An approach for making shifted schedules from a regular or master schedule of a building automation system. Shifted schedules may be obtained by applying shifts to the scheduled-on and scheduled-off periods of the days in the master schedule. One set of shifts may apply uniformly to all days of the
An approach for making shifted schedules from a regular or master schedule of a building automation system. Shifted schedules may be obtained by applying shifts to the scheduled-on and scheduled-off periods of the days in the master schedule. One set of shifts may apply uniformly to all days of the week or several sets of different shifts may apply to various days of the week. Special events with certain scheduled-on and scheduled-off periods and assigned to particular days may override the regular scheduled-on and scheduled-off periods of those days. The shifted schedules may also contain special events with their periods shifted. The master schedule may govern the regular operating hours of a building and the shifted schedules may control, for example, HVAC equipment in particular zones, certain employee areas, parking lot lights, and so on. Changes to the master schedule may be applied as updates to the shifted schedules.
대표청구항▼
1. A method for shifting a schedule for a building automation system, comprising: providing a master schedule having a plurality of days, at least two of the plurality of days each having a scheduled-on period and a scheduled-off period; andapplying shifts to at least some of the scheduled-on period
1. A method for shifting a schedule for a building automation system, comprising: providing a master schedule having a plurality of days, at least two of the plurality of days each having a scheduled-on period and a scheduled-off period; andapplying shifts to at least some of the scheduled-on periods and scheduled-off periods of the plurality of days;wherein: shifts applied to the scheduled-on periods of two or more days of the master schedule can be of different amounts of time;shifts applied to the scheduled-off periods of two or more days of the master schedule can be of different amounts of time;the scheduled-on period has a state that is true;the scheduled-off period has a state that is false;the scheduled-on period begins with a false-to-true transition and ends with a true-to-false transition;the scheduled-off period begins with a true-to-false transition and ends with a false-to-true transition;a shift of a scheduled-on period is an amount of time that a false-to-true transition is shifted; anda shift of a scheduled-off period is an amount of time that a true-to-false transition is shifted;the method further comprising controlling operation of components of the building automation system by setting one or more weekly schedule components having instances of an object type that defines the amount of time the false-to-true transition is shifted and the amount of time the true-to-false transition is shifted. 2. The method of claim 1, wherein: the master schedule can have one or more special events on one or more days;the special events have scheduled-on and scheduled-off periods; andthe scheduled-on and scheduled-off periods of the special events replace the scheduled-on and scheduled-off periods of the one or more days on which the one or more special events are scheduled; andwherein a shift can be applied to the scheduled-on period and/or the scheduled-off period of the one or more special events. 3. The method of claim 1, wherein: shifts applied to the scheduled-on periods of two or more days of the master schedule are equal in amounts of time; and/orshifts applied to the scheduled-off periods of two or more days of the master schedule are equal in amounts of time. 4. The method of claim 1, wherein: shifts applied to the scheduled-on periods of two or more days of the master schedule are of different amounts of time; and/orshifts applied to the scheduled-off periods of two or more days of the master schedule are of different amounts of time. 5. The method of claim 1, wherein: one set of shifts applied to the scheduled-on and scheduled-off periods of the master schedule results in a shifted schedule; andanother set of shifts applied to the scheduled-on and scheduled-off periods of the master schedule results in another shifted schedule. 6. The method of claim 1, wherein: the scheduled-on and scheduled-off periods of the master schedule are adjustable; andan adjustment in scheduled-on and/or scheduled-off periods of the master schedule is provided as an update to corresponding shifted scheduled-on and/or scheduled-off periods of a shifted schedule. 7. The method of claim 1, wherein: the master schedule is defined for normal operating hours at a building;a first shifted schedule having at least one shift applied to the scheduled-on periods and/or scheduled-off periods of the master schedule is established for outside of the building; anda second shifted schedule having at least one shift applied to the scheduled-on periods and/or scheduled-off periods of the master schedule is established for a certain zone inside of the building. 8. A schedule shifting system for a building automation system, comprising: a regular schedule having scheduled-on and scheduled-off periods for each day in the regular schedule; andone or more shifted schedules derived from the regular schedule, wherein the shifted schedules replicate the regular schedule but have shifts in at least some of the scheduled-on and scheduled-off periods of the regular schedule;wherein: shifts of a first shifted schedule of the shifted schedules applied to scheduled-on periods of different days of the regular schedule can be unequal amounts of time;shifts of the first shifted schedule and/or another shifted schedule of the shifted schedules applied to scheduled-off periods of different days of the regular schedule can be unequal amounts of time;scheduled-on periods have states that are true;scheduled-off periods have states that are false;scheduled-on periods begin with a false-to-true transition and end with a true-to-false transition;scheduled-off periods begin with a true-to-false transition and end with a false-to-true transition;a shift of a scheduled-on period is an amount of time that a false-to-true transition is shifted; anda shift of a scheduled-off period is an amount of time that a true-to-false transition is shifted;further wherein the schedule shifting system comprises a processor configured to control operation of components of the building automation system by setting one or more weekly schedule components having instances of an object type that defines the amount of time the false-to-true transition is shifted and the amount of time the true-to-false transition is shifted. 