최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기韓國地盤工學會論文集 = Journal of the Korean geotechnical society, v.37 no.6, 2021년, pp.5 - 20
박종전 (연세대학교 토목환경공학과) , 김도현 (매사추세츠공과대학교 토목환경공학과) , 정경자 (한국도로공사 도로교통연구원) , 정상섬 (연세대학교 토목환경공학과)
In this study, a modified empirical formula for estimating the bearing capacity of the steel pipe prebored and precast pile was proposed by performing 20 cases of real-scale field pile loading tests. The proposed formula will be based on expanded SPT N-value in order to consider the realistic condit...
AIJ (2004), Recommendations for design of building foundations, Architectural Institute of Japan, Tokyo.
American Society for Testing and Materials D1143-87. (2009). Standard Test Method for Piles Under Static Axial Compressive Load.
Boresi, A. (1965), "Elasticity in engineering mechanics", Prentice Hall, N.J.
Briaud, J.L., Jeong, S., and Bush R. (1991), "Group Effect in the Case of Downdrag", Geotechnical Engineering Congress, Geotechnical Special Publication, No.27, pp.505-518.
Broms, B. (1979), "Negative Skin Friction", Proceedings of the 6th Asian Regional Conference of Soil Mechanics and Foundation Engineering, Singapore, Vol.2, pp.41-75.
De Beer, E. (1986), "Different behavior of Bored and Driven Piles", Proceeding of 6th Danubian Conference on Soil Mechanics and Foundation Engineering, pp.307-318.
Ghionna, N., Jamiolkowski, M., Lancellotta, R., and Pedroni, S. (1993), "Base Capacity of Bored Piles in Sands from in Situ Tests", Proceeding of 2nd International Geotechnical Seminar on Deep Foundation on Bored and Auger Piles, A. A. Balkema, Rotterdam, Brookfield, pp.67-75.
Jeong, S., Ahn, S., and Seol, H. (2010), "Shear Load Transfer Characteristics of Drilled Shafts in Rocks", Rock Mechanics and Rock Engineering, Vol.43, No.1, pp.41-54.
Jeong, S. and Kim, D. (2018), "Estimation of the Load Sharing Ratio of Pre-installed Columns in Top-down Buildings on Korean Rock", KSCE Journal of Civil Engineering, Vol.22, No.12, pp. 4852-4861.
Johnston, I. and Lam, T. (1989), "Shear behavior of Regular Triangular Concrete/rock Joints-analysis", ASCE Journal of Geotechnical Engineering, Vol.115, No.5, pp.711-727.
Kim, D. (2018), "Proposed Shaft Resistance of Prebored and Precast Pile using Field Loading Test", Doctoral Dissertation, Yonsei University, Seoul, Korea.
Kim, D., Jeong, S., Jung, G., and Park, J. (2018), "Load-sharing Ratio of Prebored and Precast Pile in Top-down Method Construction Process", Structural Design of Tall and Special Buildings, Vol.27, No.10, pp.1-14 (doi: 10.1002/tal.1472).
Kim, D., Jeong, S., and Park, J. (2020), "Analysis on Shaft Resistance of the Steel Pipe Prebored and Precast Piles based on Field Load-transfer Curves and Finite Element Method", Soils and Foundations, Vol.60, No.2, pp.478-495 (https://doi.org/10.1016/j.sandf.2020.03.011).
Kim, S., Jeong, S., Cho, S., and Park, I. (1999), "Shear Load Transfer Characteristics of Drilled Shafts in Weathered Rocks", ASCE Journal of Geotechnical and Geoenvironmental Engineering, Vol.125, No.11, pp.999-1010.
Korean Land and Housing Corporation Structural Design Manual (2008), Korean Land and Housing Corporation, Jinju, Korea.
Setting up Design Criteria of Bored Pile for Bridge Foundations as Enforcement of Limit State Design (2018), Korean Land and Housing Corporation, Jinju, Korea.
Korean Geotechnical Society. (2018), Standards for Foundation Design of Structures, CIR.
Korean Structure Foundation Design Standards (2018), Korean Geotechnical Society, Seoul, Korea.
Ministry of Land, Infrastructure and Transportation (2014), Infrastructure R&D report on PHC prebored and precast piles, Seoul, Korea.
Ng, C., Zhang, L., and Nip, D. (2001), "Response of Laterally Loaded Large-Diameter Bored Pile Groups", ASCE Journal of Geotechnical and Geoenvironmental Engineering, Vol.127, No.8, pp.658-669.
O'Neill, M., Townsend, F., Hassan, K., Buller, A., and Chan, P. (1996), "Load Transfer for Drilled Shafts in Intermediate Geomaterials", Federal Highways Administration.
Park, J. (2004), "Strength and Friction behavior of Cement Paste Pou red in the Bored Pile", Journal of the Korean Geoenvironmental Society, Vol.5, No.3, pp.31-39.
Reese, L. and O'Neill, M. (1988), "Drilled Shafts: Construction Procedures and Design Methods", Publication No. FHWA-HI-88-042, Federal Highway Administration, Washington, D.C.
Seol, H., Jeong, S., and Cho, S. (2009), "Analytical Method for Load-transfer Characteristics of Rock-socketed Drilled Shafts", ASCE's Journal of Geotechnical and Geoenvironmental Engineering, Vol.135, No.6, pp.778-789.
Yamagata, K., Ito, A., Tanaka, T., and Kuramoto, Y. (1992), "Statistical Study on Ultimate Point Load and Point Load-settlement Characteristics of Bored Precast Piles", AIJ Journal of Structural and Construction Engineering, Vol.436, No.6, pp.778-789.
Yun, J., Yea, G., Kim, H., and Choi, Y. (2019), "Case Study on Design Efficiency and Bearing Capacity Characteristics of Bored PHC Piles", Journal of Korean Geosynthetics Society, Vol.18, No.3, pp.45-53.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.