Method for operating a combined cycle power plant
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
F02C-001/00
F02C-006/00
F02C-007/18
F01K-023/10
F02C-009/18
F01K-023/02
F01D-019/00
F02C-006/18
F02C-007/141
출원번호
US-0714568
(2012-12-14)
등록번호
US-9046037
(2015-06-02)
우선권정보
CH-2024/11 (2011-12-22)
발명자
/ 주소
Broesamle, Stefan Eduard
Ruchti, Christoph
출원인 / 주소
ALSTOM TECHNOLOGY LTD.
대리인 / 주소
Buchanan Ingersoll & Rooney PC
인용정보
피인용 횟수 :
1인용 특허 :
4
초록▼
A method for operating a combined cycle power plant is disclosed, which has a gas turbine installation and a water-steam cycle connected to the gas turbine installation by a waste heat steam generator and has at least one steam turbine, the gas turbine installation includes a compressor, a combustio
A method for operating a combined cycle power plant is disclosed, which has a gas turbine installation and a water-steam cycle connected to the gas turbine installation by a waste heat steam generator and has at least one steam turbine, the gas turbine installation includes a compressor, a combustion chamber, and a turbine. To cool the turbine, air compressed at the compressor is removed, cooled in at least one cooler flowed through by water, thus generating steam, and introduced into the turbine. At least with the gas turbine installation running, prior to or during the start-up of the water-steam cycle, waste heat, which is contained in the steam generated in the at least one cooler, is used to good effect for pre-heating the installation inside the combined cycle power plant.
대표청구항▼
1. A method for operating a combined cycle power plant, which plant has a gas turbine installation and a water-steam cycle, wherein the water-steam cycle is connected to the gas turbine installation by a waste heat steam generator and wherein the water-steam cycle includes at least one steam turbine
1. A method for operating a combined cycle power plant, which plant has a gas turbine installation and a water-steam cycle, wherein the water-steam cycle is connected to the gas turbine installation by a waste heat steam generator and wherein the water-steam cycle includes at least one steam turbine and a condenser configured to condense the steam emerging from the at least one steam turbine, and wherein the condenser operates under vacuum, and wherein the gas turbine installation includes a compressor, a combustion chamber, and a turbine, and wherein, to cool the turbine of the gas turbine installation, air compressed at the compressor is removed, cooled in at least one cooler flowed through by water thus generating steam, and introduced into the turbine of the gas turbine installation, the method comprising: at least with the gas turbine installation running, and prior to or during the start-up of the water-steam cycle, pre-heating at least a portion of the gas turbine installation at a position inside the combined cycle power plant with waste heat contained in the steam generated in the at least one cooler; andwherein the pre-heating at least a portion of the gas turbine installation includes evacuating the condenser with steam generated in the at least one cooler. 2. A method according to claim 1, wherein the combined cycle power plant includes means for blowing-off steam generated in the at least one cooler. 3. A method according to claim 2, further comprising: blowing-off steam generated in the at least one cooler via a secondary stack. 4. A method according to claim 3, wherein blowing-off steam comprises blowing-off steam at the secondary stack between the gas turbine installation and the waste heat steam generator. 5. A method according to claim 1, further comprising: condensing steam generated in the at least one cooler in a condenser. 6. A method according to claim 1, wherein preheating at least a portion of the gas turbine installation comprises: preheating feedwater used in the at least one cooler with waste heat from the compressor of the gas turbine installation. 7. A method according to claim 6, wherein preheating at least a portion of the gas turbine installation comprises: preheating fuel used in the gas turbine installation with preheated feedwater from said preheating feedwater step. 8. A method according to claim 1, wherein preheating at least a portion of the gas turbine installation comprises: preheating the waste heat steam generator with waste heat from the compressor of the gas turbine installation. 9. A method according to claim 8, in which the waste heat steam generator includes a super heater and an evaporator, each including live-steam lines, and wherein said preheating the waste heat steam generator comprises preheating said live-steam lines with waste heat from the compressor of the gas turbine installation. 10. A method according to claim 8, further comprising: discharging, from the waste heat steam generator, condensation occurring during said preheating of the waste heat steam generator. 11. A method according to claim 1, wherein preheating at least a portion of the gas turbine installation comprises: preheating the steam turbine with waste heat from the compressor of the gas turbine installation. 12. A method according to claim 11, wherein preheating the steam turbine comprises preheating a housing and/or a rotor of the steam turbine. 13. A method according to claim 1, wherein preheating at least a portion of the gas turbine installation comprises at least one of preheating the steam turbine, keeping the steam turbine warm, sealing and evacuating the steam turbine, or combinations thereof. 14. A method according to claim 1, wherein, with the steam turbine sealed, pre-heating at least a portion of the gas turbine installation comprises exposing shaft glands with sealing steam.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (4)
Gabriel Christian (Moehrendorf DEX), Apparatus for cooling a gas turbine in a gas and steam turbine plant.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.