NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.23 no.3, 2022년, pp.13 - 24
최정원 (세종대학교 건축학과) , 김한수 (세종대학교 건축학과)
Construction projects are exposed to various types of risks, which tend to increase. The increasing risks call for contractors' more attentions to forecasting and dealing with these risks. One of the measures to deal with contractors' risks is to forecast or estimate risk cost and include it in the ...
An, S.H., and Lee, W.H. (2012). "Case-based Reasoning Model for Building Construction Cost Management by using Risk Analysis." Journal of Korean Society of Industrial and Systems Engineering, KSISE, 28(10), pp. 157-164.
An, S.H., Suk, S.J., and Lee, M.H. (2011). "Weighting of Key Factors Influencing the Cost Budgeting in Building Construction Projects." Journal of Korean Society of Industrial and Systems Engineering, KSISE, 27(5), pp. 119-126.
Diab, M.F., Varma, A., and Panthi, K. (2017). "Modeling the construction risk ratings to estimate the contingency in highway projects." Journal of Construction Engineering and Management, ASCE, 143(8), pp. 04017041-1-04017041-9.
Ebrat, M., and Ghodsi, R. (2014). "Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study." KSCE Journal of Civil Engineering, KSCE, 18(5), pp. 1213-1227.
El-Kholy, A.M., Tahwia, A.M., and Elsayed, M.M. (2020). "Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models." International Journal of Construction Management, pp. 1-15.
Hamid, R.A., and Kehinde F.J. (2017). "Choosing an appropriate contingency sum estimating methods for highway construction projects in nigeria: a literature review." The Journal of the Malaysia Institute of Planners, PLANNING MALAYSIA, 15(1), pp. 13-21.
Howell G. (2012). "Uncertainty and contingency: implications for managing projects." Proceedings of the 20th Annual Conference of the International Group for Lean Construction, The International Group For Lean Construction.
Kang, H.W., Min, B.J., and Kim, Y.S. (2010). "A Study on the Costs Variation Range through the Risk Factors for Overseas Plant Projects." Journal of the Architectural Institute of Korea Structure & Construction, Architectural Institute Of Korea, 26(7), pp. 139-146.
Karunarathne, B.V.G., and Kim, B.S. (2018). "A Study on the Allocation and Prediction of Contingency Reserves Using Monte Carlo Simulation." Proceedings of the National University Student Conference, KICEM, pp. 106-107.
Kermanshachi, S., and Rouhanizadeh, B. (2018). "Feasibility analysis of post disaster reconstruction alternatives using automated BIM-based construction cost estimation tool." Proceeding of CSCE 6th International Disaster Mitigation Specialty Conference, Montreal: Canadian Society of Civil Engineering, Canadian Society of Civil Engineering.
Kim, D.Y. (2016). "Risk-based Decision Model for Contingency Estimation of Large Construction Projects." Journal of Decision Science, The Korea Society of Decision Sciences, 24(2), pp. 11-26.
Lee, H.J., and Suhr, M.S. (2011). "A Study on the Analysis of Cost Management System and the Awareness for large and small Construction Company." Proceedings of the National University Student Conference, KICEM, pp. 39-42.
Lee, J.Y. (2010). "Analysis of the Schedule Risk Importance using PROMETHEE in Building Construction Management." MS thesis, Kyungwon Univ., Gyeonggi-do.
Lee, M.H. (2011). "A Study to Establish Measures to Manage costs through an Analysis of Factors that Affect a construction projects of a Construction Work." MS thesis, Deagu Univ., Gyeongsangbuk-do.
Lhee, S.C., Flood, I., and Issa R.R.A. (2014). "Development of a two-step neural network-based model to predict construction cost contingency." Journal of Information Technology in Construction, Kungliga Tenkniska Hoegskolan/Royal Institute of technology, 19(24), pp. 399-411.
Love, P.E.D., Wang, X., Sing, C.P., and Tiong, R.L.K. (2013). "Determining the probability of project cost overruns." Journal of Construction Engineering and Management, ASCE, 139(3), pp. 321-330.
Nieto-Morote, A., and Ruz-Vila, F. (2011). "A fuzzy approach to construction project risk assessment." International Journal of Project Management, 29(2), pp. 220-231.
Rani, H.A. (2017). "The Analysis of Importance Index to the Dominant Category Causing Contractor Contingency Cost in Aceh Province." University Of Muhammadiyah Aceh, Academia.edu, pp. 1-5.
Salah, A., and Moselhi, O. (2015). "Contingency modelling for construction projects using fuzzy-set theory." Engineering, Construction and Architectural Management, emerald PUBLISHING, 22(2), pp. 214-241.
Taroun, A. (2014). "Towards a better modelling and assessment of construction risk: Insights from a literature review." International Journal of Project management, Association for Project Management (APM) and the International Project Management Association (IPMA), 32(1), pp. 101-115.
Yoo, J.K., Kim, D.H., Moon, D.S., and Lee, H.S. (2019). "Study on Introduction of Probabilistic Contingency using Stochastic Cost-Risk Assessment Model.: Journal of the Korean Society for Railway, The Korean Society For Railway, 22(2), pp. 178-187.
Yun, G.C., and Kim, H.S. (2003). "Systematization of Core Knowledge for Construction Project Budget." Journal of Korean Society of Industrial and Systems Engineering, KSISE, 19(3), pp. 147-154.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.