Equipment maintenance component replacement prioritization planning system and method
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
G06Q-050/10
F02C-009/00
F01D-005/00
G05B-015/02
출원번호
US-0301145
(2015-03-27)
등록번호
US-10161315
(2018-12-25)
우선권정보
JP-2014-078102 (2014-04-04)
국제출원번호
PCT/JP2015/059753
(2015-03-27)
국제공개번호
WO2015/152086
(2015-10-08)
발명자
/ 주소
Kitagawa, Tomoaki
Kasano, Manabu
Nakayama, Aki
Yamada, Akihiko
출원인 / 주소
MITSUBISHI HITACHI POWER SYSTEMS, LTD.
대리인 / 주소
Wenderoth, Lind & Ponack, L.L.P.
인용정보
피인용 횟수 :
0인용 특허 :
19
초록▼
An operation plan preparation and evaluation device including a storage unit for storing master data related to equipment and a component, transaction data related to the equipment and the component generated when an operation plan is prepared, and an initial parameter used when the operation plan i
An operation plan preparation and evaluation device including a storage unit for storing master data related to equipment and a component, transaction data related to the equipment and the component generated when an operation plan is prepared, and an initial parameter used when the operation plan is prepared, and a control unit for preparing the operation plan based on the master data, the transaction data, and the initial parameter, in which the control unit performs a factor setting process of assigning a predetermined set value as the initial parameter, an operation plan preparation process of preparing the operation plan based on the initial parameter serving as the set value, the master data, and the transaction data, and an operation plan evaluation process of evaluating a plurality of respective operation plans prepared by repeatedly performing the operation plan preparation process while varying the initial parameter, and deriving an optimum operation plan.
대표청구항▼
1. An operation plan preparation and evaluation device for preparing an operation plan for a component used in equipment and evaluating the prepared operation plan, the operation plan preparation and evaluation device comprising: storage for storing master information related to the equipment and th
1. An operation plan preparation and evaluation device for preparing an operation plan for a component used in equipment and evaluating the prepared operation plan, the operation plan preparation and evaluation device comprising: storage for storing master information related to the equipment and the component, generated information related to the equipment and the component generated when the operation plan is prepared, and an initial factor used when the operation plan is prepared; andan integrated circuit for preparing the operation plan based on the master information, the generated information, and the initial factor,wherein the integrated circuit performs a factor setting process of assigning a predetermined set value as the initial factor,an operation plan preparation process of preparing the operation plan based on the initial factor serving as the set value, the master information, and the generated information,an operation plan evaluation process of evaluating a plurality of respective operation plans prepared by repeatedly performing the operation plan preparation process while varying the set value of the initial factor in the factor setting process, and deriving an optimum operation plan, andcausing the optimum operation plan for the component to be executed,wherein the master information includes operation job master information related to an operation job of the equipment,the generated information includes individual article list information related to an individual usage condition of the component,the integrated circuit performs a component extraction process of extracting the component, which is required for the operation job and to which a job is not currently allocated, based on the individual article list information,a priority assignment process of assigning priorities to a plurality of components extracted in the component extraction process, anda component selection process of excepting a predetermined quantity mi in descending order of priority from the components to which the priorities are assigned in the priority assignment process, and selecting components corresponding to a required quantity to be used in the operation job in descending order of priority from remaining components, andthe predetermined quantity mi is treated as the initial factor in the factor setting process. 2. The operation plan preparation and evaluation device according to claim 1, wherein the master information includes operation job master information related to an operation job of the equipment,the generated information includes individual article list information related to an individual usage condition of the component,the integrated circuit performs a component extraction process of extracting the component, which is required for the operation job and is not currently used, based on the individual article list information, anda priority assignment process of assigning priorities to a plurality of components extracted in the component extraction process,the priorities are assigned to the components using a formula for computation represented by “priority=coefficient αi×residual life of component+(1−coefficient αi)×removing time of component removed at previous time” or a formula for computation represented by “priority=coefficient αi×priority of residual life of component+(1−coefficient αi)×priority when removing time of component removed at previous time is arranged in time sequence” in the priority assignment process, andthe coefficient αi (0≤αi≤1) is treated as the initial factor in the factor setting process. 3. The operation plan preparation and evaluation device according to claim 2, wherein the generated information includes information about an individual residual life of the component,an evaluation value of the operation plan is calculated using an evaluation function for evaluating the operation plan in the operation plan evaluation process, andthe evaluation function is a function including, as a variable, at least one of a total residual life obtained by adding residual lives of all the components, a predetermined evaluation scale, a quantity of new components, and a quantity of discarded components. 4. The operation plan preparation and evaluation device according to claim 3, wherein the evaluation scale is a weighted average of a purity Pi of a used component in a predetermined operation job i of the equipment,when the number of operation jobs i is set to N, a set of components allocated to the operation jobs i is set to Ci, and a set of components previously allocated to h operation jobs among the components allocated to the operation jobs i is set to Ah,the weighted average of the purity Pi corresponds to a formula for computation represented by “weighted average of purity Pi=Σi{(|Ci|/N)×Pi}”, andthe purity Pi corresponds to a formula for computation represented by “purity Pi=(1/|Ci|)max|Ci^Ai|”, andthe evaluation function is a function represented by “evaluation value=w1×total residual life obtained by adding residual lives of all components+w2×(1−weighted average of purities Pi)+w3×quantity of new components+w4×quantity of discarded components”. 