System for the placement of modular fill material forming co-joined assemblies
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
E04B-002/26
E04B-002/84
출원번호
US-0473402
(2012-05-16)
등록번호
US-8522506
(2013-09-03)
발명자
/ 주소
Barnet, Robert T.
Barnet, Bradley J.
Dworkes, Donald H.
출원인 / 주소
ThermoFormed Block Corp.
대리인 / 주소
Santangelo Law Offices, P.C.
인용정보
피인용 횟수 :
0인용 특허 :
117
초록▼
A system for the placement of modular fill material forming co-joined assemblies that promotes increased efficiency in fill material building methods by utilizing the capabilities of aerial conveyance devices, the pre-assembly of forms, the rapid bracing of forms, and the sequential placement of enc
A system for the placement of modular fill material forming co-joined assemblies that promotes increased efficiency in fill material building methods by utilizing the capabilities of aerial conveyance devices, the pre-assembly of forms, the rapid bracing of forms, and the sequential placement of enclosure forms.
대표청구항▼
1. A method of placing modular fill material forming co-joined assemblies, comprising the steps of: establishing at least two fill material forms, each said fill material form having at least a first forming panel and at least a second forming panel arranged in substantially opposed parallel orienta
1. A method of placing modular fill material forming co-joined assemblies, comprising the steps of: establishing at least two fill material forms, each said fill material form having at least a first forming panel and at least a second forming panel arranged in substantially opposed parallel orientation, a space formed between said at least first forming panel and said at least second forming panel, and at least one connection element joined to said first forming panel and said second forming panel;joining said at least two fill material forms to create a modular fill material forming co-joined assembly;establishing a ground location of said modular fill material forming co-joined assembly;establishing a ground orientation of said modular fill material forming co-joined assembly;estimating a centroid of said modular fill material forming co-joined assembly;establishing at least one lift securement element on said modular fill material forming co-joined assembly;positioning said at least one lift securement element to correlate with an axis of lift for said centroid of said modular fill material forming co-joined assembly;establishing an aerial conveyance device having at least one lift attachment element;connecting said at least one lift attachment element of said aerial conveyance device to said at least one lift securement element of said modular fill material forming co-joined assembly;lifting said modular fill material forming co-joined assembly in an aerial orientation along said axis of lift for said centroid using said aerial conveyance device;transporting said modular fill material forming co-joined assembly in said aerial orientation from said ground location to a placement location using said aerial conveyance device;establishing an aerial orientation of said modular fill material forming co-joined assembly to substantially coincide with said placement orientation of said modular fill material forming co-joined assembly while said at least one lift attachment element of said aerial conveyance device is connected to said at least one lift securement element of said modular fill material forming co-joined assembly;placing said modular fill material forming co-joined assembly oriented in said placement orientation in said placement location while said at least one lift attachment element of said aerial conveyance device is connected to said at least one lift securement element of said modular fill material forming co-joined assembly; anddisconnecting said at least one lift attachment element of said aerial conveyance device from said at least one lift securement element of said modular fill material forming co-joined assembly. 2. A method of placing modular fill material forming co-joined assemblies as described in claim 1, further comprising the step of placing at least one reinforcement member at a remote location. 3. A method of placing modular fill material forming co-joined assemblies as described in claim 2, wherein said step of placing said reinforcement member occurs before said step of lifting said modular fill material forming co-joined assembly. 4. A method of placing modular fill material forming co-joined assemblies as described in claim 1, wherein said step of joining occurs at a remote location. 5. A method of placing modular fill material forming co-joined assemblies as described in claim 4, wherein said remote location comprises a factory site. 6. A method of placing modular fill material forming co-joined assemblies as described in claim 1, wherein said placement location comprises a high-rise fill material pour site. 7. A method of placing modular fill material forming co-joined assemblies as described in claim 1, further comprising the step of establishing a securement integrity system to fortify a structural integrity of said modular fill material forming co-joined assembly during said step of transporting said modular fill material forming co-joined assembly. 8. A method of placing modular fill material forming co-joined assemblies as described in claim 7, wherein said securement integrity system comprises at least one strengthening element established on said modular fill material forming co-joined assembly. 