Choi, Won-Seok
(Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University, Busan 49112, Korea)
,
Kim, Dong-Ham
(Autonomous & Intelligent Maritime Systems Research Division, Korea Research Institute of Ships & Ocean Engineering, Daejeon 34103, Korea)
,
Nam, Jong-Ho
(Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University, Busan 49112, Korea)
,
Kim, Min-Jun
(Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University, Busan 49112, Korea)
,
Son, Young-Bin
(Naval Architecture and Ocean Systems Engineering, Korea Maritime & Ocean University, Busan 49112, Korea)
To secure technological competitiveness in shipbuilding and offshore industries, the continuous application and development of various technologies is essential. Efficient scheduling in shipyards is an important management task, whereby materials and manpower are allocated at the appropriate time an...
To secure technological competitiveness in shipbuilding and offshore industries, the continuous application and development of various technologies is essential. Efficient scheduling in shipyards is an important management task, whereby materials and manpower are allocated at the appropriate time and to the correct workspace. Although some large shipyards ensure effective scheduling and production management through simulations employing advanced technologies, most shipbuilding industries, including small- and medium-sized shipyards, continue to use an index based on past experiences. However, this legacy index, termed the basic unit, involves poor engineering logic; therefore, it does not appropriately reflect a shipyard’s working environment, which changes rapidly in response to technological developments. Although this has led to a demand for improvements in the basic unit, a clear solution has not been presented thus far. In this study, a method for calculating the man-hours required for assembly, which is the basis for preparing the basic unit, is proposed. First, the assembly process is analyzed, and individual activities involved in the assembly process are quantified and formulated into working hours, which is defined as a production metric. Based on a ship’s computerized block model, the geometric properties and production information required for calculating the metric are generated automatically as far as possible; this is to establish a convenient production metric calculation system. The proposed method features complete applicability in new shipyards through a customization. It also serves as a tool for predicting the metric of new ships or comparisons with those of existing ships.
To secure technological competitiveness in shipbuilding and offshore industries, the continuous application and development of various technologies is essential. Efficient scheduling in shipyards is an important management task, whereby materials and manpower are allocated at the appropriate time and to the correct workspace. Although some large shipyards ensure effective scheduling and production management through simulations employing advanced technologies, most shipbuilding industries, including small- and medium-sized shipyards, continue to use an index based on past experiences. However, this legacy index, termed the basic unit, involves poor engineering logic; therefore, it does not appropriately reflect a shipyard’s working environment, which changes rapidly in response to technological developments. Although this has led to a demand for improvements in the basic unit, a clear solution has not been presented thus far. In this study, a method for calculating the man-hours required for assembly, which is the basis for preparing the basic unit, is proposed. First, the assembly process is analyzed, and individual activities involved in the assembly process are quantified and formulated into working hours, which is defined as a production metric. Based on a ship’s computerized block model, the geometric properties and production information required for calculating the metric are generated automatically as far as possible; this is to establish a convenient production metric calculation system. The proposed method features complete applicability in new shipyards through a customization. It also serves as a tool for predicting the metric of new ships or comparisons with those of existing ships.
참고문헌 (17)
Nam Construction of standardised data structure for simulation of mid-term scheduling of shipbuilding process Int. J. Comput. Integr. Manuf. 2016 10.1080/0951192X.2015.1066031 29 424
Kim A model for a simulation-based shipbuilding system in a shipyard manufacturing process Int. J. Comput. Integr. Manuf. 2005 10.1080/09511920500064789 18 427
Lee Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards Int. J. Adv. Manuf. Technol. 2013 10.1007/s00170-013-5498-4 71 621
Jeong A shipyard simulation system using the process-centric simulation modeling methodology: Case study of the simulation model for the shipyard master plan validation Trans. Soc. CAD/CAM Eng. 2016 21 204
Jeong, Y., Woo, J., Lee, P., Kim, Y., Min, Y., Shin, J., Lee, Y., and Ryu, C. (2018, January 14-16). Shipyard DES Simulation Framework and its Applications. Proceedings of the Computer Application and Information Technology, Pavone, Italy.
Song A simulation-based capacity analysis of a block-assembly process in ship production planning J. Soc. Nav. Arch. Korea 2009 10.3744/SNAK.2009.46.1.078 46 78
Kwon A Study on the Work-time Estimation for block erections using stacking ensemble learning J. Soc. Nav. Arch. Korea 2019 10.3744/SNAK.2019.56.6.488 56 488
Lee Estimation of welding material quantity for shipbuilding at early design stage based on three-dimensional geometric information J. Soc. Nav. Arch. Korea 2017 10.3744/SNAK.2017.54.1.57 54 57
Back A study for production simulation model generation system based on data model at a shipyard Int. J. Nav. Arch. Ocean Eng. 2016 10.1016/j.ijnaoe.2016.05.005 8 496