NTIS 바로가기Journal of construction engineering and project management, v.10 no.1, 2020년, pp.16 - 32
Olawale, Yakubu A. (WMG, University of Warwick)
Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 constr...
Acebes, F., Pajares, J., Galan, J., and Lopez-Paredes, A., "A new approach for project control under uncertainty. Going back to the basics", International Journal of Project Management, vol. 32, no. 3, pp. 423-434, 2014.
Platje, A. and Seidel, H., "Breakthrough in multiproject management: how to escape the vicious circle of planning and control", International Journal of Project Management, vol. 11, no. 4, pp. 209-213, 1993.
Besteiro, E., De Souza Pinto, J., and Novaski, O., "Success factors in project management", Business Management Dynamics, vol. 4, no. 9, pp. 19-34, 2015.
Abdul-Rahman, Z. H., Berawi, M., Berawi, A., Mohamed, O., Othman, M.J.A., and Yahya, I., "Delay mitigation in the Malaysian construction industry", Journal of Construction Engineering and Management, vol. 132, no. 2, pp.125-133, 2006.
Chan, A., "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, vol. 19, pp. 223-229, 2001.
White, D. and Fortune, J., "Current practice in project management - An empirical study", International Journal of Project Management, vol. 20, no. 1, pp. 1-11, 2002.
Winch, G. and Kelsey, J., "What do construction project planners do?", International Journal of Project Management, vol. 23, no. 2, pp. 141-149, 2005.
Zou, Y. and Lee, S., "The impacts of change management practices on project change cost performance", Construction Management and Economics, vol. 26, no. 4, pp. 387-393, 2008.
Thompson, C. and Walker, B., "Basics of research (Part 12): Qualitative research," Air Medical Journal, vol. 17, pp. 65-70, 1998.
Chang, A., "Reasons for cost and schedule increase for engineering design projects", Journal of Management in Engineering, vol. 18, pp. 29-36, 2002.
Iyer, K. and Jha, K., "Factors Affecting Cost Performance Evidence from Indian Construction Projects", International Journal of Project Management, vol. 23, pp. 283-295, 2005.
Larsen, J., Shen, G., Lindhard, S., and Brunoe, T., "Factors affecting schedule delay, cost overrun, and quality level in public construction projects", Journal of Management in Engineering, vol. 32, no. 1 pp. 04015032, 2016.
Aibinu, A. and Jagboro, G., "The effects of construction delays on project delivery in Nigerian construction industry," International Journal of Project Management, vol. 20, pp. 593-599, 2002.
Yong, Y. and Mustaffa, N., "Critical success factors for Malaysian construction projects: an empirical assessment", Construction Management and Economics, vol. 31, no. 9, pp. 959-978, 2013.
Akintoye, A., Fitzgerald, E. "A survey of current cost estimating practices in the UK", Construction Management and Economics, vol. 18, no. 2, pp. 161-172, 2000.
Barraza, G. and Bueno, R., "Probabilistic control of project performance using control limit curves", Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 957-965, 2007.
Chan, P., Ho, D., and Tam, C., (2001) "Design and build project success: multivariate analysis", Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100, 2001.
Cho, K., Hong, T., and Hyun, C., (2010) "Integrated schedule and cost model for repetitive construction process", Journal of Management in Engineering, vol. 26, no. 2, pp. 78-88, 2010.
Flyvbjerg, B., Holm, M., and Buhl, S., "How common and how large are cost overruns in transport infrastructure projects?" Transport Reviews, vol. 23, no. 3, pp. 71-88, 2003.
Gibson, G., Wang, Y., Cho, C., and Pappas, M., (2006) "What is preproject planning anyway?" Journal of Management in Engineering, vol. 22, no. 1, pp. 35-42, 2006.
Jung, Y. and Woo, S., "Flexible work breakdown structure for integrated cost and schedule control", Journal of Construction Engineering and Management, vol. 130, no. 5, pp. 616-625, 2004.
Kim, S. and Liu, L. "Cost information models for managing multiple projects". Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 966-974, 2007.
Koga, Y., Chua, D., Loh, P. and Jaselskis, E., "Key determinants for construction schedule performance", International Journal of Project Management, vol. 17, no. 6, pp. 351-359, 1999.
Larson, E., "Project partnering: Results of study of 280 construction projects", Journal of Management in Engineering, vol. 11, no. 2, pp. 30-35, 1995.
Laufer, A. and Tucker, R., "Is construction project planning really doing its job? A critical examination of focus, role and process", Construction Management and Economics, vol. 5, no. 3, pp. 243-266, 1987.
Lee, S., Thomas, S., Tucker, R., "The relative impacts of selected practices on project cost and schedule", Construction Management and Economics, vol. 23, no. 5, pp. 545-553, 2005.
Leu, S., Chen, A., and Yang, C., "A GA-based fuzzy optimal model for construction time-cost trade-off" International Journal of Project Management, vol. 19, pp. 47-58, 2001.
Sanchez, Otavio Prospero, Terlizzi, Marco Alexandre, Cesar de Moraes, Heverton Roberto de Oliveira (2017) Cost and time project management success factors for information systems development projects, IJPM (35), 1608-1626.
Kanwal, N., Zafar, M., Bashir, S., (2017), "The combined effects of managerial control, resource commitment, and top management support on the successful delivery of information systems projects", vol. 35, pp. 1459-1465, 2017.
Young, R. and Poon, S., "Top management support-almost always necessary and sometimes sufficient for success: Findings from a fuzzy set analysis" International Journal of Project Management, vol. 31, pp. 94-957, 2013.
Bryde, D., Unterhitzenberger, C., and Jober, R., "Conditions of success for earned value analysis in projects, International Journal of Project Management, vol. 36, pp. 474-484, 2018.
Ling, F., "How project managers can better control the performance of design-build projects", International Journal of Project Management, vol. 22, no. 6, pp. 477-488, 2004.
Ling, Y., Low, S., Wang, S., and Lim, H., "Key project management practices affecting Singaporean firms' project performance in China", International Journal of Project Management, vol. 27, no. 1, pp. 59-71, 2009.
Marco, A., Briccallero, D., Rafele, C., "Cost and schedule monitoring of industrial building projects: Case study", Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862, 2009.
Milosevic, D. and Patanakul, P., "Standardised project management may increase development projects success" International Journal of Project Management, vol. 23, no. 3, pp. 181-192, 2005.
Ritchie, L. and Spencer, W. O'Connor, "Carrying out qualitative analysis", in: Qualitative research practice: A guide for social science students and researchers, Eds, J. Ritchie, J. Lewis, SAGE publications, London, pp. 219-262, 2003.
Olawale, Y. and Sun, M., "PCIM: Project Control and Inhibiting Factors Management Model", Journal of Management in Engineering, vol. 29, no. 1, pp. 60-70, 2013.
Olawale, Y. and Sun, M., (2015) "Construction project control in the UK: Current practice, existing problems and recommendations for future improvements", International Journal of Project Management, vol, 33 no. 3, pp. 623-637, 2015.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.