A method for controlling an amount of material transferred in a system having a plurality of material feeds and concurrent material transfer periods. The method comprising steps of: supplying each of a primary material having a target weight and a secondary material, to a receiving vessel; determini
A method for controlling an amount of material transferred in a system having a plurality of material feeds and concurrent material transfer periods. The method comprising steps of: supplying each of a primary material having a target weight and a secondary material, to a receiving vessel; determining a decision threshold; feeding the primary material to the receiving vessel, feeding the secondary material into the receiving vessel as or after the primary material begins feeding and before the decision threshold, determining a feed status of the primary and secondary materials at the decision threshold; changing the feed status of one of the primary or secondary materials at the decision threshold; and feeding only the primary material within a feed alone time period until the target weight amount is fed.
대표청구항
▼
1. A method for controlling an amount of material transferred in a system having a plurality of material feeds and concurrent material transfer periods, the method comprising steps of: a. providing a receiving vessel coupled to a load sensing element,b. providing a primary material supply to the rec
1. A method for controlling an amount of material transferred in a system having a plurality of material feeds and concurrent material transfer periods, the method comprising steps of: a. providing a receiving vessel coupled to a load sensing element,b. providing a primary material supply to the receiving vessel,c. providing a Target Weight (TW) amount for a primary material,d. providing a secondary material supply comprising a secondary material feed sensing element,e. determining a feed alone time period for the primary material, the feed alone time period beginning at a feed alone time thresholdf. beginning to feed the primary material to the receiving vessel via the primary material supply,g. determining the actual feed rate of the primary material,h. starting to feed the secondary material into the receiving vessel as or after the primary material begins feeding into the receiving vessel, and before the feed alone time threshold,i. determining a feed status of the primary and secondary material feeds at the feed alone time threshold,j. ceasing to feed the primary material when the secondary material has an active feed status at the feed alone time threshold,k. resuming to feed the primary material as or after the secondary material feeding stops, andl. feeding only the primary material within the feed alone time period until the TW amount is fed. 2. The method according to claim 1 further comprising the step of verifying that the receiving vessel has sufficient capacity to hold the primary and secondary materials prior to initiating the feeding of the primary material. 3. The method according to claim 1 wherein the step of providing a secondary material supply comprising a secondary material feed sensing element comprises providing a material flow sensing element. 4. The method according to claim 1 wherein the step of providing a secondary material supply comprising a secondary material feed sensing element comprises providing a material weight sensing element. 5. The method according to claim 1 further comprising the steps of: p. providing a tertiary material supply comprising a tertiary material feed sensing element,q. starting to feed the tertiary material into the receiving vessel as or after the primary material begins feeding into the receiving vessel, and before the feed alone time threshold,r. determining a feed status of the tertiary material feed at the feed alone time threshold,s. ceasing to feed the primary material when the tertiary material has an active feed status at the feed alone time threshold,t. resuming to feed the primary material as or after the secondary and tertiary material feeding stops or completes, andu. feeding only the primary material within the feed alone time period until the TW amount is fed. 6. The method according to claim 1 further comprising steps of: m. feeding a first pre-weighed portion of the secondary material as or after the primary material begins feeding into the receiving vessel, and before the feed alone time threshold,n. pre-weighing a second portion of the secondary material during the concurrent feeding period,o. feeding the pre-weighed second portion of the second material after the first portion of the secondary material is fed into the receiving vessel, and before the feed alone time threshold. 7. The method according to claim 1 further comprising the step of: p. initiating the feeding of a secondary material into the receiving vessel after the TW of the primary material has been fed into the receiving vessel. 8. The method according to claim 1 further comprising the step of: p. determining a material feed cutoff point using a predicted spill for the material. 