System and method for optimizing wind farm performance
원문보기
IPC분류정보
국가/구분
United States(US) Patent
등록
국제특허분류(IPC7판)
F03D-007/04
G05B-015/02
F03D-017/00
F03D-009/25
F03D-080/70
F03D-015/10
출원번호
US-0493455
(2014-09-23)
등록번호
US-10253758
(2019-04-09)
발명자
/ 주소
Tyber, Steven Jay
Chen, Jianhui
Evans, Scott Charles
Ralston, Kiersten Marie
출원인 / 주소
General Electric Company
대리인 / 주소
GE Global Patent Operation
인용정보
피인용 횟수 :
0인용 특허 :
3
초록▼
The present disclosure is directed to systems and methods for optimizing power output of a wind farm. The method includes determining baseline loading condition(s) for wind turbines of the wind farm and defining a baseline threshold value for the load sensors. Another step includes identifying at le
The present disclosure is directed to systems and methods for optimizing power output of a wind farm. The method includes determining baseline loading condition(s) for wind turbines of the wind farm and defining a baseline threshold value for the load sensors. Another step includes identifying at least one wind turbine having at least one load sensor operating below the baseline threshold value. An upgrade is then provided to the identified wind turbine. In response to the upgrade, the method includes determining whether the load sensor of the identified wind turbine continues to operate below the baseline threshold value. The method also includes classifying an additional load sensor(s) of an additional wind turbine with respect to the load sensor of the identified wind turbine to determine whether to provide the additional wind turbine with the upgrade.
대표청구항▼
1. A method for optimizing power output of a wind farm having a plurality of wind turbines, each wind turbine having a load sensor, the method comprising; estimate, using a farm controller of the wind farm, one or more baseline loading conditions based on measurements from the load sensor for each w
1. A method for optimizing power output of a wind farm having a plurality of wind turbines, each wind turbine having a load sensor, the method comprising; estimate, using a farm controller of the wind farm, one or more baseline loading conditions based on measurements from the load sensor for each wind turbine of the plurality of wind turbines of the wind farm by using a data-driven model, wherein the load sensor determines mechanical load on a wind turbine component and wherein the one or more baseline loading conditions indicate baseline mechanical load for the wind turbine component;define, using the farm controller of the wind farm, a baseline threshold value for each load sensor for each of the plurality of wind turbines of the wind farm;identify, using the farm controller of the wind farm, a test wind turbine having its respective load sensor operating below the baseline threshold value determined using the data-driven model;provide, using the farm controller of the wind farm, an upgrade to the test wind turbine; anddetermine, using the farm controller of the wind farm, whether the load sensor of the test wind turbine continues to operate below the baseline threshold value in response to the upgrade by using a physics-based model, and if so, 1) assign a primary ranking to the load se or of the test wind turbine using the data-driven model:,2) assign a secondary ranking: to the load sensor of an additional wind turbine of the wind farm using the data-driven model3) compare the primary ranking and the secondary ranking; and4) provide the upgrade to the additional wind turbine if the secondary ranking is greater than or equal to the primary ranking. 2. The method of claim 1, further comprising the step of withholding the upgrade to the additional wind turbine if the secondary ranking is less than the primary ranking even if the load sensor of the test wind turbine continues to operate below the baseline threshold value after receiving the upgrade. 3. The method of claim 2, further comprising the step of providing the upgrade to a different test wind turbine in the wind farm if the load sensor of the test wind turbine does not operate below the baseline threshold value after receiving the upgrade. 4. The method of claim 3, further comprising the step of determining a plurality of upgrade configurations for the wind farm based on a comparison between the primary ranking and one or more secondary rankings, wherein each of the upgrade configurations comprises a different selection of wind turbines within the wind farm that are capable of receiving the upgrade. 5. The method of claim 4, further comprising the step of ranking the plurality of upgrade configurations by Annual Energy Production (AEP) gains and operating the wind farm based on the upgrade configuration with a highest AEP gain. 6. The method of claim 1, wherein the upgrade comprises a software update, an indication for hardware update, one or more rotorblade add-ons, or a combination thereof. 7. The method of claim 1, further comprising the step of updating upper and lower limits for the load sensor of the test wind turbine after providing the upgrade to the test wind turbine. 8. The method of claim 1, wherein the one or more baseline loading conditions are estimated by utilizing one or more look-up tables containing pre-existing wind turbine data or calculating the baseline loading conditions via a computer model, wherein the computer model calculates the one or more baseline loading conditions by utilizing one or more of the following: a plurality of equations, one or more aerodynamic performance maps, or one or more look-up tables, and wherein the pre-existing wind turbine data further comprises: a pitch angle, generator speed, power output, torque output, air density, temperature, pressure, wind speed, wind peaks, wind turbulence, wind shear, or wind direction. 9. The method of claim 1, wherein the load sensor comprises an accelerometer, a strain gauge, a pressure sensor, a vibration sensor, a Miniature Inertial Measurement Unit (MIMU), a camera system, a Sonic Detection and Ranging (SODAR) sensor, a Light Detecting and Ranging (LIDAR) sensor, or any combination thereof. 10. The method of claim 1, wherein the baseline loading conditions reflect a loading acting on a rotor blade, a rotor, a hub, a bedplate, a main frame, a generator frame, a pitch hearing, a yaw bearing, a gearbox, a nacelle, a main shaft, a generator, a tower of the wind turbine, or any combination thereof. 