최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
DataON 바로가기다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
Edison 바로가기다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
Kafe 바로가기국가/구분 | United States(US) Patent 등록 |
---|---|
국제특허분류(IPC7판) |
|
출원번호 | US-0576790 (2009-10-09) |
등록번호 | US-8267170 (2012-09-18) |
발명자 / 주소 |
|
출원인 / 주소 |
|
인용정보 | 피인용 횟수 : 46 인용 특허 : 736 |
A plurality of first barrier wells are formed in a formation for a first barrier. A substantially constant spacing separates adjacent first barrier wells. The formation is analyzed to determine the principal fracture direction of at least one layer of the formation. An offset distance of second barr
A plurality of first barrier wells are formed in a formation for a first barrier. A substantially constant spacing separates adjacent first barrier wells. The formation is analyzed to determine the principal fracture direction of at least one layer of the formation. An offset distance of second barrier wells relative to first barrier wells is determined based on the principal fracture direction to limit a maximum separation distance between a closest barrier well and a theoretical fracture extending between the first barrier and the second barrier along the principal fracture direction to a distance of less than one half of the spacing that separates adjacent first barrier wells. The second barrier wells are offset from the first barrier wells by a distance that is at least substantially the same as the offset distance.
1. A method of positioning wellbores for forming a double barrier for at least a portion of a treatment area, comprising: forming a plurality of first barrier wells in the formation for a first barrier, wherein a substantially constant spacing separates adjacent first barrier wells;analyzing the for
1. A method of positioning wellbores for forming a double barrier for at least a portion of a treatment area, comprising: forming a plurality of first barrier wells in the formation for a first barrier, wherein a substantially constant spacing separates adjacent first barrier wells;analyzing the formation to determine the principal direction of water flow in at least one layer of the formation;determining an offset distance of the second barrier wells relative to the first barrier wells based on the principal direction of water flow in at least one layer to limit a maximum separation distance between a closest barrier well and a theoretical breach extending from the first barrier to the second barrier along the principal direction of water flow to a distance of less than one half of the spacing that separates adjacent first barrier wells; andforming a plurality of second barrier wells in the formation for a second barrier to a side of the first barrier wells by a substantially constant separation distance, wherein the second barrier wells are offset from the first barrier wells by a distance that is at least substantially the same as the offset distance. 2. The method of claim 1, wherein the first barrier wells are freeze wells. 3. The method of claim 1, wherein the second barrier wells are freeze wells. 4. The method of claim 1, further comprising forming the first barrier. 5. The method of claim 1, further comprising forming the second barrier. 6. The method of claim 1, wherein the offset distance is chosen to limit the maximum separation distance between the closest barrier well and the theoretical breach extending from the first barrier to the second barrier along the principal direction of water flow to a distance of about one fourth of the spacing that separates adjacent first barrier wells. 7. The method of claim 1, wherein the substantially constant spacing is at least 2 m. 8. The method of claim 1, wherein at least some of the first barrier wells are freeze wells and at least some of the second barrier wells are grout wells. 9. The method of claim 1, wherein at least some of the first barrier wells and at least some of the second barrier wells are substantially horizontal. 10. The method of claim 1, wherein at least some of the first barrier wells and at least some of the second barrier wells are substantially vertical. 11. The method of claim 1, wherein the treatment area has a permeability of at least 1 darcy. 12. A method of positioning wellbores for forming a double barrier for at least a portion of a treatment area and treating a hydrocarbon containing formation, comprising: forming a plurality of first barrier wells in the formation for a first barrier, wherein a substantially constant spacing separates adjacent first barrier wells;analyzing the formation to determine the principal direction of water flow in at least one layer of the formation;determining an offset distance of the second barrier wells relative to the first barrier wells based on the principal direction of water flow in at least one layer to limit a maximum separation distance between a closest barrier well and a theoretical breach extending from the first barrier to the second barrier along the principal direction of water flow to a distance of less than one half of the spacing that separates adjacent first barrier wells;forming a plurality of second barrier wells in the formation for a second barrier to a side of the first barrier wells by a substantially constant separation distance, wherein the second barrier wells are offset from the first barrier wells by a distance that is at least substantially the same as the offset distance, and wherein the first and second barrier wells at least partially surrounds a treatment area in the formation;providing heat to at least part of formation from one or more heat sources located in the treatment area; andmobilizing at least some hydrocarbons located in the treatment area with the provided heat. 13. The method of claim 12, further comprising producing at least a portion of the mobilized fluids from the treatment area. 14. The method of claim 12, wherein the first barrier wells and the second barrier wells are freeze wells. 15. The method of claim 12, wherein the offset distance is chosen to limit the maximum separation distance between the closest barrier well and the theoretical breach extending from the first barrier to the second barrier along the principal direction of water flow to a distance of about one fourth of the spacing that separates adjacent first barrier wells. 16. The method of claim 12, wherein the substantially constant spacing is at least 2 m. 17. The method of claim 12, wherein at least some of the first barrier wells are freeze wells and at least some of the second barrier wells are grout wells. 18. The method of claim 12, wherein at least some of the first barrier wells and at least some of the second barrier wells are substantially horizontal. 19. The method of claim 12, wherein at least some of the first barrier wells and at least some of the second barrier wells are substantially vertical. 20. The method of claim 12, wherein the treatment area has a permeability of at least 1 darcy.
Copyright KISTI. All Rights Reserved.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.