IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
US-0140211
(2009-12-18)
|
등록번호 |
US-8695308
(2014-04-15)
|
국제출원번호 |
PCT/EP2009/067481
(2009-12-18)
|
§371/§102 date |
20110616
(20110616)
|
국제공개번호 |
WO2010/070082
(2010-06-24)
|
발명자
/ 주소 |
- Falk, Jon Henrik
- Augustinson, David Fredrik
|
출원인 / 주소 |
|
대리인 / 주소 |
|
인용정보 |
피인용 횟수 :
2 인용 특허 :
10 |
초록
▼
The present invention relates to a method for mounting facade elements (12, 12b-c) on a multi-story building by means of a profile system comprising a first type of vertical profile (1a-d) having a slot extending along the longitudinal axis of the profile, and an inner part of the slot being designe
The present invention relates to a method for mounting facade elements (12, 12b-c) on a multi-story building by means of a profile system comprising a first type of vertical profile (1a-d) having a slot extending along the longitudinal axis of the profile, and an inner part of the slot being designed to receive an edge of a first facade element and an outer part of the slot being designed to receive and support a second type of vertical profile, provided with a groove extending along the longitudinal axis of the profile and designed to receive and support an edge of a second facade element. The method comprises: a) mounting two vertical profiles (1a-b) of the first type at a second floor of the building so that the slots are facing each other, and above profiles (1c-d) of the first and second type previously mounted on a first floor, b) transporting a facade element (12), guided by the grooves of the profiles mounted on the first floor until it reaches the vertical profiles mounted on the second floor, c) entering the facade element into the outer part of the slots of the vertical profiles mounted on the second floor, d) continuing transporting the facade element, guided by the outer part of the slots to a mounting position, e) pushing the facade element from the outer part of the slots to the inner part of the slots, f) attaching the facade element to the building, and g) inserting vertical profiles of the second type into the outer part of the slots.
대표청구항
▼
1. A method for mounting facade elements (12,12b-c) on a multi-storey building by a profile system comprising providing first (1) and second (14) types of vertical profiles,the first type of vertical profile (1) having a slot extending along a longitudinal axis of the profile, and an inner part (5)
1. A method for mounting facade elements (12,12b-c) on a multi-storey building by a profile system comprising providing first (1) and second (14) types of vertical profiles,the first type of vertical profile (1) having a slot extending along a longitudinal axis of the profile, and an inner part (5) of the slot being designed to receive an edge (13c) of a first facade element (12) and an outer part (6) of the slot being designed to receive and support the second type of vertical profile (14) arranged to support the first facade element, andthe second type of profile is provided with a groove (15) extending along a longitudinal axis of the profile and designed to receive and support an edge (13) of a second facade element (12c), wherein the method further comprises:a) mounting two vertical profiles (1a-b) of the first type at a second floor of the building so that the slots are facing each other, and above profiles (1c-d) of the first and second type previously mounted on a first floor, and so that the longitudinal axes of the profiles are aligned,b) transporting the first facade element (12) in a vertical direction guided by the grooves of the second type of profiles mounted on the first floor until it reaches the vertical profiles mounted on the second floor,c) entering the first facade element into the outer part of the slots of the vertical profiles mounted on the second floor,d) continuing transporting the first facade element in a vertical direction guided by the outer part of the slots of the vertical profiles mounted on the second floor until it reaches a mounting position,e) pushing the first facade element from the outer part of the slots to the inner part of the slots,f) attaching the first facade element to the building, andg) inserting vertical profiles of the second type into the outer part of the slots so that the grooves are facing each other. 2. The method according to claim 1, wherein the method further comprises: h) mounting two vertical profiles (1) of the first type at a third floor of the building, so that the slots are facing each other, and above the profiles of the first and second type previously mounted on the second floor so that the longitudinal axes of the profiles are aligned, andi) transporting the second facade element (12c) guided by the grooves of the second type of vertical profiles, in a vertical direction until it reaches the vertical profiles mounted on the third floor, and repeating the steps c-g for the second facade element. 3. The method according to claim 2, wherein the first facade element (12) is pushed from the outer part (6) of the slots to the inner part (5) of the slots by a tool (20). 4. The method according to claim 3, wherein step (a) further comprises attaching a tool (20) to at least one of said two vertical profiles (1a-b) on the second floor, and steps (d) and (e) further comprise:moving the first facade element (12) upward until it comes into contact with the tool,moving the first facade element upward to a position above the final mounting position, while the upward movement of the first facade element affects the tool so that the tool is turned into a working position, andlowering the first facade element towards the final mounting position thereby causing the tool to push the first facade element towards the inner part (5) of the slots. 5. The method according to claim 2, wherein step (a) further comprises attaching a tool (20) to at least one of said two vertical profiles (1a-b) on the second floor, and steps (d) and (e) further comprise:moving the first facade element (12) upward until it comes into contact with the tool,moving the first facade element upward to a position above the final mounting position, while the upward movement of the facade element affects the tool so that the tool is turned into a working position, andlowering the first facade element towards the final mounting position thereby causing the tool to push the first facade element towards the inner part (5) of the slots. 6. The method according to claim 1, wherein the first facade element (12) is pushed from the outer part (6) of the slots to the inner part (5) of the slots by a tool (20). 7. The method according to claim 6, wherein the tool (20) is driven by a vertical down movement of the first facade element. 