남소현 (서울대학교 조선해양공학과) , 조영인 (서울대학교 조선해양공학과) , 우종훈 (서울대학교 조선해양공학과)
The profile shops in shipyards produce section steels required for block production of ships. Due to the limitations of shipyard's production capacity, a considerable amount of work is already outsourced. In addition, the need to improve the productivity of the profile shops is growing because the p...
Chaudhry, I.A. and Elbadawi, I.A., 2017. Minimisation of total?tardiness for identical parallel machine scheduling using?genetic algorithm. Sadhana, 42(1), pp.11-21.
Chen, C.L. and Chen, C.L., 2009. Hybrid metaheuristics for?unrelated parallel machine scheduling with sequence-dependent setup times. The International Journal of?Advanced Manufacturing Technology, 43(1), pp.161-169.
Julaiti, J., Oh, S.C., Das, D. and Kumara, S., 2022. Stochastic?parallel machine scheduling using reinforcement learning.?Journal of Advanced Manufacturing and Processing, 4(4),?pp.e10119.
Kim, D.W., Kim, K.H., Jang, W. and Chen, F.F., 2002.?Unrelated parallel machine scheduling with setup times?using simulated annealing. Robotics and Computer-Integrated?Manufacturing, 18(3-4), pp.223-231.
Lee, C.H., 2018. A dispatching rule and a random iterated?greedy metaheuristic for identical parallel machine scheduling?to minimize total tardiness. International journal of production?research, 56(6), pp.2292-2308.
Lee, J.H., Yu, J.M. and Lee, D.H., 2013. A tabu search?algorithm for unrelated parallel machine scheduling with?sequence-and machine-dependent setups: minimizing total?tardiness. The International Journal of Advanced Manufacturing Technology, 69(9), pp.2081-2089.
Lee, J.W. and Kim, H.J., 1995. Erection process planning &?scheduling using genetic algorithm. Journal of the Society?of Naval Architects of Korea, 32(1), pp.9-16.
Paeng, B., Park, I.B. and Park, J., 2021. Deep reinforcement?learning for minimizing tardiness in parallel machine?scheduling with sequence dependent family setups. IEEE?Access, 9, pp.101390-101401.
Park, J.K. and Kim, M.K., 2020. Optimization of quantity?allocation using integer linear programming in shipbuilding?industry. Journal of the Society of Naval Architects of?Korea, 57(1), pp.45-51.
Schulman, J., Wolski, F., Dhariwal, P., Radford, A. and Klimov,?O., 2017. Proximal policy optimization algorithms. arXiv?preprint arXiv:1707.06347.
Son, J.R., Suh, H.W. and Ha, B.H, 2014. A heuristic?algorithm for block storage planning in shipbuilding. Journal?of the Society of Naval Architects of Korea, 51(3),?pp.239-245.
Zhang, Z., Zheng, L., Li, N., Wang, W., Zhong, S. and Hu,?K., 2012. Minimizing mean weighted tardiness in unrelated?parallel machine scheduling with reinforcement learning.?Computers & operations research, 39(7), pp.1315-1324.
Zhang, Z., Zheng, L. and Weng, M. X., 2007. Dynamic?parallel machine scheduling with mean weighted tardiness?objective by Q-Learning. The International Journal of?Advanced Manufacturing Technology, 34(9), pp.968-980.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.