최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Journal of KIBIM = 한국BIM학회논문집, v.11 no.4, 2021년, pp.10 - 19
손서연 (국가철도공단) , 이근일 (인프라BIM디지털연구센터) , 정지현 ((주)태성에스엔아이) , 문우형 (국가철도공단)
In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpo...
Alireza Ahmadian, F.F., Rashidi, T.H., Akbarnezhad, A., Waller, S. T. (2017). BIM-enabled sustainability assessment of material supply decisions, Engineering, Construction and Architectural Management, 24(4), pp. 668-695.
Barlish, K., Sullivan, K. (2012). How to measure the benefits of BIM-a case study approach, Automation in Construction, 24, pp. 149-159.
BS EN ISO 19650 (2018). Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) - Information management using building information modelling, British Standards Institute. https://www.iso.org/standard/68078.html (Oct. 4. 2021).
BS EN ISO 19650-2 (2018). Organisation of information about construction works - Information management using building information modelling - Part 2: Delivery phase of assets British Standards Institute. https://www.iso.org/standard/68080.html (Oct. 4. 2021).
Building SMART alliance. (2015). Construction Operations Building information exchange (COBie). https://www.wbdg.org/resources/construction-operations-building-information-exchange-cobie (Oct. 1. 2021).
Chin, S. Y. (2020). Storytelling BIM. CIR. pp. 120-200
CPIx (2013), Building Information Modelling (BIM) Assessment Templates (IT Resource and Supplier Assessment), Construction Project Information Committee, https://www.cpic.org.uk/cpix/cpix-bim-assessment-file (Oct. 5. 2021).
Doloi, H. (2009), Analysis of Pre-Qualification Criteria in Contractor Selection and Their Impacts on Project Success, Construction Management and Economics, 27(12), pp. 1245-1263.
Eastman, C. M., Eastman, C., Teicholz, P., Sacks, R., Liston, K. (2011). BIM Handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wile & Sons. pp. 1-30
El-Abbasy, M.S., Zayed, T., Ahmed, M., Alzraiee, H., Abouhamad, M. (2013), Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process, Journal of Construction Engineering and Management, 139(7), pp. 755-767.
Gangneung-Jejin single-track railway section 2 constrution work (2021). Korea National Railway. pp. 300-375
Giel, B., Issa, R. (2015), Framework for Evaluating the BIM Competencies of Facility Owners, Journal of Management in Engineering, ASCE, pp. 1-15.
Mahamadu, A.-M., Mahdjoubi, L., Booth, C. (2017), Critical BIM qualification criteria for construction pre-qualification and selection, Architectural Engineering and Design Management, 13(5) pp. 326-343.
Manu, E., Ankrah, N., Chinyio, E., Proverbs, D. (2015). Trust influencing factors in maincontractor and subcontractor relationships during projects, International Journal of Project Management, 3(7), pp. 1495-1508.
National Jidokgwon Forest Healing Center Creation Project (2020). Public Procurement Service. https://www.g2b.go.kr/pt/menu/selectSubFrame.do?framesrc/pt/menu/frameTgong.do?urlhttps://www.g2b.go.kr:8101/ep/tbid/tbidList.do?taskClCds&bidNm%C1%F6%B4%F6%B1%C7&searchDtType1&fromBidDt2019/11/01&toBidDt2021/12/30&fromOpenBidDt&toOpenBidDt&radOrgan1&instNm&area®YnY&bidSearchType1&searchType1 (Oct. 6. 2021).
PAS 1192:3 (2013), Tender Documents BIM 1401, https://cic.org.uk/admin/resources/bim-1401-tender-documents.pdf (Oct. 5. 2021).
Railway BIM 2030 Roadmap (2018). Ministry of Land, Infrastructure and Transport. http://big.yonsei.ac.kr/railbim/reports/RailBIM2030Roadmap_Full_Eng_Final.pdf (Oct. 4. 2021).
Singapore Government (2013). Singapore_BIM_Guide Version 2.0, https://www.corenet.gov.sg/general/bim-guides/singapore-bim-guide-version-20.aspx (Oct. 5. 2021).
Succar, B., Sher, W., Williams, A. (2013), An Integrated Approach to BIM Competency Assessment, Acquisition And Application, Automation in Construction, 35, pp. 174-189.
Van Berlo, L. A. H. M., Dijkmans, T., Hendriks, H., Spekkink, D., Pel, W. (2012). BIM QuickScan: benchmark of BIM performance in the Netherlands. In Proceedings of the CIB. https://itc.scix.net/pdfs/w78-2012-Paper-30.pdf (Oct. 5. 2021).
Mahamadu, A. M., Manu, P., Mahdjoubi, L., Booth, C., Aigbavboa, C., Abanda, F. H. (2019). The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management. https://www.research.manchester.ac.uk/portal/files/99833447/Authors_Accepted_Version.pdf (Oct. 1. 2021).
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
출판사/학술단체 등이 한시적으로 특별한 프로모션 또는 일정기간 경과 후 접근을 허용하여, 출판사/학술단체 등의 사이트에서 이용 가능한 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.