A prefabricated modular reinforced concrete building system includes panel assemblies for foundations, walls, decks, and roofs designed to be built out in a manufacturing facility, shipped to a job site, and filled with concrete. Panel assemblies incorporate a space frame to ensure structural integr
A prefabricated modular reinforced concrete building system includes panel assemblies for foundations, walls, decks, and roofs designed to be built out in a manufacturing facility, shipped to a job site, and filled with concrete. Panel assemblies incorporate a space frame to ensure structural integrity during shipping and during concrete fill. Space frames can include structural columns, rebar mats, spacers, straps, and skin panels. Panel assemblies may be manufactured to contain architectural interior/external finishes, windows/doors, and pre-installed utility distribution systems.
대표청구항▼
1. A modular panel assembly comprising a first rebar mat having a top edge, a bottom edge, and a pair of side edges;a plurality of structural columns connected at intervals to the first rebar mat, wherein the plurality of structural columns are distinct from the first rebar mat and a second rebar ma
1. A modular panel assembly comprising a first rebar mat having a top edge, a bottom edge, and a pair of side edges;a plurality of structural columns connected at intervals to the first rebar mat, wherein the plurality of structural columns are distinct from the first rebar mat and a second rebar mat, and wherein the plurality of structural columns primarily comprise metal;the second rebar mat having a top edge, a bottom edge, and a pair of side edges, wherein the second rebar mat is connected to the plurality of structural columns on the side opposite of the first rebar mat;a plurality of spacers connected to each of the first and second rebar mats;a first skin panel connected to the first rebar mat and a second skin panel connected to the second rebar mat, wherein the rebar mats and skin panels are configured to define a center region for accepting concrete. 2. The panel assembly of claim 1 further comprising straps disposed between the spacers and the skin panels. 3. The panel assembly of claim 1 wherein the first and second skin panels comprise cement fiber board. 4. The panel assembly of claim 1 further comprising a foldout rebar frame. 5. The panel assembly of claim 4 further comprising a hinge connected to at least one skin panel, wherein a portion of the at least one skin panel protracts to form a shell of a spread footer foundation. 6. The panel assembly of claim 1 further comprising a mount for moving the panel assembly by crane. 7. The panel assembly of claim 1 further comprising a plurality of spacer bolts attached to the spacers and configured to provide resistance against skin panel deformation. 8. The panel assembly of claim 1 further comprising conduit for utilities. 9. The panel assembly of claim 1 further comprising a stabbing splice for connecting two panel assemblies together. 10. A portable panel assembly comprising: a plurality of structural columns spaced apart at intervals, wherein the plurality of structural columns are distinct from a space frame, and wherein the plurality of structural columns primarily comprise metal;the space frame connected to the plurality of structural columns, the space frame comprising:a first rebar mat;a plurality of spacers connected to the first rebar mat; andstraps connected to the plurality of spacers;a first skin panel connected to the external side of the space frame. 11. The portable panel assembly of claim 10, further comprising: a second space frame connected to the plurality of structural columns, the second space frame comprising:a second rebar mat;a second plurality of spacers connected to the second rebar mat; andstraps connected to the second plurality of spacers;a second skin panel connected to the external side of the second space frame; anda center region disposed between the first and second skin panels for accepting concrete therein. 12. A method of preparing a panel assembly comprising: connecting a first rebar mat to one side of a plurality of structural columns;connecting a second rebar mat to the opposite side of the plurality of structural columns, wherein the plurality of structural columns are distinct from the first rebar mat and the second rebar mat, and wherein the plurality of structural columns primarily comprise metal;attaching spacers to the side of the first and second rebar mats distal to the plurality of structural columns;attaching straps to the side of the spacers distal to the plurality of the structural columns;attaching a skin panel to each side of the straps distal to the plurality of the structural columns so as to create a center region between the skin panels for accepting concrete. 13. The method of claim 12, further comprising pouring concrete into the center region. 14. The method of claim 12, further comprising: transporting the panel assembly to a jobsite; andconnecting the panel assembly to another panel assembly to form a structure. 15. The method of claim 14, further comprising: attaching a leveling apparatus; andleveling the panel assembly. 16. The method of claim 1, further comprising a leveling apparatus attached to at least one of a plurality of structural columns.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (18)
Bailey, Jr., Wilson Edward, Anchor and alignment device for carpet tiles.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.