-the-fly" cut/add at the initiation location of the fiber placement head results in completion of the desired "on-the-fly" cut or add substantially at the completion location of the fiber placement head. 12. The method of claim 11, further comprising, initiating the desired "on-the-fly" cut/add substantially at the initiation location of the fiber placement head along the tool path. 13. The method of claim 12, wherein an end of the tow being cut or added forms part of a crenulated edge. 14. The method of claim 11, further comprising: determining and tabulating a desired start and stop position for each tow of the composite structure; determining and tabulating a completion location of the fiber placement head along the tool path for each desired start and stop position of each tow of the composite structure; and determining and tabulating an initiation location of he fiber placement head for starting or stopping at least one of the tows "on-the-fly." 15. The method of claim 14, further comprising determining and tabulating latency values for the fiber placement machine to cut or add the at least one of the tows "on-the-fly," and using the tabulated latency values for determining the initiation location of the fiber placement head along the tool path.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.