최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.23 no.1, 2022년, pp.89 - 97
이성호 (아주대학교 대학원 스마트융합건축학과) , 차희성 (아주대학교 건축학과) , 손보식 (남서울대학교 건축공학과)
Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) m...
Cao, X., Li, X., Zhu, Y., and Zhang, Z. (2015). "A comparative study of environmental performance between prefabricated and traditional residential buildings in China." Journal of Cleaner Production, Elsevier, 109, pp. 131-143.
Chen, Y., Okudan, G.E., and Riley, D.R. (2010). "Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization." Automation in Construction, Elsevier, 19(6), pp. 665-675.
Construction Industry Institute (CII) (2017). IR171-2 Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool, V, 2017-01.
Fard, M.M., Terouhid, S.A., Kibert, C.J., and Hakim, H. (2017). "Safety concerns related to modular/prefabricated building construction." International journal of injury control and safety promotion, 24(1), pp. 10-23.
Gibb, A. (2001). "Preassembly in Construction: a Review of Recent and Current Industry and Research Initiatives on Pre-assembly in Construction." Construction Research & Innovation Strategy Panel, London.
Gyeonggi Housing & Urban Development Corporation, GH (2018). "Hwasung Dongtan District 2 A86BL Private Participation Apartment Housing Project." Construction cost information disclosure, (Sep. 15, 2021).
Gyeonggi Housing & Urban Development Corporation, GH (2020). "Dasan Jingun A1 Block Private Participation Public Housing Project." Construction cost information disclosure, (Sep. 15, 2021).
Gyeongsangbuk-do Development Corporation (2017). "Sandwich Half PC Wall Structure Eco-Friendly Stormwater Reservoir." Gyeongbuk Provincial Government New Town Construction Project Notice, (Oct. 13, 2021).
Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated prefinished volumetric construction." Automation in Construction, Elsevier, 94, pp. 168-178.
Jeollabuk-do Office of Education (2021). "Breakdown Cost for the first half of 2021(Architecture)." Facilities Department Archive, (Oct. 13, 2021).
Lee, S.H., and Cha, H.S. (2021). "A study of Developing Performance Management System Framework by Phase/Criteria for OSC Project." Proceedings of the Architectural Institute of Korea, 41(1), pp. 466-467.
Lim, B.L. (2004). "Apartment Estimation Program." Construction Technology SsangYong, 31, pp. 6-11.
O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2014). "Critical success factors and enablers for optimum and maximum industrial modularization." Journal of Construction Engineering and Management, ASCE, 140(6), 04014012.
Sharafi, P., Rashidi, M., Samali, B. Ronagh, H., and Mortazavi, M. (2018). "Idendification of factors and decision analysis of the level of modularization in building construction." Journal of Architectural Engineering, ASCE, 24(2), 04018010.
Son, J.W., and Lee, J.S. (2019). "Off-Site Construction: Innovation of construction production system." Construction Engineering and Management, KICEM, 20(5), pp. 3-7.
Yu, I.H. (2013). "Plan to revitalize industrialized construction." Construction Engineering and Management, KICEM, 14(2), pp. 28-32
Yu, I.H. (2019). "Activation of OSC industry and change and development direction for specialized contractors." Construction Engineering and Management, KICEM, 20(5), pp. 12-18.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.