NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.22 no.3, 2021년, pp.12 - 20
이종태 (충남대학교 건축공학과(조달청 시설사업국)) , 윤현도 (충남대학교 건축공학과)
In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction perio...
Han, T.G., and Kim, Y.S. (2000). "An Estimation Method of Activity Duration Using Fuzzy Set Theory." Journal of the Regional Association of Architectural Institute of Korea, 16(3), pp. 93-102.
Hong, S.H. (2018). "The Current Status and Implications of the Construction Period Calculation System for Overseas Public Construction Projects." Construction Management, Korea Construction Management Association, 19(6), p. 50.
Hwang, H.S. (2002)0 "Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction." Korean Journal of Construction Engineering and Management, KICEM, 3(3), pp. 84-93.
Lee, B.S., Kim, K.N., and Lee, M.J. (2015). "A Study on Normal Project Duration for Water Resource Project." Journal of the Korea Construction Management Association, Korea Construction Management Association, 16(1), pp. 37-38.
Lee, H.S. (1996). "A Method of Estimating the Construction Duration based on Repetitive Work Modules for Reinforced Concrete Buildings." Journal of the Architectural Institute of Korea, Architectural Institute of Korea, 12(5), pp. 266.
Ministry of Employment and Labor Act No. 15513 (Mar. 20, 2018). "Labor Standards Act"
Ministry of Land, Infrastructure and Transport Notification No. 2020-15 (Jan. 13, 2020). "Guidelines for design competition, implementation of basic design, etc. and review of economic feasibility of design"
Ministry of Land, Infrastructure and Transport Ordinance No. 1140 (Jan. 1, 2019). "Standards for Calculating Construction Period for Public Construction Works"
Ministry of Strategy and Finance Ordinance No. 386 (Jul. 12, 2018), "Guidelines for managing total project costs"
Park, M.S., Kim, S., and Sin, E.Y. (2019). "Analysis of the Critical Path for Calculating the Proper Construction Period of Construction Project." Proceedings of the Korea Construction Management Association Conference, Korea Construction Management Association, p. 127.