최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기IEEE industry applications magazine, v.12 no.5, 2006년, pp.22 - 27
Trenholm, B. (Petro-Canada, St. John's, Nfld.)
This article examines the lessons learned in development and operation of the first disconnectable floating production storage and offloading (FPSO) offshore oil platform to be built for the North Atlantic. To assist in organizing the lessons learned into a framework that applies to other projects, ...
Inspection and Maintenance of Electrical Installations in Hazardous Areas (Other Than Mines) 2002
Specification for Degrees of Protection Provided by Enclosures (IP Code) 1992
Rules and Regulations for the Classification of a Floating Offshore Installation at a Fixed Location 1999
Ship Electrical Standards 2002
IEEE Standard for the Testing Design Installation and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications 1997
Recommended Practice for Design and Installation of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I Division 1 and Division 2 Locations 1999
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.