8. The method according to claim 6, wherein step (a) further comprises attaching a tool (20) to at least one of said two vertical profiles (1a-b) on the second floor, and steps (d) and (e) further comprises:moving the first facade element (12) upward until it comes into contact with the tool,moving the first facade element upward to a position above the final mounting position, while the upward movement of the first facade element affects the tool so that the tool is turned into a working position, andlowering the first facade element towards the final mounting position thereby causing the tool to push the first facade element towards the inner part (5) of the slots. 9. The method according to claim 1, wherein step (a) further comprises attaching a tool (20) to at least one of said two vertical profiles (1a-b) on the second floor, and steps (d) and (e) further comprise: moving the first facade element (12) upward until it comes into contact with the tool,moving the first facade element upward to a position above the final mounting position, while the upward movement of the first facade element affects the tool so that the tool is turned into a working position, andlowering the first facade element towards the final mounting position thereby causing the tool to push the first facade element towards the inner part (5) of the slots. 10. The method according to claim 1, wherein the vertical profiles of the first type (1) are provided with a first fastening element (25) designed to be engaged to a corresponding fastening member (30) on the building, and a second fastening element (26) designed to be engaged to a corresponding fastening unit (35) provided on the first facade element, and step (a) further comprises: providing the second floor with at least two fastening members arranged at a distance from each other, andattaching the vertical profiles of the first type to the second floor by engaging the first fastening elements to the fastening member on the second floor, andstep (f) further comprises attaching the first facade element (12) to the building by engaging the fastening units of the first facade element to the second fastening elements. 11. The method according to claim 10, wherein the first and second fastening elements (25,26) are integrated in a single unit (24) and comprise a common load bearing body (34). 12. The method according to claim 1, wherein the facade elements (12) are delivered to the building by a truck trailer, and the method comprises automatically moving the respective facade elements from the truck trailer to a storage position (74) located at a base of the building. 13. The method according to claim 1, wherein the method comprises transporting the respective facade elements (12) from a storage position (74) to a desired horizontal position by a conveyer system including a track (72) arranged around at least a part of the building. 14. The method according to claim 13, wherein the respective facade elements (12) are moved by an elevator unit (80) provided with a gripping device for gripping the respective facade elements, the gripping device being arranged to move the respective facade element in a direction towards to the building and thereby facilitating the insertion of the respective facade elements into the grooves (15) of the second type of vertical profiles (14), and the method comprises gripping the respective, facade elements by the elevator unit, and inserting the second facade element into the grooves of the second type of vertical profiles by the elevator unit, andthe method comprises transporting the respective facade elements (12) from the storage position (74) to the elevator unit (80) by the conveyer system (72). 15. The method according to claim 1, wherein the first facade element is vertically moved by a lifting device (22) positioned on the floor at which the first facade element (12) is to be mounted or on a floor above the floor at which the first facade element (12) is to be mounted. 16. The method according to claim 15, wherein the respective facade elements (12) are moved by an elevator unit (80) provided with a gripping device for gripping the respective facade elements, the gripping device being arranged to move the respective facade element in a direction towards to the building and thereby facilitating the insertion of the respective facade elements into the grooves (15) of the second type of vertical profiles (14), and the method comprises gripping the respective facade elements by the elevator unit, and inserting the second facade element into the grooves of the second type of vertical profiles by the elevator unit, andthe elevator unit (80) is guided by the grooves (15) of the second type of vertical profiles, and the elevator is vertically moved by the lifting device (22). 17. The method according to claim 1, wherein the respective facade elements (12) are moved by an elevator unit (80) provided with a gripping device for gripping the respective facade elements, the gripping device being arranged to move the respective facade element in a direction towards to the building and thereby facilitating the insertion of the respective facade elements into the grooves (15) of the second type of vertical profiles (14), and the method comprises gripping the respective facade elements by the elevator unit, and inserting the second facade element into the grooves of the second type of vertical profiles by the elevator unit. 18. The method according to claim 1, wherein a correct distance between the two vertical profiles of the first type during mounting of the profiles is ensured by a jig (23) having a length that corresponds to the length of a respective facade element. 19. The method according to claim 1, wherein said first type of vertical profile (1) has a second slot (4b) extending along the longitudinal axis of the profile on an opposite side of the profile with respect to the first mentioned slot (4a), and the second slot has an inner part designed to receive an edge of a respective facade element and an outer part designed to receive the second type of vertical profile, and the method comprises mounting one vertical profile (1e) of the first type at a horizontal distance from one of the profiles (1a) of the second floor so that the slots are facing each other, and above one profile previously mounted on the first floor so that the longitudinal axes of the profiles are aligned, and repeating the steps (b-g). 20. The method according to claim 1, wherein the method further comprises: mounting an adaptor block (65) on top of the vertical profiles (1;1a,1e) of the first and second type and between two horizontally aligned respective facade elements, andmounting a continuous sealing strip (70) on top of the two horizontally aligned facade elements (12b-c) and on top of the adaptor block to seal between the facade elements and vertical profiles of different floors.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.