최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Construction innovation : information process management, v.15 no.1, 2015년, pp.2 - 6
Wang, Xiangyu (School of Built Environment,Curtin University, Perth,Australia) , Chong, Heap-Yih (School of Built Environment, Curtin University, Perth, Australia.)
Purpose – The purpose of this paper is to set new trends of integrated Building Information Modelling (BIM) for the construction industry. BIM has been accepted by construction to some extent as an innovative approach/technology to improve project performance in the aspects of productivity, e...
10.1108/02630800810887108 Arayici, Y. (2008), “Towards building information modelling for existing structures”, Structural Survey , Vol. 26 No. 3, pp. 210-222.
10.1016/j.autcon.2010.09.016 Arayici, Y. , Coates, P. , Koskela, L. , Kagioglou, M. , Usher, C. and O’Reilly, K. (2011), “Technology adoption in the BIM implementation for lean architectural”, Automation in Construction , Vol. 20 No. 2, pp. 189-195.
10.1016/j.autcon.2014.03.028 Bosche, F. and Guenet, E. (2014), “Automating surface flatness control using terrestrial laser scanning and building information models”, Automation in Construction , Vol. 44, pp. 212-226.
10.1108/02635571111182782 Chong, H.Y. , Balamuralithara, B. and Chong, S.C. (2011), “Construction contract administration in Malaysia using DFD: a conceptual model”, Industrial Management & Data Systems , Vol. 111 No. 9, pp. 1449-1464.
10.1016/j.autcon.2012.10.007 Chong, H.Y. and Phuah, T.H. (2013), “Incorporation of database approach into contractual issues: methodology and practical guide for organizations”, Automation in Construction , Vol. 31 No. 1, pp. 149-157.
10.1016/j.autcon.2014.04.010 Chong, H.Y. , Wong, J.S. and Wang, X. (2014a), “An explanatory case study on cloud computing applications in the built environment”, Automation in Construction , Vol. 44, pp. 152-162.
10.1007/978-3-319-10831-5_6 Chong, H.Y. , Wang, J. , Shou, W. , Wang, X. and Guo, J. (2014b), “Improving quality and performance of facility management using building information modelling”, Cooperative Design, Visualization, and Engineering, LNCS 8683, Washington, DC, pp. 44-50.
10.1061/(ASCE)CO.1943-7862.0000642 Chong, H.Y. , Zin, R.M. and Chong, S.C. (2013), “Employing data warehousing for contract administration: e-dispute resolution prototype”, Journal of Construction Engineering and Management , Vol. 139 No. 6, pp. 611-619.
10.1016/j.compind.2013.12.003 u?-Babi, N. , Rebolj, D. , Nekrep-Perc, M. and Podbreznik, P. (2014), “Supply-chain transparency within industrialized construction projects”, Computers in Industry , Vol. 65 No. 2, pp. 345-353.
10.18848/2325-128X/CGP/v06i02/38413 Forgues, D. and Becerik-Gerber, B. (2013), “Integrated project delivery and building information modeling: redefining the relationship between education and practice”, International Journal of Design Education , Vol. 6 No. 2, pp. 47-56.
Hou, L. , Wang, X. , Wang, J. and Truijens, M. (2014a), “An integration framework of advanced technologies for productivity improvement for LNG mega-projects”, Journal of Information Technology in Construction , Vol. 19, pp. 360-382.
10.1109/JPROC.2013.2295327 Hou, L. , Wang, Y. , Wang, X. , Maynard, N. , Cameron, I.T. , Zhang, S. and Maynard, Y. (2014b), “Combining photogrammetry and augmented reality towards an integrated facility management system for the oil industry”, Proceedings of the IEEE , Vol. 102 No. 2, pp. 204-220.
10.1016/j.autcon.2012.09.010 Park, X. , Lee, C. , Kwon, D. and Wang, X. (2013), “A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template”, Automation in Construction , Vol. 33, pp. 61-71.
10.1108/CI-02-2013-0006 Singh, V. (2014), “BIM and systemic ICT innovation in AEC: perceived needs and actor’s degrees of freedom”, Construction Innovation , Vol. 14 No. 3, pp. 292-306.
10.1007/s10846-014-0116-8 Wang, J. , Sun, W. , Shou, W. , Wang, X. , Wu, C. , Chong, H.Y. , Liu, Y. and Sun, C. (2014a), “Integrating BIM and LiDAR for real-time construction quality control”, Journal of Intelligent & Robotic Systems .
10.5772/5677 Wang, X. (2007), “Using augmented reality to plan virtual construction worksite”, International Journal of Advanced Robotic Systems , Vol. 4 No. 4, pp. 501-512.
10.1260/147807709788921985 Wang, X. (2009), “Augmented reality in architecture and design: potentials and challenges for application”, International Journal of Architectural Computing , Vol. 7 No. 2, pp. 309-326.
Wang, X. , Gu, N. and Marchant, D. (2008), “An empirical case study on designer’s perceptions of augmented reality within an architectural firm”, IT Consulting , Vol. 13, pp. 536-552.
10.1016/j.autcon.2012.10.012 Wang, X. , Love, P.E.D. , Kim, M.J. , Park, C.S. , Sing, C.P. and Hou, L. (2013a), “A conceptual framework for integrating building information modeling with augmented reality”, Automation in Construction , Vol. 34, pp. 37-44.
10.1016/j.autcon.2013.12.003 Wang, X. , Truijens, M. , Hou, L. , Wang, Y. and Zhou, Y. (2014b), “Integrating augmented reality with building information modeling: onsite construction process controlling for liquefied natural gas industry”, Automation in Construction , Vol. 40 No. 7, pp. 96-105.
10.1155/2013/189105 Wang, Y. , Wang, X. , Wang, J. , Yung, P. and Jun, G. (2013b), “Engagement of facilities management in design stage through BIM: framework and a case study”, Advances in Civil Engineering , Vol. 29 Nos 5/6.
Wong, J. , Wang, X. , Li, H. , Chan, G. and Li, H. (2014), “A review of cloud-based BIM technology in the construction sector”, IT Consulting , Vol. 19, pp. 281-291.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.