The present invention comprises a method and system for a rapid and automated creation of a price schedule comprising steps and an implementation for providing a set of construction (or other) plans created with an architectural, civil, industrial or other software design tool, such as CAD, and opti
The present invention comprises a method and system for a rapid and automated creation of a price schedule comprising steps and an implementation for providing a set of construction (or other) plans created with an architectural, civil, industrial or other software design tool, such as CAD, and optionally a palette of 2-dimensional and/or 3-dimensional architectural parametric symbols that correspond to respective construction plan elements, such as windows, doors, acrylic glass blocks and/or sky lights. At least one parametric symbol corresponding to a construction plan element is preferably inserted into the construction plans. A cost value for each of the inserted parametric symbols is preferably calculated corresponding to respective plan elements. A price schedule is then optionally created which includes the total cost for all of the inserted parametric symbols corresponding to respective plan elements.
대표청구항▼
1. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by
1. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:transmitting data corresponding to the one or more construction plan elements from the computer to a database storing current pricing data for construction materials;receiving from the database pricing data for the one or more construction plan elements; andgenerating the price schedule from the received pricing data. 2. The medium of claim 1 wherein execution of the add-on computer software code further causes the computer to generate a price schedule for a construction project by at least: inserting one or more parametric symbols selected by a user into the construction plan file, wherein the parametric symbols correspond to one or more construction plan elements. 3. The medium of claim 2 wherein the price schedule includes a total cost for all of the construction plan elements corresponding to the inserted parametric symbols. 4. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:extracting data from the construction plan file, wherein the data indicates the one or more construction plan elements;transmitting the extracted data from the computer to a database storing current pricing for construction materials;receiving from the database pricing data for the one or more construction plan elements; andgenerating a price schedule based on the received pricing data. 5. The medium of claim 4 wherein execution of the add-on computer software code further causes the computer to generate a price schedule for the construction plan file by at least: inserting the price schedule into the construction plan file. 6. The medium of claim 4 wherein execution of the add-on computer software code further causes the computer to generate a price schedule for the construction plan file by at least: inserting the price schedule into a file separate from the construction plan file. 7. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:transmitting data corresponding to the one or more construction plan elements from the computer to a database storing current pricing for construction materials;receiving from the database a first set of pricing data for the one or more construction plan elements;generating a first price schedule from the received first set of pricing data;receiving from the database a second set of pricing data for the one or more construction plan elements; andgenerating a second price schedule from the received second set of pricing data. 8. The medium of claim 7 wherein the first set of pricing data corresponds to prices from a first set of manufacturers for the one or more construction plan elements, and the second set of pricing data corresponds to prices from a second set of manufacturers for the one or more construction plan elements. 9. The medium of claim 7 wherein the first set of pricing data corresponds to prices from a first set of distributors for the one or more construction plan elements, and the second set of pricing data corresponds to prices from a second set of distributors for the one or more construction plan elements. 10. The medium of claim 7 wherein the first set of pricing data corresponds to prices associated with a first geographic area, and the second set of pricing data corresponds to prices associated with a second geographic area. 11. The medium of claim 7 wherein the second set of pricing data corresponds to prices associated with green alternatives to construction materials associate with the first set of pricing data. 12. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:transmitting data corresponding to the one or more construction plan elements from the computer to a database storing current pricing for construction materials;receiving from the database pricing data for the one or more construction plan elements for which pricing data is available; andgenerating a schedule indicating, for each of the one or more construction plan elements, the available pricing data or an indication that pricing data is not available. 13. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:transmitting data corresponding to the one or more construction plan elements from the computer to a database storing current pricing for construction materials;receiving from the database pricing data for the one or more construction plan elements;generating a price schedule from the received pricing data; andinserting the price schedule into the construction plan file. 14. