AbstractDigitalisation in the construction industry has been progressing continuously and bringing major changes for everyone involved in virtually all areas. Austrian Federal Railways ÖBB has been pushing BIM (Building Information Modelling) for the construction and rehabilitation of their inf...
AbstractDigitalisation in the construction industry has been progressing continuously and bringing major changes for everyone involved in virtually all areas. Austrian Federal Railways ÖBB has been pushing BIM (Building Information Modelling) for the construction and rehabilitation of their infrastructure. By means of various pilot projects, the basics and the processes required for design and construction are developed and applied with a strong focus on system operation. For Granitztal tunnel and a total length of ≈6.1 km, the as‐built design of the civil structures is done with an element‐based, open BIM model. As part of the handover to the maintenance and operation division, the data of civil structures relevant for operation are derived from the BIM model, validated by means of automatic methods and transferred to the facility management system (AVS, Anlagen‐Verzeichnis‐System). In the absence of an IFC (Industry Foundation Class) structure tunnel, a semantic and spatial data structure is developed. Furthermore, the model will be enriched with components of railway equipment. On the other hand, there is the over‐100‐year‐old Karawanks tunnel as part of the railway section between Villach and Jesenice. The line has been in operation since 1906 and includes the ≈8 km‐long, single‐tube Karawanks tunnel. The current situation of the tunnel including the superstructure and technical equipment no longer meets performance, safety and durability requirements and is being rehabilitated within an international cooperation project between Austria and Slovenia. The focus in this BIM project is set on the as‐built design and merging data of the existing historic tunnel structure with information of new components implemented during refurbishment. A core task is the structured transfer of data contained in the BIM model to the facility/asset management system of ÖBB (AVS) and the Slovenian infrastructure operator. The case histories of Granitztal tunnel and Karawanks tunnel are used to describe the implementation of BIM, including the development of required data structures, validation mechanisms and data delivery to the asset management.
AbstractDigitalisation in the construction industry has been progressing continuously and bringing major changes for everyone involved in virtually all areas. Austrian Federal Railways ÖBB has been pushing BIM (Building Information Modelling) for the construction and rehabilitation of their infrastructure. By means of various pilot projects, the basics and the processes required for design and construction are developed and applied with a strong focus on system operation. For Granitztal tunnel and a total length of ≈6.1 km, the as‐built design of the civil structures is done with an element‐based, open BIM model. As part of the handover to the maintenance and operation division, the data of civil structures relevant for operation are derived from the BIM model, validated by means of automatic methods and transferred to the facility management system (AVS, Anlagen‐Verzeichnis‐System). In the absence of an IFC (Industry Foundation Class) structure tunnel, a semantic and spatial data structure is developed. Furthermore, the model will be enriched with components of railway equipment. On the other hand, there is the over‐100‐year‐old Karawanks tunnel as part of the railway section between Villach and Jesenice. The line has been in operation since 1906 and includes the ≈8 km‐long, single‐tube Karawanks tunnel. The current situation of the tunnel including the superstructure and technical equipment no longer meets performance, safety and durability requirements and is being rehabilitated within an international cooperation project between Austria and Slovenia. The focus in this BIM project is set on the as‐built design and merging data of the existing historic tunnel structure with information of new components implemented during refurbishment. A core task is the structured transfer of data contained in the BIM model to the facility/asset management system of ÖBB (AVS) and the Slovenian infrastructure operator. The case histories of Granitztal tunnel and Karawanks tunnel are used to describe the implementation of BIM, including the development of required data structures, validation mechanisms and data delivery to the asset management.
참고문헌 (8)
AEC3 Deutschland GmbH. BIMQ - Intelligent information management of BIM projects[online].Munich:AEC3.https://www.bimq.de(accessed: June 2021).
Exinger, Christoph, Mulitzer, Günther, Felsner, Rudolf, Lemmerer, Johann, Matt, Robert, Griesser, Ewald.
BIM pilot project Granitztal tunnel chain - Development of data structures for tunnel structure and track superstructure : BIM‐Pilotprojekt Tunnelkette Granitztal - Entwicklung von Datenstrukturen für den Tunnelrohbau und Oberbau.
Geomechanik und Tunnelbau,
vol.11,
no.4,
348-356.
buildingSMART International (2021).openBIM[online].buildingSMART International.Camebridge.https://www.buildingsmart.org/about/openbim/(accessed: September 2021)
buildingSMART International (2021).Industry Foundation classed (IFC)[online].buildingSMART International.Camebridge.https://www.buildingsmart.org/standards/bsi‐standards/industry‐foundation‐classes/(accessed: September 9 2021).
buildingSMART International (2021).IFC2x Edition 3[online].buildingSMART International.Camebridge.https://standards.buildingsmart.org/IFC/RELEASE/IFC2x3/FINAL/HTML/(accessed: September 2021).
buildingSMART International (2021).Room Activities - IFC Tunnel[online].buildingSMART International.Camebridge.https://www.buildingsmart.org/resources/room‐activities/(accessed: September 2021).
Solibri Inc. (2021).Solibri Office[online].Helsinki:Solibri.https://www.buildingsmart.org/resources/room‐activities/(accessed: September 2021).
DAUB (2020).Digital Design Building and Operation of Underground structures - Model requirements - Part 1.Cologne:DAUB.
이 논문을 인용한 문헌
활용도 분석정보
상세보기
다운로드
내보내기
활용도 Top5 논문
해당 논문의 주제분야에서 활용도가 높은 상위 5개 콘텐츠를 보여줍니다. 더보기 버튼을 클릭하시면 더 많은 관련자료를 살펴볼 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.