최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기International journal of management science, v.17 no.1, 2011년, pp.95 - 116
Yang, Jae-Hwan (College of Business Administration, University of Seoul)
This paper considers a flowshop scheduling problem where a customer orders multiple products (jobs) from a production facility. The objectives are to minimize makespan and to minimize the sum of order (batch) completion times. The order cannot be shipped unless all the products in the order are manu...
Ahmadi, R., U. Bagchi, and T. A. Roemer, "Coordinated Scheduling of Customer Orders for Quick Response," Naval Research Logistics 52 (2005), 493-512.
Baker, K. R., "Scheduling the Production of Components at a Common Facility," IIE Transactions 20 (1988), 32-35.
Blocher, J. D. and D. Chhajed, "The Customer Order Lead Time Problem on Parallel Machines," Naval Research Logistics 43 (1996), 629-654.
Blocher, J. D., D. Chhajed, and M. Leung, "Customer Order Scheduling in a General Job Shop Environment," Decision Science 29 (1998), 951-981.
Blocher, J. D. and D. Chhajed, "Minimizing Customer Order Leadiime in a Twostage Assembly Supply Chain," Decision Science 29 (1998), 951-981.
Coffman, E. G., A. Nozari, and M. Yannakakis, "Optimal Scheduling of Products with Two Subassemblies on a Single Machine,"Operations Research 37 (1989), 426-436.
Ding, F. Y., "A Pairwise Interchange Solution Procedure for a Scheduling Problem with Production of Components at a Single Facility," Computers and Industrial Engineering 18 (1990), 325-331.
Garey, M. R., D. S. Johnson, and R. Sethi, "The Complexity of Flowshop and Jobshop Scheduling," Mathematics of Operations Research 1 (1976), 117-129.
Gerodimos, A. E., C. A. Glass, and C. N. Potts, "Scheduling the Production of TwoComponent Jobs on a Single Machine," European Journal of Operational Research 120 (2000), 250-259.
Gonzalez, T. and S. Sahni, "Flowshop and job shop schedules: Complexity and approximation," Operations Research 26 (1978), 36-52.
Graham, R. L., E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnooy Kan, "Optimization and Approximation in Deterministic Machine Scheduling: A Survey," Annals of Discrete Mathematics 5 (1979), 287-326.
Hoogeveen, J. A. and T. Kawaguchi, "Minimizing total completion time in a twomachine flowshop: analysis of special cases," Mathematics of Operations Research 24 (1999), 887-910.
Johnson, S. M., "Optimal Two and ThreeStage Production with Setup Times Included," Naval Research Quarterly 1 (1954), 61-68.
Julien, F. M. and M. J. Magazine, "Scheduling Customer Orders: An Alternative Production Scheduling Approach," Journal of Manufacturing and Operations Management, 3 (1990), 177-199.
Liao, C. J., "Optimal Scheduling of Products with Common and Unique Components," International Journal of Systems Science 27 (1996), 361-366.
Roemer, T. A. and R. Ahmadi, "Complexity of Scheduling Customer Orders," Working Paper, Anderson School at UCLA (1997), USA.
Yang, J., "The Complexity of Customer Order Scheduling Problems on Parallel Machines," Computers and Operations Research 32 (2005), 1921-1939.
Yang, J. and M. E. Posner, "Scheduling Parallel Machines for the Customer Order Problem," Journal of Scheduling 8 (2005), 49-74.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.