최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Design studies, v.22 no.2, 2001년, pp.157 - 167
Bashir, Hamdi A. (Department of Mechanical Engineering, McGill University, 817 Sherbrooke Street West, Montreal, Quebec, Canada) , Thomson, Vince (Department of Mechanical Engineering, McGill University, 817 Sherbrooke Street West, Montreal, Quebec, Canada)
AbstractThis paper describes an analogy-based model for estimating design effort. It is based on estimating the productivity of an upcoming project by incorporating the concept of an eigenvector to estimate the influence of various factors on productivity. The model is intuitive and does not require...
10.1111/j.1467-9310.1971.tb00091.x Norris, K P `The accuracy of project cost and duration estimates in industrial R&D' R*D Management Vol 2 No 1 (1971) pp 25-36
10.1111/1540-5885.1130236 Murmann P A `Expected development time reductions in the German mechanical engineering industry' Journal of Product Innovation Management Vol 11 (1994) pp 236-252
Thamhain, H J and Wilemon, D L `Criteria for controlling projects according to plan' Project Management Journal Vol 17 No 2 (1986) pp 75-81
Phan, D, Vogel, D and Nunamaker, J `The search for perfect project management' Computerworld (September 1988) pp 95-100
Leech, D J Management of Engineering Design John Wiley and Sons, Belgium (1972)
Putnam, L H Progress in modeling the software life cycle in a phenomenological way to obtain engineering quality estimates and dynamic control of the process Second Software Life Cycle Management Workshop, Atlanta, Georgia (August 1978) pp 105-128
Adrangi, B and Harrison, W `Effort estimation in a system development project' Journal of Systems Management Vol 38 No 8 (1987) pp 21-23
10.1016/0164-1212(88)90005-2 Cote, V, Bourque, S, Oligny, S and Rivard, N `Software metrics: an overview of recent results' The Journal of Systems and Software Vol 8, (1988) pp 121-131
10.1109/54.573364 Jacome, M F and Lapinskii, V `NREC: Risk assessment and planning of complex designs' IEEE Design and Test of Computers Vol 14 No 1 (1997) pp 42-49
10.1016/S0142-694X(00)00014-4 Bashir, H A and Thomson, V `Models for estimating design effort and time' Design Studies Vol 22 (2001) pp 141-155
Ross, B H Remindings in learning: objects and tools in Similarity, Analogy, and Thought, Vosniadou, S and Ortony, A (eds), Cambridge University Press, New York (1986)
10.1016/0950-5849(95)01045-9 Hughes, R T `Expert judgement as an estimating methods' Information and Software Technology Vol 38 No 2 (1996) pp 67-75
Gioia, J `Twelve reasons why programs fail' PM Network November (1996) pp 16-19
10.1080/095448299261317 Bashir, H A and Thomson, V `Estimating design complexity' Journal of Engineering Design Vol 10, No 3 (1999) pp 247-257
Wallace, K M and Hales, C `Detailed analysis of an engineering design project' . In W E Eder (ed) Proceedings of the 1987 International Conference on Engineering Design Vol 1, ASME, NY (1987) pp 94-101
10.1147/sj.161.0054 Walston, C E and Felix, C P `A method of programming measurement and estimation' IBM System Journal Vol 16 No 1 (1977) pp 54-73
Boehm, B W Software Engineering Economy Prentice-Hall, Inc., NJ (1981)
DeMarco, T Controlling Software Projects Yourdon Press, New York (1982)
Jeffery, D R The relationship between team size, experience, and attitudes and software development productivity COMPSAC, IEEE Computer Society Press, (1987) pp 2-8
Blessing, L T M A process-based approach to computer-supported engineering design Ph.D. Dissertation, University of Twente, Enschede, The Netherlands (1994)
10.1016/S0142-694X(98)00024-6 Bashir, H A and Thomson, V `Metrics for design projects: a review' Design Studies Vol 20 No 3 (1999) pp 263-277
Conte, S D, Dunsmore, H E and Shen, V Y Software Engineering Metrics and Models The Benjamin/Cummings Publishing Company, Menlo Park (1986)
10.1016/0270-0255(87)90492-1 Harker, P T `Alternative modes of questioning in the analytic hierarchy process' Mathematical Modelling Vol 9 No 3-5 (1987) pp 353-360
10.1016/0270-0255(87)90503-3 Harker, P T `Incomplete pairwise comparisons in the analytic hierarchy process' Mathematical Modelling Vol 9 No 11 (1987) pp 837-848
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.