최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기大韓建築學會論文集. Journal of the architectural institute of korea. 構造系, v.34 no.3 = no.353, 2018년, pp.61 - 68
박소현 ((사)빌딩스마트협회 기술연구소) , 송정화 (남서울대학교 건축학과) , 오건수 (남서울대학교 건축학과)
As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule m...
Jang, G. (2014). Improvement of Cost-Schedule integration using BIM based on Progress Management through PMIS, Thesis, Gachon University.
Kim, H., Choi, J., & Kim, I. (2013). A Methodology of Open BIM-Based Quantity Take-off for Schematic Estimation of Frame Work in Super-Tall Buildings. Journal of Architectural Institute of Korea, 29(5), 31-38
Kim, H., & Kang, I.(2016). Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost. Journal of Construction Engineering and Management, 17(5), 54-61
Oh, K., Park, S., & Song, J. (2016). A Study on the Using of BIM Data and Template for Construction Progress Management. Journal of the Korea Academia-Industrial cooperation Society, 17(8), 157-163
Lee, D., Cha, H., Kim, K., & Shin, D. (2015). Development of BIM-based Construction Document Information Database Information Database Structure through the Link to the BIM Model and Construction Document Information. Journal of Construction Engineering and Management, 16(5), 42-53
Yoon, Y., Suh, S., Jang, G., & Choi, J. (2013). Improvement of Cost-Schedule integration based Progress Management through PMIS. Journal of Construction Engineering and Management, 14(5), 144-152
Jung, J., & Chin, S. (2011). A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase. Journal of Construction Engineering and Management, 12(5), 23-34
Lee, M., Lee, S., & Ock, J. (2011). A Study on the Development of the Property Information Modeling Methods for the Trades without Shape Information. Transaction of the Society of CAD/CAM Engineers, 16(2), 114-125
Yoon, Y., Suk, S., Park, M., & Jang, M., (2008). Construction Process based Schedule Risk Management System. Journal of Construction Engineering and Management, 9(4), 101-110
Lee, J., & Lee, G., (2013). About RTS-SAREK Program works through the BIM data extraction. The magazine of the Society of Air-conditioning Refrigeration Engineer of Korea, 42(4), 50-58
Wang, X., Yung, P., Luo, H., & Truijens, M.(2014). "An innovative method for project control in LNG porject through 5D CAD:A case study." Automation in Constuction 45, pp.126-135
Ding, L., Zhou, Y., & Akinci, R.(2014). "Building Information Modeling(BIM) application framework:The process of expanding from 3D to computable nD." Automation in Constuction 46, pp.82-93
해당 논문의 주제분야에서 활용도가 높은 상위 5개 콘텐츠를 보여줍니다.
더보기 버튼을 클릭하시면 더 많은 관련자료를 살펴볼 수 있습니다.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.