최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기터널과 지하공간: 한국암반공학회지 = Tunnel and underground space, v.33 no.4, 2023년, pp.255 - 264
As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reductio...
Cao, L., Fang, Q., Zhang, D., and Chen, T., 2018, Subway station construction using combined shield and shallow tunnelling?method : Case study of Gaojiayuan station in Beijing, Tunn. Undergr. Space Technol., 82, 627-635.
Korea National Railway(KR), 2020, Track Maintenance Guidelines.
Liu, J., Wang, F., He, S., Wang, E., and Zhou, H., 2015, Enlarging a large-diameter shield tunnel using the pile-beam-arch method?to create a metro station, Tunn. Undergr. Space Technol., 49, 130-143.
Xu, X., Li, Z., Fang, Q., and Zheng, H., et al., 2020, Challenges and countermeasures for using pile-beam-arch approach to enlarge?large-diameter shield tunnel to subway station, Tunn. Undergr. Space Technol., 98.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.