IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
US-0939400
(2007-11-13)
|
등록번호 |
US-8146665
(2012-04-03)
|
발명자
/ 주소 |
|
출원인 / 주소 |
- Halliburton Energy Services Inc.
|
대리인 / 주소 |
|
인용정보 |
피인용 횟수 :
21 인용 특허 :
9 |
초록
▼
A wellbore services manifold trailer comprising a blender connector configured to couple to a blender, a boost pump coupled to the blender connector, a high-pressure pump suction connector coupled to the boost pump and configured to couple to a high-pressure pump, a high-pressure pump discharge conn
A wellbore services manifold trailer comprising a blender connector configured to couple to a blender, a boost pump coupled to the blender connector, a high-pressure pump suction connector coupled to the boost pump and configured to couple to a high-pressure pump, a high-pressure pump discharge connector configured to couple to the high-pressure pump, and a wellhead connector configured to couple to a wellhead is disclosed. A wellbore servicing method comprises receiving a fluid at a first pressure, increasing the pressure of the fluid to a second pressure greater than the first pressure, feeding the fluid to a high-pressure pump at the second pressure, receiving the fluid from the high-pressure pump at a third pressure greater than the second pressure, and feeding the fluid to a wellhead at the third pressure is also disclosed.
대표청구항
▼
1. A wellbore servicing method comprising: transporting a wellbore servicing manifold trailer to a well site to be serviced, wherein the wellbore servicing manifold trailer comprises: a blender connector configured to couple to a blender;a boost pump coupled to the blender connector;a high-pressure
1. A wellbore servicing method comprising: transporting a wellbore servicing manifold trailer to a well site to be serviced, wherein the wellbore servicing manifold trailer comprises: a blender connector configured to couple to a blender;a boost pump coupled to the blender connector;a high-pressure pump suction connector coupled to the boost pump and configured to couple to a high-pressure pump;a flowmeter coupled to the boost pump and the high-pressure pump suction connector;a high-pressure pump discharge connector configured to couple to the high-pressure pump; anda wellhead connector configured to couple to a wellhead;connecting the blender connector to the blender;connecting the high-pressure pump suction connector to the high-pressure pump;connecting the high-pressure pump discharge connector to the high-pressure pump;connecting the wellhead connector to the wellhead;adding a fluid to the blender;mixing the fluid;sending the fluid from the blender at a first pressure to the wellbore servicing manifold trailer;pressuring the fluid to a second pressure higher than the first pressure using the boost pump;measuring a fluid flow with the flowmeter and adjusting a flow rate of the boost pump or the second pressure of the boost pump based on the fluid flow;sending the fluid from the wellbore servicing manifold trailer to the high-pressure pump;pressuring the fluid to a third pressure higher than the second pressure using the high-pressure pump;sending the fluid from the high-pressure pump to the wellbore servicing manifold trailer; andsending the fluid from the wellbore servicing manifold trailer to the wellhead. 2. The method of claim 1, wherein the boost pump is a centrifugal pump. 3. The method of claim 1, wherein the high-pressure pump is a positive displacement pump. 4. The method of claim 1, wherein the first pressure is equal to or less than about 100 psi,wherein the second pressure is equal to or greater than about 60 psi, andwherein the third pressure is equal to or greater than about 2,000 psi. 5. The method of claim 1, wherein the first pressure is equal to or less than about 60 psi,wherein the second pressure is equal to or greater than about 80 psi, andwherein the third pressure is equal to or greater than about 10,000 psi. 6. The method of claim 1, wherein the wellbore servicing manifold trailer further comprises: a bypass valve assembly coupled to the blender connector, the boost pump, and the high-pressure pump suction connector,wherein the bypass valve assembly is configured to allow fluid flow between the blender connector and the boost pump and prohibit fluid flow between the blender connector and the high-pressure pump suction connector in a first position, andwherein the bypass valve assembly is configured to allow fluid flow between the blender connector and high-pressure pump suction connector and prohibit fluid flow between the blender connector and the boost pump in a second position. 7. The method of claim 1, wherein the orientation of the flowmeter is substantially vertical. 8. The method of claim 1, wherein the wellbore servicing manifold trailer further comprises a power source for generating power for the boost pump. 9. The method of claim 8, wherein the wellbore servicing manifold trailer further comprising a hydraulic control system coupled to the power source and the boost pump. 10. The method of claim 9, further comprising controlling the flow rate of the boost pump or the second pressure of the boost pump using the hydraulic control system. 11. The method of claim 10, wherein the flow rate of the boost pump or the second pressure of the boost pump is controlled to substantially reduce or eliminate cavitation of the high-pressure pump. 12. The method of claim 8, wherein wellbore servicing manifold trailer further comprising a plurality of lights powered by the power source. 13. The method of claim 1, wherein the pressuring the fluid to the second pressure higher than the first pressure using the boost pump substantially reduces or eliminates cavitation of the high-pressure pump. 14. The method of claim 1, wherein the fluid comprises proppants, water, chemicals, or combinations thereof. 15. The method of claim 1, wherein the fluid comprises liquefied carbon dioxide, liquefied nitrogen, or other liquefied inert gas. 16. The method of claim 1, wherein the wellbore servicing manifold trailer further comprising a vapor/liquid separator upstream from the boost pump to remove vapor from the fluid prior to entering the boost pump. 17. The method of claim 1, wherein the wellbore servicing manifold trailer further comprises: a plurality of high-pressure pump suction connectors coupled to the boost pump and configured to couple to a corresponding plurality of high-pressure pumps; anda plurality of high-pressure pump discharge connectors configured to couple to the plurality of high-pressure pumps. 18. The method of claim 1, wherein the wellbore servicing manifold trailer further comprises a plurality of wellhead connectors configured to couple to the wellhead. 19. The method of claim 1, wherein the fluid added to the blender at a supply pressure, and wherein mixing the fluid comprises raising the pressure of the fluid from the supply pressure to the first pressure.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.