최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of construction engineering and project management, v.4 no.1, 2014년, pp.29 - 36
Ghazali, F.E. Mohamed (School of Civil, Universiti Sains Malaysia (Engineering Campus)) , Wong, H.C. (School of Civil, Universiti Sains Malaysia (Engineering Campus))
Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great ri...
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
W.H. Ting, T.A Ooi, B.K Tan, "Tunnelling Activities in Malaysia: 1995-2005", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2006.
F. Amberg, M. Bettelini, N. Seifert, "Design and Full scale testing for safety of Tunnels and Underground Structures", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2011.
H.K.J Adnan, K.S Mohd, "The Malaysian Construction Industry?s Risk Management in Design and Build", Journal of Applied Science, vol. 2, no. 5, pp. 27-33, 2008.
C. Boothroyd, J. Emmett, "Risk Management: A Practical Guide for Construction Professionals", Witherby & Co Ltd., London, UK, 1996.
Z. He, "Risk management for overseas construction projects", International Journal of Project Management, vol. 13, no. 4, pp. 231-237, 1995.
British Standard Institution (BSI), "The International Organization for Standardization, BS ISO 31000: Risk Management-Principles and Guidelines", BSI, London, UK, 2009.
N.J Smith, "Managing Risk in Construction Projects", Blackwell Science Ltd., 1999.
M.Y Norazian, H. Adnan, F.O Ahmad, "Clients? Perspectives of Risk Management Practice in Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no. 3. pp. 121-130, 2008.
H. Adnan, M.N. Rahmat, F.N.M Nur, "Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no.1, pp. 76-81, 2008.
H.P. Wannick, "A Code of Practice for Risk Management of Tunnel Works: Future Tunnelling Insurance from the Insurers? Point of View", Proceedings of International Tunnelling and underground space Association (ITA) Conference, Seoul, Republic of Korea, 2006.
A. Akintoye, E. Fitzgerald, C. Hardcastle, "Risk Management for Local Authorities? Private Finance Initiative Projects", RICS, Proceedings of COBRA Conference 1999, vol. 2, pp.81-91, 1999.
P. Reina, W.J Angelo, "Megaprojects need more study up front to avoid cost overruns", McGraw Hill Construction, 2002. (Retrieved in May 2012: http: //flyvbjerg.plan.aau.dk/News%20in%20English/ENR%20Costlies%20150702.pdf)
B. Flyvbjerg, M.S Holm, S. Buhl, "Underestimating costs in public works projects: Error or Lie?", Journal of the American Planning Association, APA, vol. 68, no. 3, pp. 279-295, 2002.
F. Nega, "Causes and effects of cost overrun on public building construction projects in Ethiopia", PhD Thesis, Addis Ababa University, Ethiopia
M.I Al-Khalil, M.A Al-Ghafly, "Delay in public utility projects in Saudi Arabia", International Journal of Project Management, vol.17, no. 2, pp. 101-106, 1999.
D.W Bordoli, A.N Baldwi, "A methodology for assessing construction projects delays", Journal of Construction Management and Economics, vol. 16, no. 3, pp. 327-337, 1998.
D.K Chimwaso, "An evaluation of cost performance of public projects: Case of Botswana", Proceedings of the 2nd International Conference of the CIB, 2000. (Retrieved in June 2011: http: //buildnet.csir.co.za/cdcproc/docs/2nd /chimwaso_dk.pdf)
P.F Kaming, P.O Olomolaiye, G.D Holt, F.C Harris, "Factors influencing construction time and cost overruns on high-rise projects in Indonesia", Journal of Construction Management and Economics, vol. 15, no. 1, pp. 83-94, 1997.
H. Liu, "The Analysis of Project Risk Management Based on AHP", Proceedings of 2nd IEEE International Conference on Information and Financial Engineering, pp. 576-579, 2010. (Retrieved in February 2011: http: //ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber5609426&tag1)
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
출판사/학술단체 등이 한시적으로 특별한 프로모션 또는 일정기간 경과 후 접근을 허용하여, 출판사/학술단체 등의 사이트에서 이용 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.