9. The system of claim 8, wherein: the regular schedule can comprise one or more special events on one or more days having scheduled-on and scheduled-off periods which override scheduled-on and/or scheduled-off periods of the one or more days to which the special events are assigned; anda shifted schedule can comprise the one or more special events with shifted scheduled-on and scheduled-off periods. 10. The system of claim 8, wherein: shifts of a shifted schedule applied to scheduled-on periods of at least two of the days of the regular schedule are equal amounts of time; and/orshifts of a shifted schedule applied to scheduled-off periods of at least two of the days of the regular schedule are equal amounts of time. 11. The system of claim 8, wherein: shifts of a shifted schedule applied to scheduled-on periods of at least two of the days of the regular schedule are unequal amounts of time; and/orshifts of a shifted schedule applied to scheduled-off periods of at least two of the days of the regular schedule are unequal amounts of time. 12. The system of claim 8, wherein: the scheduled-on and scheduled-off periods of the regular schedule are adjustable; anda change in the scheduled-on and scheduled-off periods for any day of the regular schedule is provided as an update of at least one of the one or more shifted schedules. 13. The system of claim 8, wherein the shifted schedules are built on a framework system. 14. A method for shifting a master schedule for a building automation system, comprising: providing a master schedule in a framework system, the master schedule having a plurality of days, at least two of the plurality of days having scheduled off-to-on and scheduled on-to-off transitions, the framework system having one or more types of weekly schedule components having data values; andapplying shifts to at least some of the scheduled off-to-on and scheduled on-to-off transitions of the master schedule; andwherein: a shift is an amount of time that a scheduled off-to-on or on-to-off transition is shifted;shifts applied to scheduled off-to-on transitions on different days of the master schedule can be unequal; andshifts applied to scheduled on-to-off transitions on different days of the master schedule can be unequal;the method further comprising controlling operation of components of the building automation system by setting one or more weekly schedule components having instances of an object type that defines the amount of time the off-to-on transition is shifted and the amount of time the on-to-off transition is shifted. 15. The method of claim 14, wherein: two or more shifts applied to scheduled off-to-on transitions of two or more days, respectively, of the master schedule are unequal; and/ortwo or more shifts applied to scheduled on-to-off transitions of two or more days, respectively, of the master schedule are unequal. 16. The method of claim 15, wherein: the master schedule can have one or more special events;a special event has scheduled off-to-on and scheduled on-to-off transitions;the scheduled off-to-on and scheduled on-to-off transitions of a special event replace the scheduled off-to-on and scheduled on-to-off transitions of one or more days having special event(s); andthe scheduled off-to-on and scheduled on-to-off transitions of the special event can be shifted. 17. The method of claim 14, wherein: applying one or more shifts to scheduled off-to-on and/or scheduled on-to-off transitions of one or more days of the master schedule results in a shifted schedule;the scheduled off-to-on and scheduled on-to-off transitions of the master schedule are adjustable; anda change in the scheduled off-to-on and scheduled on-to-off transitions for any day of the master schedule can be an update to the shifted schedule. 18. The method of claim 14, wherein the data values of schedule components are of a type selected from a group consisting of Boolean, numeric, enumeration and string types. 19. The method of claim 18, wherein the data values include data values of a Boolean type.
Woods David D. (Murrysville PA) Elm William C. (Monroeville PA) Lipner Melvin H. (Monroeville PA) Butterworth ; III George E. (Monroeville PA) Easter James R. (Pittsburgh PA), Alarm management system.
Christine M. Ditmer ; James DeGraf-Johnson ; Paul Glenn Franklin ; William C. Holford ; Randall W. King ; Patrick W. Pirtle ; Kenneth Joseph Qualls ; Diane J. Wells ; Edward Ronald Zack, Jr., Integrated proxy interface for web based alarm management tools.
Metcalfe Alan G. (Onalaska WI) Johnson Tedd P. (La Crosse WI) Foye David M. (La Crosse WI), Method and apparatus for configuring and controlling a load.
Bristol, Edgar H., Method and apparatus for extending processing mask/filtering, and displaying alarm information for a hierarchically categorizing alarm monitoring system.
Kreiner Barrett Morris ; Litwin Edward Paul, Method and system for processing a memory map to provide listing information representing data within a database.
Blunn, Brad M.; Johnson, Tedd P.; Shedivy, Eugene R.; McKeever, James K.; Bjorklund, Chad A.; Watercott, Dwight J., Optimization of building ventilation by system and zone level action.
McIntyre, James P.; Rowley, Kenneth; Jones, Derrick C.; Mody, Pankaj H., Remotely monitoring/diagnosing distributed components of a supervisory process control and manufacturing information application from a central location.
Nair, Ajay N.; Jhangavel, Sundaramoorthi; Bharati, Manjesh; Marti, Jerry, Quick connect and disconnect, base line configuration, and style configurator.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.