NTIS 바로가기KSCE Journal of Civil and Environmental Engineering Research = 대한토목학회논문집, v.43 no.6, 2023년, pp.841 - 849
강동욱 (성균관대학교 글로벌스마트시티융합공학과) , 조민건 (성균관대학교 글로벌스마트시티융합공학과) , 차기춘 (성균관대학교 글로벌스마트시티융합공학과) , 박승희 (성균관대학교 건설환경공학부)
Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience....
Aliramezani, M., Koch, C. R. and Shahbakhti, M. (2022).?"Modeling, diagnostics, optimization, and control of internal?combustion engines via modern machine learning techniques: A review and future directions." Progress in Energy and?Combustion Science, Elsevier, Vol. 88, 100967, https://doi.org/10.1016/j.pecs.2021.100967.
Al-Refaie, A. M., Alashwal, A. M., Abdul-Samad, Z. and Salleh,?H. (2021). "Weather and labor productivity in construction: a?literature review and taxonomy of studies." International?Journal of Productivity and Performance Management,?Emerald Publishing Limited, Vol. 70, No. 4, pp. 941-957,?https://doi.org/10.1108/IJPPM-12-2019-0577 .
Bressan, T. S., de Souza, M. K., Girelli, T. J. and Junior, F. C.?(2020). "Evaluation of machine learning methods for?lithology classification using geophysical data." Computers and?Geosciences, Elsevier, Vol. 139, 104475, https://doi.org/10.1016/j.cageo.2020.104475.
Choi, S. Y. (2020). "Comparison analysis of deaths in construction?industry in OECD countries." Construction and Economy?Research Institute of Korea (in Korean).
Christian, H., Agus, M. P. and Suhartono, D. (2016). "Single?document automatic text summarization using term frequency-inverse document frequency (TF-IDF)." ComTech: Computer,?Mathematics and Engineering Applications, Binus University,?Vol. 7, No. 4, pp. 285-294, https://doi.org/10.21512/comtech.v7i4.3746.
Chun, Y. G., Lee, G. U., Kim, Y. T. and Hyun, C. T. (2001). "A?study on the estimation standard of optimal construction?duration for reinforced concrete apartment house." Proceedings?of 2nd Korea Institute of Construction Engineering and?Management, KICEM, Seoul, Korea, pp. 531-534 (in Korean).
Clegg, S., Killen, C. P., Biesenthal, C. and Sankaran, S. (2018).?"Practices, projects and portfolios: Current research trends and?new directions." International Journal of Project Management,?Elsevier, Vol. 36, No. 5, pp. 762-772, https://doi.org/10.1016/j.ijproman.2018.03.008.
Durdyev, S. and Hosseini, M. R. (2020). "Causes of delays on?construction projects: a comprehensive list." International?Journal of Managing Projects in Business, Emerald Publishing?Limited, Vol. 13, No. 1, pp. 20-46, https://doi.org/10.1108/IJMPB-09-2018-0178.
El-Sayegh, S. M., Manjikian, S., Ibrahim, A., Abouelyousr, A.?and Jabbour, R. (2021). "Risk identification and assessment in?sustainable construction projects in the UAE." International?Journal of Construction Management, Taylor & Francis, Vol. 21,?No. 4, pp. 327-336, https://doi.org/10.1080/15623599.2018.1536963.
Glenigan (2015). UK Industry Performance Report.
Ha, S. G., Kim, T. H., Son, K. Y., Kim, J. M. and Son, S. H.?(2018). "Quantification model development of human accidents?on external construction site by applying probabilistic method."?Journal of the Korea Institute of Building Construction, KIC,?Vol. 18, No. 6, pp. 611-619, https://doi.org/10.5345/JKIBC.2018.18.6.611 (in Korean).
Islam, M. S., Nepal, M. P., Skitmore, M. and Kabir, G. (2019). "A?knowledge-based expert system to assess power plant project?cost overrun risks." Expert Systems with Applications, Elsevier,?Vol. 136, No. 1, pp. 12-32, https://doi.org/10.1016/j.eswa.2019.06.030.
Jitpaiboon, T., Smith, S. M. and Gu, Q. (2019). "Critical success?factors affecting project performance: An analysis of tools,?practices, and managerial support." Project Management?Journal, PMI, Vol. 50, No. 3, pp. 271-287, https://doi.org/10.1177/8756972819833545.
Kang, S. H., Jung, Y. S., Kim, S. R., Lee, I. H., Lee, C. W. and?Jung, J. H. (2017). "Preliminary scheduling based on historical?and experience data for airport project." Korea Institute of?Construction Engineering and Management, KICEM, Vol. 18,?No. 6, pp. 26-37, https://doi.org/10.6106/KJCEM.2017.18.6.026(in Korean).