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a schedule for a construction plan file created by the software design tool,the construction plan file including one or more construction plan elements by at least:transmitting data corresponding to the one or more construction plan elements from the computer to a database storing current pricing for construction materials;receiving from the database, green information for any of the one or more construction plan elements, wherein the green information indicates whether or not the construction plan elements fulfill one or a plurality of predetermined environmental or efficiency criteria or requirements, or both; andgenerating the price schedule including the received green information. 15. The medium of claim 14 wherein execution of the add-on computer software code further causes the computer to generate a schedule for the construction plan file by at least: receiving from the database pricing data for the one or more construction plan elements; andgenerating the schedule to include the received pricing data. 16. A non-transitory computer readable medium usable by a computer that includes a processor and a memory, the medium comprising: an add-on computer software code that runs as an internal component within a software design tool on the computer,wherein execution of the add-on computer software code by the processor causes the computer to generate a price schedule for a construction plan file created by the software design tool, the construction plan file including one or more construction plan elements, by at least:assigning a code to at least one of the construction plan elements;transmitting the assigned code from the computer to a database storing current pricing data for construction materials;receiving from the database pricing data for the at least one construction plan element, the pricing data being at least partially based on the assigned code; andgenerating a price schedule from the received pricing data. 17. The medium of claim 16 wherein execution of the add-on computer software code further causes the computer to generate a price schedule for the construction project by at least: transmitting geographic information to the database. 18. The medium of claim 17 wherein the pricing data is at least partially based on the geographic information. 19. A system for creating a pricing schedule for a construction project comprising: (a) a computer having a processor coupled to a memory;(b) a software design tool configured to provide on the computer a construction plan file having one or more construction plan elements;(c) a database including pricing data for the one or more construction plan elements; and(d) an add-on computer software code that runs on the computer as an internal component within the software design tool and includes one or more parametric symbols corresponding to the one or more construction plan elements, the one or more parametric symbols being selectable by a user for insertion into the construction plan file,wherein the add-on computer software code when executed by the computer causes the computer to:(i) insert one or more parametric symbols selected by the user into the construction plan file;(ii) transmit data corresponding to the inserted parametric symbols from the computer to the database;(iii) receive from the database pricing data for one or more construction plan elements corresponding to the inserted parametric symbols; and(iv) generate a price schedule from the received pricing data. 20. The system of claim 19 wherein the price schedule includes a total cost for all of the construction plan elements corresponding to the inserted parametric symbols.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (29)
Ladner Francis D. ; Branc Joseph R., 3-D spatial GUI for querying and manipulating an RDMS for order-entry applications.
Wakelam, Robert Bruce; Beck, III, Henry C. (Peter); Phillips, Bradley Paul; Powell, Gregory Wayne; O'Kelly, Niall Brendan, Computer-implemented automated building design and modeling and project cost estimation and scheduling system.
Bains Jeffrey E. (Madison AL) Case Willard W. (Madison AL), Distributed license administration system using a local policy server to communicate with a license server and control e.
Ananian, John A.; Duggan, Daniel J.; Mahovlic, Steven R., Generating cad independent interactive physical description remodeling, building construction plan database profile.
Abraham Loren (St. Paul MN) Pilla Michael F. (St. Paul MN) Bright Jason (St. Paul MN), Integrated method and apparatus for selecting, ordering and manufacturing art glass panels.
Bigbee Bryant E. ; Hacking Lance E. ; Shahidzadeh Shahrokh ; Thakkar Shreekant S., Method and apparatus for accessing more than 4 Gigabytes of physical memory with 4-byte table entries.
Maki Reino A. (Marietta GA) Mitchell Herman (Lithonia GA) Mukherjee Sujan K. (Roswell GA) Panuganti Badari N. (Mableton GA) Stiles April D. E. (Atlanta GA), Method and system for product configuration management in a computer based manufacturing system.
Heil, Edwin D., System for calculating floor plan information and automatically notching, cutting and transferring information onto framing components.
Domenikos Steven D. ; Domenikos George C., Systems and methods for executing application programs from a memory device linked to a server at an internet site.
Burns Thomas J. (Callaway FL) Page Edward C. (Lynn Haven FL) Gregory Rita A. (Panama City FL) Pryor George M. (Panama City FL), Totally integrated construction cost estimating, analysis, and reporting system.
Ginter, Karl L.; Shear, Victor H.; Spahn, Francis J.; Van Wie, David M.; Weber, Robert P., Trusted infrastructure support system, methods and techniques for secure electronic commerce transaction and rights management.
Jacobs, II, James L.; Cronin, John E.; Huffines, Christopher M.; Lynch, Steven M., Product variable optimization for manufacture or supply of designed products.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.