NTIS 바로가기Structural engineering and mechanics : An international journal, v.64 no.2, 2017년, pp.173 - 181
Alvarado, Yezid A. (Pontificia Universidad Javeriana) , Buitrago, Manuel (ICITECH, Universitat Politecnica de Valencia) , Gasch, Isabel (ICITECH, Universitat Politecnica de Valencia) , Dominguez, Maria N. (Pontificia Universidad Javeriana) , Cipagauta, Miguel A. (Pontificia Universidad Javeriana)
This paper analyzes the influence of the construction process on short- and long-term deflections on a reinforced concrete structure poured on-site by a portable industrialized system. A parametric analysis was carried out by the Finite Elements Method (FEM) that considered: a) type of construction ...
ACI 318-14 (2014), Building code requirements for structural concrete, American Concrete Institute, Farmington Hills, MI, USA.
ACI 347-14 (2014), Guide to formwork for concrete, American Concrete Institute, Farmington Hills, MI, USA.
ACI 347.2R-05 (2005), Guide for shoring/reshoring of concrete multistory buildings, American Concrete Institute, Farmington Hills, MI, USA.
ACI 435R-55 (2003), Control of deflection in concrete structures, American Concrete Institute, Farmington Hills, MI, USA.
Aguinaga-Zapata, M. and Bazant, Z.P. (1986), "Creep deflections in Slab Buildings and forces in shores during construction", ACI J., 83, 719-726.
Aguirre Patino, M.F. (2012), "Evolucion de las normas tecnicas y la inclusion de nuevos sistemas constructivos", Informe Economico, 44, 1-7. (in Spanish)
Alvarado, Y.A., Calderon, P.A., Gasch, I. and Adam, J.M. (2010), "A numerical study into the evolution of loads on shores and slabs during construction of multistorey buildings. Comparison of partial striking with other techniques", Eng. Struct., 32(10), 3093-3102.
Alvarado, Y.A., Calderon, P.A., Pallares, F.J. and Pellicer, T. (2006), "Estimation of shore removal times in bidirectional in situ concrete floor slabs applying the maturity method", Proceedings of the 10th East Asia-Pacific Conference on Structural Engineering and Construction, Bangkok, August.
Branson, D.E. (1977), Deformation of Concrete Structures, McGraw-Hill Book Co., New York, NY, USA.
Buitrago, M., Alvarado, Y.A., Adam, J.M., Calderon, P.A., Gasch, I. and Moragues, J.J. (2015), "Improving construction processes of concrete building structures using load limiters on shores", Eng. Struct., 100, 104-115.
Calderon, P.A., Alvarado, Y.A. and Adam, J.M. (2011), "A new simplified procedure to estimate loads on slabs and shoring during the construction of multistorey buildings", Eng. Struct., 33(5), 1565-1575.
Diaz, J.C., Bautista, L., Sanchez, A. and Ruiz, D. (2004), "Caracterizacion de mezclas de concreto utilizadas en sistemas industrializados de construccion de edificaciones", Rev. Ing., 19, 60-73. (in Spanish)
Duan, M.Z. and Chen, W.F. (1995), "Effects of creep and shrinkage on slab-shore loads and deflection during construction", Project Report CE-STR-95-24, Department of Civil Engineering, Purdue University, West Lafayette, Ind.
Duan, M.Z. and Chen, W.F. (1995), "Improved simplified method for slab and shore load analysis during construction", Project Report CE-STR-95-21, Department of Civil Engineering, Purdue University, West Lafayette, Ind.
Eldukair, Z.A. and Ayyub, B.M. (1991), "Analysis of recent U.S. structural and construction failures", J. Perform. Constr. Facil., 5(1), 57-73.
Epaarachchi, D.C., Stewart, M.G. and Rosowsky, D.V. (2002), "Structural reliability of multistory buildings during construction", Struct. Eng., 128(2), 205-213.
Essays, UK (2013), The definition of industrialised building system construction essay. Retrieved from https://www.ukessays.com/essays/construction/the-definitionof-industrialised-building-system-constructionessay.php?cref1.
ETABS (2013), Computers & Structures, INC.
Fang, D.P., Xi, H., Wang, X. and Zhang, Ch. (2009), "Influences of shrinkage, creep, and temperature on the load distributions in reinforced concrete buildings during construction", Tsinghua Sci. Tech., 14(6), 756-764.
Fang, D.P., Xi, H., Wang. X., Zhang, Ch. and Zhao, T. (2009), "Load distribution assessment of reinforced concrete buildings during construction with structural characteristic parameter approach", Tsinghua Sci. Tech., 14(6), 746-755.
Gasch, I., Alvarado, Y.A. and Calderon, P.A. (2012), "Temperature effects on load transmission between slabs and shores", Eng. Struct., 39, 89-102.
Gasch, I., Alvarado, Y.A., Calderon, P.A. and Ivorra, S. (2014), "Construction loads using a shoring-clearing-striking process", P. I. Civil Eng., Struct. B, 167(SB4), 217-229.
Huang, Y., Lin, Y., Lee, C., Chen, H. and Yen, T. (2004), "Design load-carrying capacity estimates and an improved wooden shore setup", Struct. Eng. Mech., 17(2), 167-186.
Kaminetzky, D. and Stivaros, P. (1994), "Early-age concrete: Construction loads, behavior, and failures", Concrete Int., 16(1), 58-63.
Kang, S., Eom, T. and Kim, J. (2013), "Reshoring effects on deflections of multi-shored flat plate systems under construction", Struct. Eng. Mech., 45(4), 455-470.
Lee, H., Liu, X. and Chen, W. (1991), "Creep analysis of concrete buildings during construction", J. Struct. Eng., 117(10), 3135-3148.
Lin, S.C. (2007), "Monitoring of concrete building construction", Can. J. Civil Eng., 34(10), 1334-1351.
Liu, X.L. and Chen, W.F. (1987), "Effect of creep on load distribution in multistory reinforced concrete buildings during construction", Struct. J., 84(3), 192-200.
Moragues, J.J., Catala, J. and Pellicer, E. (1996), "An analysis of concrete framed structures during the construction process", Concrete Int., 18(11), 44-48.
Statgraphics (2013), Statgraphics Centurion XV, StatPoint Technologies, Inc.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.