11. A method for optimizing power output of a wind farm having a plurality of wind turbines, each wind turbine having a load sensor, the method comprising: estimating, using a farm controller of the wind farm, one or more baseline loading conditions based on measurements from the load sensor for each wind turbine of the plurality of wind turbines of the plurality of wind turbines of the wind farm by using a data-driven model, wherein the load sensor determines mechanical load on a wind turbine component and wherein the one or more baseline loadine conditions indicate baseline mechanical load for the wind turbine component;identifying, using the farm controller of the wind farm, a test wind turbine in the wind farm;defining, using the farm controller of the wind farm, a baseline threshold value for the load sensor of the test wind turbine by using a data-driven model;providing, using the farm controller of the wind farm, an upgrade to the test wind turbine;determining, using the farm controller of the wind farm, whether one or more loading conditions of the test wind turbine are below the baseline threshold value;assigning, using the farm controller of the wind farm, a primary ranking to the load sensor of the test wind turbine;assigning, using the farm controller of the wind farm, a secondary ranking to the load sensor of an additional wind turbine in the wind farm; and,comparing, using the farm controller of the wind farm, the primary ranking and the secondary ranking;providing the upgrade to the additional wind turbine if the secondary ranking is greater than or equal to the primary ranking; andwithholding the upgrade to the additional wind turbine if the secondary ranking is less than the primary ranking. 12. The method of claim 11, further comprising the step of providing the upgrade to a different test wind turbine in the wind farm if the load sensor of the test wind turbine does not operate below the baseline threshold value after receiving the upgrade. 13. The method of claim 12, further comprising the step of determining a plurality of upgrade configurations for the wind farm based on a comparison between the primary ranking and one or more secondary rankings, wherein each of the upgrade configurations comprises a different selection of wind turbines within the wind farm that are capable of receiving the upgrade. 14. The method of claim 13, further comprising the step of ranking the plurality of upgrade configurations by Annual Energy Production (AEP) gains and operating the wind farm based on the upgrade configuration with a highest AEP gain. 15. The method of claim 11, wherein the upgrade comprises a software update, an indication for hardware update, one or more rotorblade add-ons, or a combination thereof. 16. The method of claim 11, further comprising the step of updating upper and lower limits for the load sensor of the test wind turbine after providing the upgrade to the test wind turbine. 17. The method of claim 11, wherein the one or more baseline loading conditions are estimated by utilizing one or more look-up tables containing pre-existing wind turbine data or calculating the baseline loading, conditions via a computer model, wherein the computer model calculates the one or more baseline loading conditions by utilizing one or more of the following: a plurality of equations, one or more aerodynamic performance maps, or one or more look-up tables, and wherein the pre-existing wind turbine data further comprises: a pitch angle, generator speed, power output, torque output, air density, temperature, pressure, wind speed, wind peaks, wind turbulence, wind shear, or wind direction. 18. The method of claim 11, W here i n the load sensor comprises an accelerometer, a strain gauge, a pressure sensor, a vibration sensor, a Miniature Inertial Measurement Unit (MIMU), a camera system, a Sonic Detection and Ranging (SODAR) sensor, a Light Detecting and Ranging (LIDAR) sensor, or any combination thereof. 19. The method of claim 11, wherein the baseline loading conditions reflect a loading acting on a rotor blade, a rotor, a hub, a bed plate, a main frame, a generator frame, a pitch bearing, a yaw bearing, a gearbox, a nacelle, a main shaft, a generator, a tower of the wind turbine, or any combination thereof. 20. A system for optimizing power output of a wind farm, the system comprising: a plurality of wind turbines, each wind turbine having a load sensor configured to monitor one or more mechanical loads acting on a respective wind turbine; anda farm controller configured to: estimate one or more baseline loading conditions based on measurements from the load sensor of each wind turbine of the plurality of wind turbines of the wind farm using a data-driven model, wherein the one or more baseline loading conditions indicate baseline mechanical load for the wind turbine component;define a baseline threshold value for each load sensor for each of the plurality of wind turbines of the wind farm;identify a test wind turbine having its respective load sensor operating below the baseline threshold value estimated using the data-driven model;provide an upgrade to the test wind turbine; anddetermine whether the load sensor of the test wind turbine continues to operate below the baseline threshold value in response to the upgrade using a physics-based model, and if so,1) assign a primary ranking to the load sensor of the test wind turbine using the data-driven model;2) assign a secondary ranking to the load sensor of an additional wind turbine of the wind farm using the data-driven model;3) compare the primary ranting and the secondary ranking; and4) provide the upgrade to the additional wind turbine if the secondary ranking is greater than or equal to the primary ranking. 21. The system of claim 20, wherein the farm controller is configured to withhold the upgrade to the additional wind turbine if the secondary ranking is less than the primary ranking and the load sensor of the identified wind turbine continues to operate below the baseline threshold value after receiving the upgrade.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (3)
Gundling, Chris Henry, Method for enhancement of a wind plant layout with multiple wind turbines.
Gadre, Aniruddha; Morales, Abraham; Yaghi, Nizar; Wan, Valika; Subramaniyan, Venkata, Systems and methods for performance monitoring and identifying upgrades for wind turbines.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.