IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
US-0210668
(2011-08-16)
|
등록번호 |
US-8609298
(2013-12-17)
|
발명자
/ 주소 |
- Skala, Glenn W.
- Kumar, Vinod
|
출원인 / 주소 |
- GM Global Technologies Operations LLC
|
대리인 / 주소 |
Fraser Clemens Martin & Miller LLC
|
인용정보 |
피인용 횟수 :
1 인용 특허 :
3 |
초록
▼
A method for manufacturing a subgasket for a fuel cell stack having a pair of plates disposed in a stack includes the step of positioning a membrane between the plates. The membrane includes an inboard portion and a tortuous form portion. The inboard portion abuts a proton exchange membrane of the f
A method for manufacturing a subgasket for a fuel cell stack having a pair of plates disposed in a stack includes the step of positioning a membrane between the plates. The membrane includes an inboard portion and a tortuous form portion. The inboard portion abuts a proton exchange membrane of the fuel cell, and the tortuous form portion abuts each of the plates. The tortuous form portion defines at least one cavity between one of the plates and the membrane. A viscous sealant is injected into the cavity. The sealant is cured to form a compliant bead seal on the membrane.
대표청구항
▼
1. A method for manufacturing a subgasket for a fuel cell having a pair of plates disposed in a stack, the method comprising the steps of: positioning a membrane between the plates, the membrane including an inboard portion and a tortuous form portion defining at least one cavity between one of the
1. A method for manufacturing a subgasket for a fuel cell having a pair of plates disposed in a stack, the method comprising the steps of: positioning a membrane between the plates, the membrane including an inboard portion and a tortuous form portion defining at least one cavity between one of the plates and the membrane, the inboard portion abutting a proton exchange membrane of the fuel cell, and the tortuous form portion abutting each of the plates adjacent the at least one cavity; andinjecting a sealant into the cavity; andcuring the sealant to form a compliant bead seal on the membrane. 2. The method of claim 1, further comprising a step of partially compressing the stack prior to the step of injecting the sealant into the cavity. 3. The method of claim 2, wherein the partial compression is relieved following the step of injecting the sealant into the cavity to permit an expansion of the sealant within the cavity. 4. The method of claim 1, wherein the cavity is substantially filled with the sealant prior to the step of curing the sealant. 5. The method of claim 1, further comprising a step of fully compressing the stack following the step of curing the sealant to form the bead seal. 6. The method of claim 1, wherein the injection of the sealant into the cavity is performed through a sprue defined by the plates, the sprue in fluid communication with a port formed in each of the plates. 7. The method of claim 6, wherein the ports through which the sealant is injected into the sprue are datum holes for aligning the plates in the stack. 8. The method of claim 1, wherein the step of curing the sealant is performed at one of room temperature and an elevated temperature. 9. The method of claim 8, wherein the step of curing the sealant is performed at the elevated temperature, and the plates are heated prior to the injection of the sealant to cause the elevated temperature. 10. The method of claim 1, wherein a vacuum is drawn on the cavity to facilitate the injection of the sealant into the cavity. 11. The method of claim 1, wherein the tortuous form portion includes a pair of major troughs with a peak disposed therebetween, at least one of the major troughs abutting one of the plates and the peak abutting an other of the plates. 12. The method of claim 11, wherein the peak includes a minor trough defining another cavity. 13. The method of claim 12, wherein an aperture is formed in the minor trough of the tortuous form portion and the sealant when injected flows through the aperture and fills both cavities. 14. The method of claim 11, wherein the peak is affixed to the other of the plates with an adhesive. 15. The method of claim 1, wherein the membrane is formed from one of polypropylene, PEN, and PET. 16. The method of claim 1, wherein the membrane is formed from a polymeric foam. 17. The method of claim 1, wherein the sealant is one of a two-part curable elastomer and a thermally curable elastomer. 18. The method of claim 1, wherein the sealant is a foaming elastomeric fluid. 19. A subgasket for a fuel cell stack having a pair of plates, comprising: a membrane positioned between the plates, the membrane including an inboard portion and a tortuous form portion, the inboard portion abutting a proton exchange membrane of the fuel cell, and the tortuous form portion including a pair of major troughs with a peak disposed therebetween defining at least one cavity between one of the plates and the membrane, at least one of the major troughs abutting one of the plates and the peak abutting an other of the plates, anda compliant bead seal formed on the membrane by injecting a viscous sealant into the at least one cavity and curing the sealant. 20. A fuel cell stack, comprising: a pair of plates disposed in a stack;a pair of diffusion medium layers disposed between the plates;a membrane electrode assembly sandwiched between the diffusion medium layers; anda subgasket including a membrane positioned between the plates, the membrane including an inboard portion and a tortuous form portion, the inboard portion abutting a membrane electrode assembly of the fuel cell, and the tortuous form portion defining at least one cavity between one of the plates and the membrane and abutting each of the plates adjacent the at least one cavity, a compliant bead seal formed on the membrane by injecting a viscous sealant into the cavity and curing the sealant.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.