5. The operation plan preparation and evaluation device according to claim 4, wherein an event generation process of generating events including an operation start event in which operation of the equipment starts, and an operation end event in which the operation of the equipment is suspended,an operation start event process of simulating an operation of the component in the operation start event, andan operation end event process of simulating an operation of the component in the operation end event are performed in the operation plan preparation process,the initial factor is a factor for selecting the component used in the operation start event, andthe component is selected based on the set value set in the factor setting process in the operation start event process. 6. The operation plan preparation and evaluation device according to claim 5, wherein a test end event in which a test of the component ends, and a repair end event in which a repair of the component ends are generated in the event generation process, anda test end event process of simulating an operation of the component in the test end event, anda repair end event process of simulating an operation of the component in the repair end event are performed in the operation plan preparation process. 7. An operation plan preparation and evaluation device for preparing an operation plan for a component used in equipment and evaluating the prepared operation plan, the operation plan preparation and evaluation device comprising: storage for storing master information related to the equipment and the component, generated information related to the equipment and the component generated when the operation plan is prepared, and an initial factor used when the operation plan is prepared; andan integrated circuit for preparing the operation plan based on the master information, the generated information, and the initial factor,wherein the integrated circuit performs a factor setting process of assigning a predetermined set value as the initial factor,an operation plan preparation process of preparing the operation plan based on the initial factor serving as the set value, the master information, and the generated information,an operation plan evaluation process of evaluating a plurality of respective operation plans prepared by repeatedly performing the operation plan preparation process while varying the set value of the initial factor in the factor setting process, and deriving an optimum operation plan, andcausing the optimum operation plan for the component to be executed,wherein the master information includes operation job master information related to an operation job of the equipment,the generated information includes individual article list information related to an individual usage condition of the component,the integrated circuit performs a component extraction process of extracting the component, which is required for the operation job and is not currently used, based on the individual article list information, anda priority assignment process of assigning priorities to a plurality of components extracted in the component extraction process,the priorities are assigned to the components using a formula for computation represented by “priority=coefficient αi×residual life of component+(1−coefficient αi)×removing time of component removed at previous time” or a formula for computation represented by “priority=coefficient αi×priority of residual life of component+(1−coefficient αi)×priority when removing time of component removed at previous time is arranged in time sequence” in the priority assignment process, andthe coefficient αi (0≤αi≤1) is treated as the initial factor in the factor setting process. 8. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 1, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 9. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 2, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 10. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 3, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 11. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 4, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 12. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 5, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 13. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 5, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 14. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 6, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan. 15. An operation plan preparation and evaluation method of preparing an operation plan for a component used in equipment and evaluating the prepared operation plan for an operation plan preparation and evaluation device according to claim 7, the operation plan preparation and evaluation method comprising: assigning a predetermined set value as an initial factor used when the operation plan is prepared;preparing the operation plan based on the initial factor serving as the set value, master information related to the equipment and the component, and generated information related to the equipment and the component generated when the operation plan is prepared; andevaluating a plurality of respective operation plans prepared by repeatedly performing the preparing while varying the set value of the initial factor in the assigning, and deriving an optimum operation plan.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (19)
Maity, Ashis K.; Zaremby, David; McMullen, David; Gomez, Juan M., Automated constraint-based scheduling using condition-based maintenance.
Wetzer, Michael; Garrow, Gary R.; West, II, David P.; Weir, Patrick E.; Ashby, Gary; Newton, III, Charles P., Component provisioning or issuance in a maintenance, repair or overhaul environment.
Cornett Rickey R. (Dobson NC) Walsh R. Victor (Winston-Salem NC) Willard Ronald S. (Winston-Salem NC) Johnston Michael Z. (Kernersville NC) Saluta Jaime P. (Winston-Salem NC) Tylak Daniel J. (Lewisvi, Intelligent computer integrated maintenance system and method.
William L. Herron ; David R. Germain ; Louis Andrew Schick, Method and system for monitoring the operation of and predicting part life consumption for turbomachinery.
Aragones James Kenneth ; Eaker Charles Edward ; Irving Russell Robert ; Kornfein Mark Mitchell ; Livingston Steven Thomas ; Ovington Brian Thomas, Method and system for planning repair of an aircraft engine.
Storch Joan A. ; Storch Danny L., Method and system for processing a service request relating to installation, maintenance or repair of telecommunication.
Uchida Shunsuke (Hitachi JPX) Fujimori Haruo (Hitachi JPX) Takahashi Fuminobu (Katsuta JPX) Fukuzaki Takaharu (Hitachi JPX) Yamada Izumi (Ibaraki-ken JPX), Plant monitoring and diagnosing method and system, as well as plant equipped with the system.
Uchida Shunsuke,JPX ; Fujimori Haruo,JPX ; Takahashi Fuminobu,JPX ; Fukuzaki Takaharu,JPX ; Yamada Izumi,JPX, Plant monitoring and diagnosing method and system, as well as plant equipped with the system.
Schick, Louis A; Mangino, Kimberley M.; Hampson, Gregory James; Cuddihy, Paul Edward; Fera, Gregory John; Bliley, Richard Gerald; Meneses, Luis Ivan Gomez; Pierro, Michael James; Schlabach, James E.; Schneider, William Roy, System and method for managing a fleet of remote assets.
Collins John E. (Hudson WI) Sisley Elizabeth M. (Woodbury MN), System and method for producing schedules of resource requests having uncertain durations.
Clay, William S.; Sykora, Richard A.; Morrison, James R., Systems and methods for automatically determining and/or inferring component end of life (EOL).
※ AI-Helper는 부적절한 답변을 할 수 있습니다.