Method of controlling a wind turbine and related system
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
F03D-007/02
F03D-007/04
출원번호
US-0127815
(2012-06-21)
등록번호
US-9617977
(2017-04-11)
우선권정보
EP-11171601 (2011-06-27)
국제출원번호
PCT/EP2012/061953
(2012-06-21)
§371/§102 date
20131219
(20131219)
국제공개번호
WO2013/000810
(2013-01-03)
발명자
/ 주소
Slot, Mark Olaf
출원인 / 주소
LM WIND POWER A/S
대리인 / 주소
Nath, Goldberg & Meyer
인용정보
피인용 횟수 :
0인용 특허 :
5
초록▼
The present invention relates to a method for controlling a wind turbine comprising a pitch of one or more blades and collecting first data indicative of a dynamic condition of the first wind turbine blade and a rotor, the first data comprising rotor data and first deflection data, the rotor data in
The present invention relates to a method for controlling a wind turbine comprising a pitch of one or more blades and collecting first data indicative of a dynamic condition of the first wind turbine blade and a rotor, the first data comprising rotor data and first deflection data, the rotor data indicative of the azimuth position and rotational velocity of the rotor in a rotor plane perpendicular to the rotor axis, and the first deflection data indicative of the position, speed and acceleration of one or more parts of the first wind turbine blade. The method comprises calculating an expected tower clearance distance at a later time of tower passage for the first blade based on the first data including acceleration of one or more parts of the first blade, and performing measures to prevent tower collision, if the expected tower clearance distance fulfills a collision risk criterion.
대표청구항▼
1. A method of controlling a wind turbine comprising a tower and a rotor provided on top of the tower, the rotor comprising one or more wind turbine blades including at least a first wind turbine blade that rotates about a rotor axis, the method comprising the steps of: collecting first data indicat
1. A method of controlling a wind turbine comprising a tower and a rotor provided on top of the tower, the rotor comprising one or more wind turbine blades including at least a first wind turbine blade that rotates about a rotor axis, the method comprising the steps of: collecting first data indicative of a dynamic condition of the first wind turbine blade and the rotor, the first data comprising rotor data and first deflection data, the rotor data being indicative of the azimuth position and rotational velocity of the rotor in a rotor plane perpendicular to the rotor axis, and the first deflection data being indicative of the position, speed and acceleration of one or more parts of the first wind turbine blade, andcalculating an expected tower clearance distance at a predicted time of tower passage for the first wind turbine blade based on at least the acceleration of said one or more parts of the first wind turbine blade in a direction perpendicular to the rotor plane and further on a stiffness or natural frequency of the first wind turbine blade, andperforming measures to prevent tower collision, if the expected tower clearance distance fulfills a collision risk criterion. 2. The method according to claim 1, wherein the first data comprise wind data indicative of the wind velocity. 3. The method according to claim 1, wherein the calculating an expected tower clearance is further based on a known first deflection pattern of the first wind turbine blade. 4. The method according to claim 1, wherein the performing measures to prevent tower collision comprises starting the measures at a first azimuth start position of the first wind turbine blade. 5. The method according to claim 1, wherein the performing measures to prevent tower collision comprises pitching the first wind turbine blade according to a first primary pitching scheme. 6. The method according to claim 5, wherein the method further comprises determining the first primary pitching scheme based on the first data. 7. The method according to claim 5, wherein the method further comprises determining the first primary pitching scheme based on a known first deflection pattern of the first wind turbine blade. 8. The method according to claim 5, wherein the method further comprises determining the first primary pitching scheme such that the expected tower clearance distance, when pitching the wind first wind turbine blade, is in a range from a first expected clearance value to a second expected clearance value. 9. The method according to claim 1, wherein the performing measures to prevent tower collision comprises pitching the first wind turbine blade according to a first primary pitching scheme if the expected tower clearance distance is less than a first threshold value, and pitching the first wind turbine blade according to a first secondary pitching scheme if the expected tower clearance distance is in a range from said first threshold value to a second threshold value. 10. The method according to claim 1, wherein the method further comprises collecting second deflection data indicative of the position, speed and acceleration of one or more parts of a second wind turbine blade of the wind turbine, and wherein the calculating an expected tower clearance distance for the first wind turbine blade is further based on the second data. 11. The method according to claim 1, wherein the calculating an expected tower clearance distance comprises determining an expected time to tower passage, and wherein the calculating an expected tower clearance distance at said predicted time of tower passage for the first wind turbine blade is further based on the expected time to tower passage. 12. The method according to claim 1, wherein the expected tower clearance distance is calculated as a worst case tower clearance distance based on the position, speed and acceleration of said one or more parts of the first wind turbine blade. 13. The method according to claim 12, wherein the worst case tower clearance distance is based on a known first deflection pattern of the first wind turbine blade. 14. The method according to claim 1, wherein the method further comprises predicting at least one of a most probable radial-averaged wind speed for the wind turbine or an expected worst-case radial averaged wind speed. 15. A wind turbine controller for controlling a wind turbine comprising a tower and a rotor provided on top of the tower, the rotor comprising one or more wind turbine blades including at least a first wind turbine blade that rotates about a rotor axis, the wind turbine controller comprising a controller interface and a processor connected to the controller interface, the wind turbine controller being configured for receiving one or more signals indicative of a dynamic condition of the first wind turbine blade and the rotor, wherein the wind turbine controller is configured for collecting first data indicative of the dynamic condition of the first wind turbine blade and the rotor, the first data comprising rotor data and first deflection data, the rotor data being indicative of the azimuth position and rotational velocity of the rotor in a rotor plane perpendicular to the rotor axis, and the first deflection data being indicative of the position, speed and acceleration of one or more parts of the first wind turbine blade, and configured for calculating an expected tower clearance distance at a predicted time of tower passage for the first wind turbine blade based on at least the acceleration of said one or more parts of the first wind turbine blade in a direction perpendicular to the rotor plane and further on a stiffness or natural frequency of the first wind turbine blade, and configured for performing measures to prevent tower collision, if the expected tower clearance distance fulfills a collision risk criterion. 16. The wind turbine controller according to claim 15, wherein the wind turbine controller is configured for performing said measures to prevent tower collision by sending pitch control signals for controlling the pitch of the first wind turbine blade. 17. The wind turbine controller according to claim 15, wherein the wind turbine controller is further configured for predicting at least one of a most probable radial-averaged wind speed for the wind turbine or an expected worst-case radial averaged wind speed.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (5)
Ormel, Frank, Control system and a method for redundant control of a wind turbine.
Olesen, Ib Svend; Glavind, Lars, System and method for identifying the likelihood of a tower strike where a rotor blade strikes the tower of a wind turbine.
Landa, Bernard; Latorre, Carlos Eduardo; Fric, Thomas Frank; Converse, Thomas Omar; Dinjus, Thomas; Brown, Michael Gregory; Torbohm, Gert; Schuell, Nadine, Wind turbine farm and method of controlling at least one wind turbine.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.