9. A method of placing modular fill material forming co-joined assemblies as described in claim 8, wherein said strengthening element comprises a high-strength fastener joining said lift securement element to said modular fill material forming co-joined assembly. 10. A method of placing modular fill material forming co-joined assemblies as described in claim 1, further comprising the steps of: establishing an enclosure location having an outside enclosure boundary, an enclosure space, and an inside enclosure boundary;transporting an outer enclosure forming panel to said enclosure location;transporting at least one enclosure reinforcement member to said enclosure location;transporting an inner enclosure forming panel to said enclosure location;orienting said outer enclosure forming panel to substantially coincide with said outside enclosure boundary;positioning said outer enclosure forming panel substantially at said outside enclosure boundary;orienting said at least one enclosure reinforcement member to fit within said enclosure space;placing said at least one enclosure reinforcement member within said enclosure space after said step of positioning said outer enclosure forming panel;orienting said inner enclosure forming panel to substantially coincide with said inside enclosure boundary;positioning said inner enclosure forming panel substantially at said inside enclosure boundary after said step of placing said at least one enclosure reinforcement member;joining at least one enclosure connection element to said outer enclosure forming panel and said inner enclosure forming panel. 11. A method of placing modular fill material forming co-joined assemblies as described in claim 10, wherein said steps of establishing an enclosure location, transporting an outer enclosure forming panel, transporting at least one enclosure reinforcement member, transporting an inner enclosure forming panel, orienting said outer enclosure forming panel, positioning said outer enclosure forming panel, orienting said at least one enclosure reinforcement member, placing said at least one enclosure reinforcement member, orienting said inner enclosure forming panel, positioning said inner enclosure forming panel, and joining at least one enclosure connection element to said outer enclosure forming panel occur after said step of placing said modular fill material forming co-joined assembly. 12. A method of placing modular fill material forming co-joined assemblies as described in claim 10, wherein said enclosure location comprises a corner opening. 13. A method of placing modular fill material forming co-joined assemblies as described in claim 12, further comprising placing at least one fill material form adjacent to said corner opening. 14. A method of placing modular fill material forming co-joined assemblies as described in claim 13, further comprising joining said outer enclosure forming panel to an outer forming panel of said fill material form. 15. A method of placing modular fill material forming co-joined assemblies as described in claim 13, further comprising joining said inner enclosure forming panel to an inner forming panel of said fill material form. 16. A method of placing modular fill material forming co-joined assemblies as described in claim 13, further comprising placing at least one reinforcement member within said space of said fill material form. 17. A method of placing modular fill material forming co-joined assemblies as described in claim 16, further comprising joining said enclosure reinforcement member to said reinforcement member placed within said space of said fill material form. 18. A method of placing modular fill material forming co-joined assemblies as described in claim 12, wherein said corner opening comprises a high-rise fill material pour site. 19. A method of placing modular fill material forming co-joined assemblies as described in claim 10, wherein said step of positioning said outer enclosure forming panel comprises the step of positioning said outer enclosure forming panel from an inside direction.
Brisson Dale J. ; Hammond W. Scott, Apparatus and method for installing prefabricated building system for walls roofs and floors using a foam core building pane.
Melnick David W. (3405 Alcott St. Denver CO 80211-3341) Barnet Robert T. (809 E. Ridgecrest Rd. Fort Collins CO 80524), Block forms for receiving concrete.
Krabbe Wilfried (Buchschlag DEX) Simon Walter (Frankfurt am Main DEX), Climbing framework for erecting concrete forms in the manufacture of straight or curved reinforced concrete walls.
Laird Andrew ; Laird Alex, Compactly-shipped site-assembled concrete forms for producing variable-width insulated-sidewall fastener-receiving building walls.
Holzapfel Robert C. (Arlington Heights IL) Mottet Michael P. (Bettendorf IA) Riggle Thomas W. (Phoenix AZ), Masonry wall structure and method of making the same.
Melnick David W. (3405 Alcott St. Denver CO 80211-3341) Barnet Robert T. (809 E. Ridgecrest Rd. Fort Collins CO 80524), Method for making block forms for receiving concrete.
Harkenrider Thomas E. ; Pinkerton Scott D. ; Buck Robert W. ; Hanson Jeffrey L., Modular concrete form system and method for constructing concrete walls.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.