최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기한국건설관리학회논문집 = Korean journal of construction engineering and management, v.24 no.2, 2023년, pp.24 - 36
정서영 (광운대학교 건축공학과) , 유정호 (광운대학교 건축공학과)
OSC is drawing attention to supplement limitations such as productivity problems and on-site safety and quality problems of existing on-site labor-oriented construction production methods. In order to activate the introduction and use of OSC in the domestic construction market, it is important to in...
Abanda, F.h., Tah, J.h.m., and Cheung, F.k.t. (2017). "BIM?in off-Site Manufacturing for Buildings." Journal of?Building Engineering, 14, pp. 89-102.
Allied Market Research. (2021). Offsite Construction Market?by Material, Construction Type and Application: Global?Opportunity Analysis and Industry Forecast, 2021-2030.
Barlow, J., Childerhouse, P., Gann, D., Hong-Minh, S.,?Naim, M., and Ozaki, R. (2003). "Choice and delivery?in housebuilding: Lessons from Japan for UK?housebuilders." Building Research and Information,?31(2), pp. 134-145.
Blismas, N.G., and Wakefield, R. (2009). "Drivers, constraints?and the future of offsite manufacture in Australia."?Constr Innov., 9(1), pp. 72-83.
Choi, J.O. (2014). "Links between modularization critical?success factors and project performance." The?University of Texas at Austin.
Choi, J.O., and O'Connor, J.T. (2014). "Modularization critical?success factors accomplishment: Learning from case?studies." Construction Research Congress, pp. 1636-1645.
Choi, J.O., O'Connor, J.T., and Kim, T.W. (2016). "Recipes?for cost and schedule successes in industrial modular?projects: qualitative comparative analysis." Journal of?Construction Engineering and Management, 142(10), 04016055.
Haas, C.T., and Fagerlund, W.R. (2002). Preliminary research?on prefabrication, pre-assembly, modularization and?offsite fabrication in construction. Austin, TX. Retrieved?from https://smartech.gatech.edu/handle/1853/10883
Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated?prefinished volumetric construction." Autom Constr.,?94, pp. 168-178.
Ismail, F., Yusuwan, N.M., and Baharuddin, H.E.A. (2012).?"Management factors for successful IBS projects?implementation." Procedia - Social and Behavioral?Sciences, 68, pp. 99-107.
Jung, S.Y. (2022). "DfMA Assessment Model for Selecting?Optimum Design in OSC projects." Ph.D thesis,?Kwangwoon University.
Jung, S.Y., and Yu, J.H. (2021). "A Study on the Critical?Success Factors of Off-Site Construction through?Keyword Frequency Analysis - A Literature Review of?Overseas Research -" Korean Journal of Construction?Engineering and Management, KICEM, 22(1), pp. 13-26.
Kamar, K.A.M., Alshawi, M., and Hamid, Z.A. (2009).?"Industrialised building system: The critical success?factors. 9th international postgraduate research?conference (IPGRC)" Salford: University of Salford, pp.?485-497.
Korea Institute of Civil Engineering and Building?Technology. (2020). "Policy Issues for the Revitalization?of Precast Concrete Apartment Housing" KICT Insight 10.
Lau, A.K.W. (2011). "Critical success factors in managing?modular production design: Six company case studies?in Hong Kong, China, and Singapore." Journal of?Engineering and Technology Management, 28(3), pp.?168-183.
Lawson, R.M., Ogden, R.G., and Bergin, R. (2011).?"Application of modular construction in high-rise?buildings." Journal of Architectural Engineering, 18, pp.?148-154.
Lessing, J., Stehn, L., and Ekholm, A. (2005). "Industrialised?housing: Definition and categorisation of the concept."?Proceedings of the in the 13th annual conference in the?international group for lean construction, Sydney, pp.?471-480.
Martilla JA, James JC. (1977). "Importance-performance?analysis" J.Mark., 41(1), pp.77-79.
Murtaza, M.B., Fisher, D.J., and Skibniewski, M.J.?(1993). "Knowledgment-based approach to modular?construction decision support." J Constr Eng Manag.,?119(1), pp. 115-130.
O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2015).?"Standardization strategy for modular industrial plants."?J Constr Eng Manage., 141(9), 04015026.
Park, N.J. (2009). "More effective application of importance-performance analysis in the case of cyber lecture."?Journal of the Korean Data & Information Science?Society, 20(2), pp. 329-338.
Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2007). "Perspective?of UK housebuilders on the use of offsite modern?methods of construction." Constr Manage Econ., 25(2),?pp. 183-194.
Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2008). "Leading?UK housebuilders' utilization of offsite construction?methods." Building Research and Information, 36(1), pp.?56-67.
Son, J.W., and Lee, J.S. (2019). "Off-Site Construction:?Innovation in Construction Production System."?Construction Engineering and Management, 20(5), pp.?3-7.
Vrijhoef, R., Cuperus, Y,. and Voordijk, H. (2002). Exploring?the Connection between Open Building and Lean?Construction: Defining a Postponement Strategy for?Supply Chain Management in Proceedings IGLC-10?Gramado, Brazil.
Wang, Z., Hu, H., Gong, J., Ma, X., and Xiong, W. (2019).?"Precast supply chain management in off-site?construction: A critical literature review." Journal of?Cleaner Production, 232, pp. 1204-1217.
Wuni, I.Y., and Shen, G.Q. (2019). "Critical success factors?for modular integrated construction projects: a review."?Build Res Inform., pp. 1-22.
Wuni, I.Y., and Shen, G.Q. (2020). "Critical success factors?for management of the early stages of prefabricated?prefinished volumetric construction project life?cycle." Engineering, Construction and Architectural?Management, 27(9), pp. 2315-2333.
Wuni, I.Y., Shen, G.Q., and Osei-Kyei, R. (2020).?"Quantitative evaluation and ranking of the critical?success factors for modular integrated construction?projects." International Journal of Construction?Management, 22(11), pp. 2108-2120.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.