최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기전기학회논문지 = The Transactions of the Korean Institute of Electrical Engineers, v.65 no.2, 2016년, pp.269 - 278
김병기 (Dept. of Electrical and Electronic Engineering, Korea University of Education and Technology) , 왕종용 (Dept. of Electrical and Electronic Engineering, Korea University of Education and Technology) , 박재범 (Dept. of Electrical and Electronic Engineering, Korea University of Education and Technology) , 최성식 (Dept. of Electrical and Electronic Engineering, Korea University of Education and Technology) , 유경상 (Korea Institute of Energy Research) , 노대석 (Dept. of Electrical and Electronic Engineering, Korea University of Education and Technology)
In order to maintain customer voltages within allowable limit(
* AI 자동 식별 결과로 적합하지 않은 문장이 있을 수 있으니, 이용에 유의하시기 바랍니다.
핵심어 | 질문 | 논문에서 추출한 답변 |
---|---|---|
BESS가 계통에 도입되어 운용되는 경우의 문제점은? | 따라서 본 논문에서는 SVR의 시지연 기간 동안 전지전력저장장치(Battery Energy Storage System)에 의하여 수용가전압을 안정화시키는 SVR과 BESS의 협조제어알고리즘을 제안한다. 구체적으로 BESS가 계통에 도입되어 운용되는 경우에 기존 SVR모드에서는 BESS의 운용전류가 고려된 SVR의 통과전류에 의하여 크기가 증가하거나 감소하여 SVR의 탭이 기존 탭을 항상 유지하게 되어, BESS의 도입용량만 증가하는 문제점이 발생할 수 있다. 따라서 본 논문에서는 BESS의 운용(충·방전)전류를 고려하지 않고 부하전류에 의해서만 SVR의 탭을 동작시키는 새로운 제어모드를 제안한다. | |
선로전압조정장치를 도입하게 된 배경은? | 이러한 신재생에너지 전원의 활성화 방안에 따라 지자체와 신재생 에너지 발전사업자를 중심으로 대용량 태양광전원을 배전계통에 활발하게 연계하고 있는 실정이다. 하지만, 태양 광전원이 배전계통에 도입되어 운용되는 경우, 급격한 출력변동에 의하여 수용가전압은 규정치를 벗어날 염려가 있다. 이를 해결하기 위하여, 전력회사에서는 태양광전원이 연계된 배전계통에 선로전압조정장치(Step Voltage Regulator)를 도입하고 있다. | |
계통에 전압변동이 발생하여 SVR을 운용하는 경우, 탭 위치는 어떻게 결정되는가? | 상기에서 제안한 SVR의 운용 알고리즘과 BESS 제어 알고리즘을 바탕으로, 어느 시지연 기간 동안 수용가 전압을 적정범위로 유지시키기 위한 SVR과 BESS의 협조제어를 그림 7과 같이 제안한다. 계통에 전압변동이 발생하여 SVR을 운용하는 경우, 탭 위치는 LDC 정정치에 의하여 계산된 SVR의 최적송출전압과 SVR의 기준전압(13,200V)을 비교한 값으로 결정된다. 이때 최적 송출전압은 수용가전압이 규정범위를 벗어나지 않게 되면 기존 부하전류에 의하여 결정되고, 규정범위를 벗어나게 되면 식 (5)와 같이 BESS 전류가 고려되지 않고 기존 부하전류에 의해서만 결정된다, 그리고 시지연 기간 동안 전압변동분의 합이 불감대폭을 벗어나게 되면 SVR의 탭은 동작하게 된다. |
IEEE 1547.6 "IEEE Standard conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power System", June, (2009)
IEEE 1547.1 "IEEE Standard conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power System", June, (2005)
IEEE 1547 "IEEE Standard for Interconnecting Distributed Resources with Electric Power System", July, (2003)
D. Rho and Hasegawa. J, "A study on the optimal voltage regulation methods in power distribution systems interconnected with dispersed energy storage and generation systems", JIEE, Vol. 8, No. 4, pp. 702-707, 1995
B. Kim and D. Rho, "Optimal Voltage Regulation Method for Distribution System with Distributed Generation Systems Using the Artificial Neural Networks", JEET 2013, Vol. 8, No. 4, pp. 712-718, 2013.
D. Rho and M. Kim," A study on the Optimal Operation of Line Voltage Regulator (SVR) in Distribution Feeders", 2004 IFAC Symposium, Seoul, South Korea, 2004. 9.
M. Kim, D. Rho, J. Kim, K. Kim, "Optimal Operation Method of Multiple Voltage Regulators in Distribution Systems Interconnected with Dispersed Storage and Generation Systems", Trans. KIEE. Vol. 54A. No. 2, 2005. 2.
Ljubomir A. Kojovic, "Coordination of Distributed Generation and Step Voltage Regulator Operations for Improved Distribution System Voltage Regulation", IEEE, 2006.
Tomonobu Senjyu, Yoshitaka Miyazato, Atsushi Yona, Naomitsu Urasaki, Toshihisa Funabashi, "Optimal Distribution Voltage Control and Coordination With Distributed Generation", IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 23, NO. 2, pp. 1236-1242, April 2008.
Xiaohu Liu, Andreas Aichhorn, Liming Liu and Hui Li, "Coordinated Control of Distributed Energy Storage System With Changer Transformers for Voltage Rise Mitigation Under High Photovoltaic Penetration", IEEE Transactions Smartgrid, Vol. 3, pp. 897-906, June 2012.
해당 논문의 주제분야에서 활용도가 높은 상위 5개 콘텐츠를 보여줍니다.
더보기 버튼을 클릭하시면 더 많은 관련자료를 살펴볼 수 있습니다.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.