Arrangement for generating a control signal for controlling a power output of a power generation system
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
H02J-003/00
F03D-007/02
H02J-003/38
출원번호
US-0489578
(2012-06-06)
등록번호
US-9261079
(2016-02-16)
우선권정보
EP-11169135 (2011-06-08)
발명자
/ 주소
Knüppel, Thyge
Kumar, Sathees
Thuring, Patrik
출원인 / 주소
SIEMENS AKTIENGESELLSCHAFT
인용정보
피인용 횟수 :
0인용 특허 :
3
초록▼
An arrangement for generating a control signal for controlling a power output of a power generation system, such as a wind turbine, is provided. The power output is supplied to a utility grid. The arrangement includes a first input terminal for receiving a first input signal indicative of an actual
An arrangement for generating a control signal for controlling a power output of a power generation system, such as a wind turbine, is provided. The power output is supplied to a utility grid. The arrangement includes a first input terminal for receiving a first input signal indicative of an actual grid frequency of the utility grid, a control circuit for generating the control signal, and an output terminal to which the control signal is supplied. The control circuit includes a bang-bang controller for generating a first power signal being indicative of a predefined amount of power to be added to the power output of the power generation system. The bang-bang controller is adapted to be activated when the first input signal falls below a first predefined threshold. The control signal depends on the first power signal.
대표청구항▼
1. An arrangement for generating a control signal for controlling a power output of a power generation system, wherein the power output is supplied to a utility grid, the arrangement comprising: a first input terminal for receiving a first input signal indicative of an actual grid frequency of the u
1. An arrangement for generating a control signal for controlling a power output of a power generation system, wherein the power output is supplied to a utility grid, the arrangement comprising: a first input terminal for receiving a first input signal indicative of an actual grid frequency of the utility grid;a control circuit for generating the control signal; andan output terminal to which the control signal is supplied;wherein the control circuit comprises a bang-bang controller for generating a first power signal being indicative of a predefined amount of power to be added to the power output of the power generation system,wherein the bang-bang controller is adapted to be activated, when the first input signal falls below a first predefined threshold, andwherein the control signal depends on the first power signal;further comprising a load determination unit for determining a load of the power generation system, based on the control signal and/or based on both a power output and a nominal power output of the power generation system;wherein the load determination unit comprises a counter for counting a number of times the control signal caused an increase of the power output of the power generation system. 2. The arrangement according to claim 1, wherein the bang-bang controller is further adapted to be deactivated, when the first input signal exceeds a second predefined threshold. 3. The arrangement according to claim 1, wherein the control circuit is connected in parallel with a power control system of the power generation system being used during normal operation of the power generation system. 4. The arrangement according to claim 1, wherein the first input signal is indicative of a deviation of the actual grid frequency from a fixed nominal grid frequency, wherein the arrangement in particular comprises a comparator for determining the frequency deviation of the actual grid frequency from the fixed nominal grid frequency. 5. The arrangement according to claim 1, further comprising: a second input terminal for receiving a second input signal being indicative of an average acceleration of a generator of the power generation system,wherein the control circuit comprises a recovery unit for generating a second power signal,wherein the second power signal is based on the first and the second input signal, andwherein the control signal depends on the second power signal. 6. The arrangement according to claim 5, wherein the recovery unit is adapted to be activated, when the bang-bang controller is deactivated. 7. The arrangement according to claim 5, wherein the recovery unit is adapted to be deactivated, when the second input signal reaches a predetermined threshold. 8. The arrangement according to claim 5, wherein the recovery unit comprises a PI controller for generating the second power signal. 9. The arrangement according to claim 8, wherein the recovery unit comprises a limiting circuit connected between the PI controller and an output terminal of the recovery unit for limiting the second power signal to be below a predetermined change per time and/or to be in a predetermined range, wherein the predetermined range is 0.0 to 0.2, in particular 0.0 to 0.1, times a nominal power output of the power generation system. 10. The arrangement according to claim 9, wherein the predetermined range depends on an actual power supplied by the power generation system to the utility grid and/or on a kinetic energy of a mechanical portion of the power generation system. 11. The arrangement according to claim 1, wherein the arrangement is adapted to communicate with a power generation plant controller controlling a plurality of power generation systems, including the power generation system, regarding their power outputs. 12. The arrangement according to claim 11, wherein the control signal is communicated to the power generation plant controller. 13. The arrangement according to claim 1, wherein the counter is configured to count a number of times the control signal caused an increase of the power output of the power generation system above the nominal power output. 14. A power generation system for supplying electrical power to a utility grid, the power generation system comprising: an arrangement for generating a control signal for controlling a power output of the power generation system according to claim 1; anda generator and/or converter arranged to receive the control signal and to adapt the power output in dependence of the control signal. 15. The power generation system according to claim 13, where the power generation system is a wind turbine system.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (3)
Nelson, Robert J.; Amos, John D.; Ma, Hongtao, Bang-bang controller and control method for variable speed wind turbines during abnormal frequency conditions.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.