9. The method according to claim 1 further comprising the steps of: p. providing a tertiary material supply comprising a tertiary material feed sensing element,q. starting to feed the tertiary material into the receiving vessel before, at, or after the feed alone time threshold and before feeding the primary material resumes,r. resuming to feed the primary material as or after the secondary and tertiary material feeding has stopped or completed, ands. feeding only the primary material within the feed alone time period until the TW amount is fed. 10. The method according to claim 1 further comprising the steps of: m. defining a plurality of flow regions for at least one of the primary and secondary material feeds, each flow region defined by a minimum flow rate and a maximum flow rate,n. providing a distinct flow rate dependent spill prediction model for at least one of the plurality of regions,o. predicting a spill amount for the material feed according to the actual flow rate using the spill prediction model,p. adjusting a feed cutoff time for the material feed according to a target material feed amount and the predicted spill. 11. A method for controlling an amount of material transferred in a system having a plurality of material feeds and concurrent material transfer periods, the method comprising steps of: a. providing a receiving vessel coupled to a load sensing element,b. providing a primary material supply to the receiving vessel,c. providing a Target Weight (TW) amount for a primary material,d. providing a secondary material supply comprising a secondary material feed sensing element,e. determining a feed alone time threshold for the primary material,f. beginning to feed the primary material to the receiving vessel via the primary material supply,g. determining the actual feed rate of the primary material,h. starting to feed the secondary material into the receiving vessel as or after the primary material begins feeding into the receiving vessel,i. determining a feed status of the primary and secondary material feeds at the feed alone time threshold,j. ceasing to feed the secondary material when the primary material has an active feed status at the feed alone time threshold,k. feeding only the primary material after the feed alone time threshold until the TW amount is fed, andl. resuming to feed the secondary material as or after the primary material has completed feeding. 12. The method according to claim 11 further comprising the step of verifying that the receiving vessel has sufficient capacity to hold the primary and secondary materials prior to initiating the feeding of the primary material. 13. The method according to claim 11 wherein the step of providing a secondary material supply comprising a secondary material feed sensing element comprises providing a material flow sensing element. 14. The method according to claim 11 wherein the step of providing a secondary material supply comprising a secondary material feed sensing element comprises providing a material weight sensing element. 15. The method according to claim 11 further comprising the steps of: v. providing a tertiary material supply comprising a tertiary material feed sensing element,w. starting to feed the tertiary material into the receiving vessel as or after the primary material begins feeding into the receiving vessel, and before the feed alone time threshold,x. determining a feed status of the tertiary material feed at the feed alone time threshold,y. ceasing to feed the tertiary material when the primary material has an active feed status at the feed alone time threshold,z. feeding only the primary material after the feed alone time threshold until the TW amount is fed, andaa. resuming to feed the tertiary material as or after the primary material feeding is completed. 16. The method according to claim 11 further comprising steps of: q. feeding a first pre-weighed portion of the secondary material as or after the primary material begins feeding into the receiving vessel, and before the feed alone time threshold,r. pre-weighing a second portion of the secondary material during the concurrent feeding period,s. feeding the pre-weighed second portion of the second material after the first portion of the secondary material is fed into the receiving vessel, and before the feed alone time threshold. 17. The method according to claim 11 further comprising the step of: t. initiating the feeding of a secondary material into the receiving vessel after the TW of the primary material has been fed into the receiving vessel. 18. The method according to claim 11 further comprising the steps of: t. providing a tertiary material supply comprising a tertiary material feed sensing element,u. starting to feed the tertiary material into the receiving vessel at or after the feed alone time threshold and before feeding the primary material resumes,v. resuming to feed the primary material as or after the secondary and tertiary material feeding has stopped or completed, andw. feeding only the primary material within the feed alone time period until the TW amount is fed. 19. The method according to claim 11 further comprising the step of: p. determining a material feed cutoff point using a predicted spill for the material. 20. The method according to claim 11 further comprising the steps of: m. defining a plurality of flow regions for at least one of the primary and secondary material feeds, each flow region defined by a minimum flow rate and a maximum flow rate,n. providing a distinct flow rate dependent spill prediction model for at least one of the plurality of regions,o. predicting a spill amount for the material feed according to the actual flow rate using the spill prediction model, adjusting a feed cutoff time for the material feed according to a target material feed amount and the predicted spill.