Kim, J. S. (2022). Analysis of project delay using big data. Msc.?thesis, Hanyang University, Seoul, Korea (in Korean).
Kim, S., Chang, S. and Castro-Lacouture, D. (2020). "Dynamic?modeling for analyzing impacts of skilled labor shortage on?construction project management." Journal of Management in?Engineering, ASCE, Vol. 36, No. 1, 04019035, https://doi.org/10.1061/(ASCE)ME.1943-5479.0000720.
Koppenjan, J., Veeneman, W., van der Voort, H., ten Heuvelhof,?E. and Leijten, M. (2011). "Competing management approaches?in large engineering projects: The Dutch RandstadRail project."?International Journal of Project Management, Vol. 29, No. 6,?pp. 740-750, https://doi.org/10.1016/j.ijproman.2010.07.003.
Korea Institute of Civil engineering and building Technology?(KICT) (2020). Guidelines for ensuring adequate construction?time (in Korean).
Korea Occupational Safety and Health Agency (KOSHA) (2019).?2019 Large accident report book, pp. 9 (in Korean).
Lee, G. S. (2023). Methods to analyze the delays for extension of?time claims. Msc. thesis, Hanyang University, Seoul, Korea (in?Korean).
Li, W., Yin, Y., Quan, X. and Zhang, H. (2019). "Gene expression?value prediction based on XGBoost algorithm." Frontiers in?genetics, Frontiers, Vol. 10, 1077, https://doi.org/10.3389/fgene.2019.01077.
Mulholland, B. and Christian, J. (1999). "Risk assessment in?construction schedules." Journal of Construction Engineering?and Management, Vol. 125, No. 1, pp. 8-15, https://doi.org/10.1061/(ASCE)0733-9364(1999)125:1(8).
Natekin, A. and Knoll, A. (2013). "Gradient boosting machines, a?tutorial." Frontiers in Neurorobotics, Frontiers, Vol. 7,?https://doi.org/10.3389/fnbot.2013.00021.
Oxford Economics (2017). Global Infrastructure Outlook.
Park, G. S. (2012). A study on the estimation of an approproate?construction duration of apartment. Msc. thesis, Seoul National?University of Science and Technology (in Korean).
Park, J. H., Cho, M. G., Eom, S. H. and Park, S. K. (2023).?"Quantification of schedule delay risk of rain via text mining of?a construction log." KSCE Journal of Civil and Environmental?Engineering Research, KSCE, Vol. 43, No. 1, pp. 109-117,?https://doi.org/10.12652/Ksce.2023.43.1.0109 (in Korean).
Park, J. H., Choi, H. S., Cho, Y., Bang, K. S., Yun, S. H. and Paek,?J. H. (2010). "A study on the development of probabilistic?duration estimation module using monte carlo simulation."?Journal of the Architectural Institute of Korea Structure and?Construction, AIK, Vol. 26, No. 5, pp. 101-108 (in Korean).
Raschka, S. (2015). Python machine learning, 1st ed., Packt?publishing Ltd.
Singh, D. and Singh, B. (2020). "Investigating the impact of data?normalization on classification performance." Applied Soft?Computing, Elsevier, Vol. 97, Part B, 105524, https://doi.org/10.1016/j.asoc.2019.105524.
Wang, G., Liu, M., Cao, D. and Tan, D. (2020). "Identifying high-frequency-low-severity construction safety risks: An empirical?study based on official supervision reports in Shanghai."?Engineering, Construction and Architectural Management,?Emerald Publishing Limited, Vol. 29, No. 2, pp. 940-960,?https://doi.org/10.1108/ECAM-07-2020-0581.
Wong, T. T. and Yeh, P. Y. (2019). "Reliable accuracy estimates?from k-fold cross validation." IEEE Transactions on Knowledge?and Data Engineering, IEEE, Vol. 32, No. 8, pp. 1586-1594,?https://doi.org/10.1109/TKDE.2019.2912815.
Yang, S. W. and Lim, H. C. (2021). "Semantic network analysis?on the research trends of construction accident." Journal of the?Architectural Institute of Korea, AIK, Vol. 37, No. 6, pp.?231-236 (in Korean).
Yu, J. H. and Kim, O. K. (2021). "A case study on the prevention?of construction delays using the delay management index in?program level construction projects." Journal of the Korea?Institute of Building Construction, Vol. 21, No. 4, pp. 347-359,?https://doi.org/10.5345/JKIBC.2021.21.4.347 (in Korean).
Zhang, F., Fleyeh, H., Wang, X. and Lu, M. (2019). "Construction?site accident analysis using text mining and natural language?processing techniques." Automation in Construction, Elsevier,?Vol. 99, pp. 238-248, https://doi.org/10.1016/j.autcon.2018.12.016.?
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.