A control system is provided for a generator set coupled to supply electrical power to an external load. The control system may have an input device configured to receive input indicative of a desired adjustment to the external load, and a power control device operable to affect a power output of th
A control system is provided for a generator set coupled to supply electrical power to an external load. The control system may have an input device configured to receive input indicative of a desired adjustment to the external load, and a power control device operable to affect a power output of the generator set. The control system may also have a controller in communication with the input device and the power control device. The controller may be configured to determine a change in the power output of the generator set corresponding to the desired adjustment to the external load, and to operate the power control device to implement the change in power output of the generator set before the desired adjustment to the external load is initiated.
대표청구항▼
1. A control system, comprising: an electric generator set coupled to supply electrical power to a plurality of external electrical loads;an input device configured to receive input requesting activation of an external electrical load of the plurality of external electrical loads;a power control dev
1. A control system, comprising: an electric generator set coupled to supply electrical power to a plurality of external electrical loads;an input device configured to receive input requesting activation of an external electrical load of the plurality of external electrical loads;a power control device operable to affect a power output of the generator set; anda controller in communication with the input device and the power control device, the controller being configured to: receive, responsive to the input, information identifying the external electrical load requested to be activated;determine, based on the information identifying the external electrical load, a startup power profile for the external electrical load;determine a change in the power output of the generator set corresponding to the startup power profile for the external electrical load; andoperate the power control device to implement the change in power output of the generator set before the requested activation of the external electrical load is initiated. 2. The control system of claim 1, wherein the input device is a manual input device. 3. The control system of claim 2, wherein the input device is an activation switch configured to initiate operation of the external electrical load. 4. The control system of claim 3, wherein the controller is further configured to: associate a time delay with the activation switch; andinhibit operation of the external electrical load until after the change in power output of the generator set has been implemented. 5. The control system of claim 3, further including a sensor configured to generate a signal indicative of operation of the generator, wherein the controller is configured to inhibit operation of the external electrical load until the signal indicates a desired amount of the change in power output of the generator set has been implemented. 6. The control system of claim 1, wherein the power control device is associated with an engine of the generator set. 7. The control system of claim 6, wherein the power control device is configured to affect at least one of fueling and air flow of the engine. 8. The control system of claim 1, wherein the startup power profile for the external electrical load is known prior to receipt of the input. 9. The control system of claim 1, wherein the controller is configured to determine the startup power profile for the external electrical load by measuring a magnitude of the startup power profile for the external electrical load when the input is received and before activation of the external load is initiated. 10. The control system of claim 1, wherein the information identifying the external electrical load includes a type of the external electrical load, and the controller is configured to determine the startup power profile for the external electrical load based on the type of the external electrical load when the input is received and before activation of the external electrical load is initiated. 11. A method for supplying electrical power, comprising: operating an electric generator set that supplies electrical power to a plurality of external electrical loads;receiving input requesting activation of an external electrical load of the plurality of external electrical loads;responsive to the input, receiving information identifying the external electrical load requested to be activated;determining, based on the information identifying the external electrical load, a startup power profile for the external electrical load;determining a change in the power output of the generator set corresponding to the startup power profile for the external electrical load; andimplementing the change in the power output of the generator set before the requested activation of the external electrical load is initiated. 12. The method of claim 11, further including delaying activation of the external electrical load an amount of time after receipt of the manual input such that the change in power output of the generator set is implemented before activation of the external electrical load. 13. The method of claim 11, further including: sensing operation of the generator; anddelaying activation of the external electrical load after receipt of the manual input until the sensed operation of the generator indicates a desired amount of the change in the power output corresponding to the requested activation of the external electrical load has been implemented. 14. The method of claim 11, wherein the startup power profile for the external electrical load is known prior to receipt of the manual input. 15. The method of claim 11, wherein determining the startup power profile for the extern load includes measuring a magnitude of a required startup power of the external electrical load when the manual input is received and before activation of the external electrical load is initiated. 16. The method of claim 11, wherein the information identifying the external electrical load includes a type of the external electrical load, and the method further includes determining the startup power profile based on the type of the external electrical load when the manual input is received and before activation of the external electrical load is initiated. 17. A generator set, comprising: a prime mover;a prime mover control device operable to affect a mechanical power output of the prime mover;an electric generator driven by the mechanical power output of the prime mover to create an electrical power output used to power a plurality of external electrical loads;an input device configured to receive input requesting activation of an external electrical load of the plurality of external electrical loads; anda controller in communication with the prime mover control device and the input device, the controller being configured to: receive, responsive to the input, information identifying the external electrical load requested to be activated;determine, based on the information identifying the external electrical load, a startup power profile for the external electrical load;determine a change in mechanical power output of the prime mover corresponding to the startup power profile for the external electrical load; andoperate the prime mover control device to implement the change in mechanical power output of the prime mover before the desired requested activation of the external electrical load is initiated. 18. The control system of claim 1, wherein the controller is further configured to: determine whether the requested activation of the external electrical load powered would cause a change in speed of the prime mover greater than a threshold; andresponsive to determining that the requested activation of the external electrical load powered would cause a change in speed of the prime mover greater than the threshold: determine a change in the power output of the generator set corresponding to the startup power profile for the external electrical load; andoperate the power control device to implement the change in power output of the generator set before the desired activation of the external electrical load is initiated.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (25)
Thornberg Christopher A. (Newtown CT) Cotton Bryan S. (Monroe CT), Automatic engine speed hold control system.
Aldrich, III, William L.; O'Connell, Glenn P.; Hoang, Tony T.; Velliky, Michael L., Method and system for alternator load modeling for internal combustion engine idle speed control.
Tabaian,Fereydun; Hejazi,Ali; Sadati,Hamed; Ashrafzadeh,Ahmad, Programmable calibration circuit for power supply current sensing and droop loss compensation.
Rademacher, Eric Michael; Pebley, Kirk; Tomik, Filip; Celinske, David; Symanow, David Anthony, Control of vehicle electrical loads during engine auto stop event.
Albsmeier, Eric D.; Dorn, Douglas W.; Gross, William Herman; Sember, Andrew John; Hackbarth, Anthony J., Generator controller configured for preventing automatic transfer switch from supplying power to the selected load.
Pebley, Kirk; Jackson, Kenneth J.; Gee, Thomas Scott, Method and apparatus for improved climate control function in a vehicle employing engine stop/start technology.
Mauk, Richard A.; Gross, William Herman; Kroll, Gary Allen; Pierringer, Jayson, System and method for using a network to control a power management system.
Zhang, Yanchai; Snopko, Michael A.; Chang, Insu; Janardhan, Vijay; Converse, Perry D., Systems, apparatuses, and methods to control output power of groups of engines.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.