An air conditioning system includes a heat pump unit including a radiator usable with a refrigerant, a gas furnace unit including a heating section arranged to heat passing air, a blower arranged to generate an air flow that passes through the radiator and the heating section, and a controller confi
An air conditioning system includes a heat pump unit including a radiator usable with a refrigerant, a gas furnace unit including a heating section arranged to heat passing air, a blower arranged to generate an air flow that passes through the radiator and the heating section, and a controller configured to control each action of the heat pump unit, the gas furnace unit, and the blower. The controller operates either the heat pump unit or the gas furnace unit as a heat source unit, generates a capacity command used to variably adjust operating capacity of the heat source unit, and executes switch control in order to switch the heat source unit from either one of the heat pump unit or the gas furnace unit to the other when an operating capacity level designated in the capacity command is within a predetermined numerical range for a predetermined time.
대표청구항▼
1. An air conditioning system comprising: a heat pump unit including a radiator usable with a refrigerant;a gas furnace unit including a heating section configured and arranged to heat passing air;a blower configured and arranged to generate an air flow that passes through the radiator and the heati
1. An air conditioning system comprising: a heat pump unit including a radiator usable with a refrigerant;a gas furnace unit including a heating section configured and arranged to heat passing air;a blower configured and arranged to generate an air flow that passes through the radiator and the heating section; anda controller configured and arranged to control each action of the heat pump unit, the gas furnace unit, and the blower, the controller being configured to operate either the heat pump unit or the gas furnace unit as a heat source unit,generate a capacity command used to variably adjust operating capacity of the heat source unit, andexecute switch control in order to switch the heat source unit from either one of the heat pump unit or the gas furnace unit to the other based on an average value of an operating capacity level included in the capacity command outputted for a predetermined time. 2. The air conditioning system according to claim 1, wherein the controller is further configured to execute the switch control in order to switch the heat source unit to the heat pump unit when the gas furnace unit is operating as the heat source unit, anda first state is in effect in which the number of times the gas furnace unit starts and stops during a first time period is equal to or greater than a first threshold. 3. The air conditioning system according to claim 2, wherein the first state is a state in which an integrated value of a duty ratio at which the gas furnace unit is in a driving state during a second time period is less than a second threshold. 4. The air conditioning system according to claim 3, wherein the controller is further configured to execute the switch control in order to switch the heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit, anda partial load factor during a third time period is equal to or greater than a third threshold. 5. The air conditioning system according to claim 3, wherein the controller is further configured to calculate a first cost of operating the gas furnace unit as the heat source unit, and a second cost of operating the heat pump unit as the heat source unit;execute cost-saving control in order to switch the heat source unit to the heat pump unit when the gas furnace unit is operating as the heat source unit and the first cost is higher than the second cost by a percentage exceeding a first standard value, andthe heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit and the second cost is higher than the first cost by a percentage exceeding a second standard value; andexecute the switch control with priority over the cost-saving control. 6. The air conditioning system according to claim 3, wherein the controller is further configured to prevent at least one of execution of the switch control from startup until a fourth time period elapses, andexecution of the switch control until a fifth time period elapses. 7. The air conditioning system according to claim 2, wherein the controller is further configured to execute the switch control in order to switch the heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit, anda partial load factor during a third time period is equal to or greater than a third threshold. 8. The air conditioning system according to claim 2, wherein the controller is further configured to calculate a first cost of operating the gas furnace unit as the heat source unit, and a second cost of operating the heat pump unit as the heat source unit;execute cost-saving control in order to switch the heat source unit to the heat pump unit when the gas furnace unit is operating as the heat source unit and the first cost is higher than the second cost by a percentage exceeding a first standard value, andthe heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit and the second cost is higher than the first cost by a percentage exceeding a second standard value; andexecute the switch control with priority over the cost-saving control. 9. The air conditioning system according to claim 2, wherein the controller is further configured to prevent at least one of execution of the switch control from startup until a fourth time period elapses, andexecution of the switch control until a fifth time period elapses. 10. The air conditioning system according to claim 1, wherein the controller is further configured to execute the switch control in order to switch the heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit, anda partial load factor during a third time period is equal to or greater than a third threshold. 11. The air conditioning system according to claim 10, wherein the controller is further configured to calculate a first cost of operating the gas furnace unit as the heat source unit and a second cost of operating the heat pump unit as the heat source unit;execute cost-saving control in order to switch the heat source unit to the heat pump unit when the gas furnace unit is operating as the heat source unit and the first cost is higher than the second cost by a percentage exceeding a first standard value, andthe heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit and the second cost is higher than the first cost by a percentage exceeding a second standard value; andexecute the switch control with priority over the cost-saving control. 12. The air conditioning system according to claim 10, wherein the controller is further configured to prevent at least one of execution of the switch control from startup until a fourth time period elapses, andexecution of the switch control until a fifth time period elapses. 13. The air conditioning system according to claim 1, wherein the controller is further configured to calculate a first cost of operating the gas furnace unit as the heat source unit, and a second cost of operating the heat pump unit as the heat source unit;execute cost-saving control in order to switch the heat source unit to the heat pump unit when the gas furnace unit is operating as the heat source unit and the first cost is higher than the second cost by a percentage exceeding a first standard value, andthe heat source unit to the gas furnace unit when the heat pump unit is operating as the heat source unit and the second cost is higher than the first cost by a percentage exceeding a second standard value; andexecute the switch control with priority over the cost-saving control. 14. The air conditioning system according to claim 13, wherein the controller is further configured to prevent at least one of execution of the switch control until a fourth time period elapses,execution of the cost-saving control from startup until the fourth time period elapses, andexecution of the switch control or the cost-saving control until a fifth time period elapses. 15. The air conditioning system according to claim 1, wherein the controller is further configured to prevent at least one of execution of the switch control from startup until a fourth time period elapses, andexecution of the switch control until a fifth time period elapses.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (18)
Lewis Carl M. (Onalaska WI) Ferguson Peter D. (La Crosse WI), Air conditioning apparatus including a heat pump.
Drucker Alan S. (Dewitt NY) D\Aversa Richard D. (Liverpool NY) Jeffers Richard D. (N. Syracuse NY), Method and apparatus for integrating operation of a heat pump and a separate heating source.
Kovalcik, William; Tynkov, Boris M.; Huibregtse, Brian; Sutphen, John, System and method of controlling condensing and non-condensing boiler firing rates.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.