NTIS 바로가기KSCE Journal of Civil and Environmental Engineering Research = 대한토목학회논문집, v.43 no.1, 2023년, pp.79 - 89
김용환 (경상국립대학교 토목공학과 대학원) , 윤형석 (경상국립대학교 토목공학과 대학원) , 이재희 (경상국립대학교 토목공학과 대학원) , 강인석 (경상국립대학교 토목공학과, 공학연구원)
The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other han...
Alanjari, P., RazaviAlavi, S. R. and AbouRizk, S. (2015). "Hybrid?genetic algorithm-simulation optimization method for proactively?planning layout of material yard laydown." Journal of Construction Engineering and Management, KICEM, Vol. 141, No. 10.
Hyun, B. E., Kim, C. E., Rho, J. P. and Lee, S. T. (2003). New?logistics management, Yulgok Publishing House, Seoul, Korea?(in Korean).
Im, K. S., Han, S. H., Jung, D. Y., Ryu, C. K. and Choi, S. K. (2008).?"Inventory management in construction operations involving on-site?fabrication of raw materials." Korean Journal of Construction?Engineering and Management, KICEM, Vol. 9, No.1, pp. 187-198?(in Korean).
Jacobs, F. R., Berry, W., Whybark, D. C. and Vollmann, T. (2005).?Manufacturing planning and control for supply chain management,?McGraw-Hill, New York, USA.
Jung, D. Y., Park, S. H., Kwak, S. N., Kim, H. K. and Han, S. H.?(2006). "Optimal inventory management for rebar fabrication?process in construction process." Conference of the Korean Journal?of Construction Engineering and Management, KICEM, pp.?702-707 (in Korean).
Kim, S. H., Kim, G. H. and Kang, K. I. (2004). "A study on the?effective inventory management by optimizing lot size in building?construction." Proceedings of the Korean Institute of Architectural?Engineering, Vol. 4, No. 2, pp. 73-80 (in Korean).
Kim, Y. H. (2014). Economic inventory management methodology?of construction project considering stock yard size, Master's?Thesis, Gyeongsang National University (in Korean).
Lee, J. M., Yu, J. H. and Kim, C. D. (2007). "A economic order?quantity (EOQ) determination method considering stock yard size."?Korean Journal of Construction Engineering and Management,?KICEM, No. 9, pp. 549-552 (in Korean).
Lee, J. M., Yu, J. H., Kim, C. D., Lee, K. J. and Lim, B. S. (2008).?"Order point determination method considering materials demand?variation of construction site." Structure of the Proceedings of the?Korean Institute of Architecture, Vol. 24, No. 10, pp. 117-125 (in?Korean).
Lee, S. B. (2004). "A study on optimal lead time selection measures?of the construction materials." Proceedings of the Korean Institute?of Architectural Engineering, Vol. 4, No. 1, pp. 105-110 (in Korean).
Lee, S. H. (2012). The research of optimal inventory management?using simulation method, Master's Thesis, Kwangwoon University,?Seoul (in Korean).
Tommelein, I. D. and Weissenberger, M. (1999). "More just-in-time:?Location of buffers in stuctural steel supply and construction?proesses." 7th Annual Conference of the International Group for?Lean Construction, Berkeley, CA, USA, pp. 26-28.
Yun, J. S., Yu, J. H. and Kim, C. D. (2011). "Economic order?quantity (EOQ) determination process for construction material?considering demand variation and stockyard availability." Korean?Journal of Construction Engineering and Management, KICEM,?Vol. 12, No. 1, pp. 33-42 (in Korean).