Method of calculating an electrical output of a wind power plant
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
G06F-017/18
F03D-007/04
출원번호
US-0379473
(2010-06-29)
등록번호
US-9328718
(2016-05-03)
우선권정보
DK-2009 00810 (2009-06-30)
국제출원번호
PCT/EP2010/059199
(2010-06-29)
§371/§102 date
20120213
(20120213)
국제공개번호
WO2011/000825
(2011-01-06)
발명자
/ 주소
Nielsen, Peter
출원인 / 주소
Vestas Wind Systems A/S
대리인 / 주소
Patterson & Sheridan, LLP
인용정보
피인용 횟수 :
2인용 특허 :
2
초록▼
The invention relates to a method of calculating an electrical output of a wind power plant comprising a plurality of wind turbines. Instead of calculating the electrical output of the wind power plant as a simple aggregation of the outputs of each wind turbine, the method takes into account paramet
The invention relates to a method of calculating an electrical output of a wind power plant comprising a plurality of wind turbines. Instead of calculating the electrical output of the wind power plant as a simple aggregation of the outputs of each wind turbine, the method takes into account parameters which may vary stochastically throughout the wind power plant, e.g. pitch angle, stiffness in drive train, different possible production with regard to reactive and active effect, mechanical component properties as well as variability in relation to communication times between a power plant controller and the individual wind turbines. The method proposes to make adjustment to a simple aggregation calculation method based on analysis of such stochastic varying parameters.
대표청구항▼
1. A method of controlling operation of a wind power plant comprising a first number (N) of wind turbines coupled with a power plant controller and producing an electrical output, the method comprising: determining an aggregated electrical output of the wind power plant based on a determined electri
1. A method of controlling operation of a wind power plant comprising a first number (N) of wind turbines coupled with a power plant controller and producing an electrical output, the method comprising: determining an aggregated electrical output of the wind power plant based on a determined electrical output of at least one, and less than N, of the N wind turbines;determining a stochastic variability between the individual wind turbines of the N wind turbines by performing a statistical assessment of one or more input parameters selected from the group consisting of electrical parameters, mechanical parameters, operating conditions, and communication times with the power plant controller;adjusting, based on the determined stochastic variability, the aggregated electrical output to determine the electrical output of the wind power plant; andcommunicating, with the power plant controller, control signals to the N wind turbines based on the determined electrical output of the wind power plant. 2. The method of claim 1, wherein the determined electrical output is provided as one or more of a power curve of the wind power plant, an active capability of the wind power plant, and a reactive capability of the wind power plant. 3. The method of claim 2, wherein the determined electrical output comprises the active and reactive production capabilities of the wind power plant. 4. The method of claim 1, wherein the electrical parameters comprise torsion damping controller parameters relating to generator components of the individual wind turbines. 5. The method of claim 4, wherein adjusting the aggregated electrical output based on the assessed stochastic variability allows increased current limits for torsion damping controllers of the individual wind turbines, relative to current limits corresponding to the aggregated electrical output. 6. The method of claim 5, wherein the increased current limits allow the torsion damping controllers to operate with increased gain values. 7. The method of claim 6, wherein operating the torsion damping controllers with increased gain values corresponds to a relatively faster damping of mechanical oscillations of drive trains of the individual wind turbines. 8. The method of claim 1, wherein the communication times comprise time delays for communication between the wind power plant controller and the individual wind turbines. 9. The method of claim 8, wherein the time delays for communication represent amounts of time between the power plant controller issuing a control command, and receipt of the control command at the individual wind turbines. 10. The method of claim 1, wherein the determined electrical output is represented as an equivalent of a second number (M) of wind turbines, where M is substantially smaller than N. 11. The method of claim 1, wherein the mechanical parameters comprise eigenfrequencies of drive trains of the individual wind turbines. 12. The method of claim 1, wherein determining the aggregated electrical output of the wind power plant includes multiplying the determined electrical output by N. 13. A computer program product, comprising: a non-transitory computer readable medium including program instructions for controlling operation of a wind power plant comprising a first number (N) of wind turbines coupled with a power plant controller and producing an electrical output, the operation comprising: determining an aggregated electrical output of the wind power plant based on a determined electrical output of at least one, and less than N, of the N wind turbines;determining a stochastic variability between the individual wind turbines of the N wind turbines by performing a statistical assessment of one or more input parameters selected from the group consisting of electrical parameters, mechanical parameters, operating conditions, and communication times with the power plant controller;adjusting, based on the determined stochastic variability, the aggregated electrical output to determine the electrical output of the wind power plant; andcommunicating, with the power plant controller, control signals to the N wind turbines based on the determined electrical output of the wind power plant. 14. The computer program product of claim 13, wherein the determined electrical output is provided as one or more of a power curve of the wind power plant, an active capability of the wind power plant, and a reactive capability of the wind power plant. 15. The computer program product of claim 14, wherein the determined electrical output comprises the active and reactive production capabilities of the wind power plant. 16. The computer program product of claim 13, wherein the determined electrical output is represented as an equivalent of a second number (M) of wind turbines, where M is substantially smaller than N. 17. The computer program product of claim 13, wherein the mechanical parameters comprise eigenfrequencies of drive trains of the individual wind turbines. 18. The computer program product of claim 13, wherein the electrical parameters comprise torsion damping controller parameters relating to generator components of the individual wind turbines. 19. The computer program product of claim 13, wherein the communication times comprise time delays for communication between the wind power plant controller and the individual wind turbines. 20. A wind power plant, comprising: a first number (N) of wind turbines; anda control arrangement including a power plant controller coupled with the N wind turbines, wherein the control arrangement is configured to: determine an aggregated electrical output of the wind power plant based on a determined electrical output produced by at least one, and less than N, of the N wind turbines;determine a stochastic variability between the individual wind turbines of the N wind turbines by performing a statistical assessment of one or more input parameters selected from the group consisting of electrical parameters, mechanical parameters, operating conditions, and communication times with the power plant controller;adjust, based on the determined stochastic variability, the aggregated electrical output to determine the electrical output of the wind power plant; andcommunicating, with the power plant controller, control signals to the N wind turbines based on the determined electrical output of the wind power plant.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (2)
Barnes, David L.; Juarez, Ruben; Wade, John, Forecasting an energy output of a wind farm.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.