A method for regulating the temperature of a datacenter within an optimum temperature range includes predicting, using a computing device, a thermal load from a workload scheduler containing information on machines assembled in the datacenter to be turned on and/or off during a particular time perio
A method for regulating the temperature of a datacenter within an optimum temperature range includes predicting, using a computing device, a thermal load from a workload scheduler containing information on machines assembled in the datacenter to be turned on and/or off during a particular time period, and the thermal load of the datacenter associated with the work of the machines within the particular time period; and controlling at least one cooling system of the datacenter based upon the predicted thermal load within the particular time period under consideration of the thermal inertia of the datacenter by at least one of activating, controlling, and deactivating cooling resources of the cooling system in advance to maintain the temperature of the datacenter within the optimum temperature range.
대표청구항▼
1. A method for regulating the temperature of a datacenter within an optimum temperature range, the method comprising: predicting, using a computing device, a thermal load from a workload scheduler containing information on machines assembled in the datacenter to be turned on and/or off during a par
1. A method for regulating the temperature of a datacenter within an optimum temperature range, the method comprising: predicting, using a computing device, a thermal load from a workload scheduler containing information on machines assembled in the datacenter to be turned on and/or off during a particular time period, and the thermal load of the datacenter associated with the work of the machines within the particular time period; andcontrolling at least one cooling system of the datacenter based upon the predicted thermal load within the particular time period under consideration of a thermal inertia of the datacenter by at least one of activating, controlling, and deactivating cooling resources of the cooling system in advance to maintain the temperature of the datacenter within the optimum temperature range. 2. The method according to claim 1, wherein the workload scheduler works by using plan records, each representing a job to be performed by the datacenter, each plan record comprising at least information on the day, hour, and minute the job represented by the data is scheduled to start, the machines within datacenter needed to perform the job, and the duration of the job. 3. The method according to claim 2, wherein the prediction of the thermal load is performed by calculating the thermal load at a particular time period from the information comprised in the plurality of workload scheduler plan records. 4. The method according to claim 1, wherein for predicting a thermal workload, actual environmental information on the datacenter are taken into consideration. 5. The method according to claim 4, wherein at least information about the actual humidity and/or the actual temperature of the datacenter are taken into consideration. 6. A system for regulating the temperature of a datacenter within an optimum temperature range by at least one cooling device, the system comprising: a main controller;a control interface that receives data entered by a user;a scheduler application;a workload schedule database; andworkload based logic;wherein the control interface is adapted to receive input, from the user, including a thermal threshold value for a datacenter temperature into a main controller, and wherein the main controller is adapted to control at least one cooling device of the datacenter based upon the inputted threshold value and a predicted thermal load calculated by the workload based logic, the workload based logic adapted to predict a thermal load of the datacenter based upon information in a schedule plan database, the schedule plan database logically connected to a scheduler application interface that delivers information to the schedule plan database about scheduled jobs to be performed by machines assembled in the datacenter. 7. The system according to claim 6, further comprising at least one environmental sensor delivering data about environmental conditions within the datacenter to the workload based logic. 8. The system according to claim 6, further comprising a room properties database logically connected to the workload logic, the room properties database adapted to deliver at least information about the room properties of the datacenter relevant for the prediction of the thermal load to the workload logic. 9. The system according to claim 6, further comprising an environmental interface logically connected to the room properties database, the environmental interface configured to receive data input by a user about the room properties of the datacenter into the room properties database. 10. A non-transitory, computer readable medium having computer readable instructions stored thereon that, when executed by a computer, implemented a method for regulating the temperature of a datacenter within an optimum temperature range, the method comprising: predicting a thermal load from a workload scheduler containing information on machines assembled in the datacenter to be turned on and/or off during a particular time period, and the thermal load of the datacenter associated with the work of the machines within the particular time period; and controlling at least one cooling system of the datacenter based upon the predicted thermal load within the particular time period under consideration of the thermal inertia of the datacenter by at least one of activating, controlling, and deactivating cooling resources of the cooling system in advance to maintain the temperature of the datacenter within the optimum temperature range. 11. The computer readable medium according to claim 10, wherein the workload scheduler works by using plan records, each representing a job to be performed by the datacenter, each plan record comprising at least information on the day, hour, and minute the job represented by the data is scheduled to start, the machines within datacenter needed to perform the job, and the duration of the job. 12. The computer readable medium according to claim 11, wherein the prediction of the thermal load is performed by calculating the thermal load at a particular time period from the information comprised in the plurality of workload scheduler plan records. 13. The computer readable medium according to claim 10, wherein for predicting a thermal workload, actual environmental information on the datacenter are taken into consideration. 14. The computer readable medium according to claim 13, wherein at least information about the actual humidity and/or the actual temperature of the datacenter are taken into consideration.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (13)
Sharma, Ratnesh, Atmospheric control within a building.
Matsubayashi,Shigeaki; Nagamitsu,Sachio, Energy management system, energy management method, and unit for providing information on energy-saving recommended equipment.
Hyland,Robert Francis; Misgen,Marvin Miles; Prisco,Joseph Frank, Monitoring and real-time heat load control based upon server and environmental parameters.
Nakajima, Tadakatsu; Kato, Takeshi; Shiga, Yoko; Matsushima, Hitoshi, System and method for controlling air conditioning facilities, and system and method for power management of computer room.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.