최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기Procedia engineering, v.180, 2017년, pp.190 - 201
Jupp, Julie
Abstract For more than a decade research has shown that 4D Building Information Modelling (BIM) can improve construction planning, scheduling and production control as well as the onsite management of safety, workspaces and waste. The increasing use of 4D BIM in construction highlights opportunitie...
D. Simon, The Value of Green Star - A decade of environmental benefits , developed by Green Building Council of Australia, 2013 [on-line] Available at: <http://www.gbca.org.au/../The_Value_of_Green_Star_A_Dec.
J.P. Russell-Smith, C. Yates, J. Evans, C.M. Meyer, A.C. Edwards, Application of a lower rainfall savanna burning emissions abatement methodology. Carbon Accounting and Savanna Fire Management (2015): 219.
Standards Australia 2004, Australian/New Zealand Standard AS/NZS ISO 14001:2004 Environmental management systems - requirements with guidance for use, 3rd edn, Standards Australia, Sydney.
Journal of Architectural Engineering. Guggemos 12 4 187 2006 10.1061/(ASCE)1076-0431(2006)12:4(187) Decision-support tool for assessing the environmental effects of constructing commercial buildings
10.1016/j.autcon.2012.05.006 S. Zhang, J. Teizer, J.K. Lee, C.M. Eastman, M. Venugopal, Building information modelling (BIM) and safety: Automatic safety checking of construction models and schedules. Automation in Construction, 2013; 29: 183-195. Elsevier. .
10.1061/(ASCE)0733-9364(2000)126:4(251) B. Koo, M. Fischer, Feasibility study of 4D CAD in commercial construction. Journal of const. eng. & manage. 2000 Jul;126 (4): 251-60.
R. Buchmann-Slorup, N. Andersson, BIM-based scheduling of Construction - A comparative analysis of prevailing and BIM-based scheduling processes. In Proc., 27th Int. Conf. of the CIB W78; 2010. pp. 113-123.
L. Rischmoller, L.F. Alarcon, 4D-PS: Putting an IT new work process into effect. In Proc. of CIB W78 Conference on Construction Information Technology, 2002, Jun 12; Vol. 1, pp. 109-14.
D. Heesom, L. Mahdjoubi, A dynamic 4D simulation system for construction space planning. In Proc. of 3rd International Conference on Decision Making in Urban and Civil Engineering, London, 2002 Nov, pp. 6-8.
B.J. Gleeson, D.J. Greenwood, Surveying the extent and use of 4D BIM in the UK, ITcon, 21 (2016): 57-71.
10.1108/09699980910988357 N. Dawood, S. Sikka, Development of 4D-based performance indicators in construction industry, Engineering, construction and architectural management, 16.5 (2009): 438-458.
10.1061/(ASCE)0733-9364(2002)128:4(306) B. Akinci, M. Fischer, J. Kunz, Automated generation of work spaces required by construction activities, Working Paper No. 58, Center for Integrated Facility Engineering, 2002, Stanford Univ., Stanford, CA.
10.1061/(ASCE)0733-9364(2002)128:4(296) B. Akinci, M. Fischer, J. Kunz, R. Levitt, Representing work spaces generically in construction method models, Journal of construction engineering and management, 2002 Aug; 128(4): 296-305.
10.1061/(ASCE)0887-3801(2002)16:2(124) B. Akinci, M. Fischer, R. Levitt, R. Carlson, Formalization and automation of time-space conflict analysis. Journal of Computing in Civil Engineering, 2002; 16(2): 124-134.
10.1061/(ASCE)0733-9364(2002)128:4(287) S-J. Guo, Identification and resolution of work space conflicts in building construction. Journal of construction engineering and management, 2002; 128(4): 287-295.
10.1061/(ASCE)0733-9364(2004)130:4(598) K.W. Chau, M. Anson, J.P. Zhang, Four-dimensional visualization of construction scheduling and site utilization. Journal of construction engineering and management, 2004 Aug; 130(4): 598-606.
N. Dawood, Z. Mallasi, Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies, Computer-Aided Civil and Infrastructure Engineering, 2006; 21 (7): 498-513.
R. Chavada, N. Dawood, M. Kassem, Construction workspace management: The development and application of a novel nD planning approach and tool. Journal of Information Technology in Construction, 2012 Sep; 17, 213-236.
10.1061/(ASCE)CO.1943-7862.0000885 B. Choi, H.S. Lee, M. Park, Y.K. Cho, H. Kim, Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management. 2014 May 28; 140(9): 1-13.
K. Sulankivi, K. Kahkonen, T. Makela, M. Kiviniemi, 4D-BIM for construction safety planning. In W099-Special Track 18th CIB World Building Congress, Salford, United Kingdom, 2010, pp. 117.
10.1016/j.ssci.2009.09.009 V. Benjaoran, S. Bhokha, An integrated safety management with construction management using 4D CAD model. Safety Science. 2010 Mar 31; 48(3): 395-403.
M. Kiviniemi, K. Sulankivi, K. Kahkonen, T. Makela, M.L. Merivirta, BIM-based Safety Management and Communication for Building Construction, 2011, VTT Technical Research Centre of Finland.
10.1016/j.autcon.2012.10.013 H.L. Guo, H. Li, V. Li, VP-based safety management in large-scale construction projects: A conceptual framework. Automation in Construction, 2013, Sep 30; 34:16-24. Elsevier.
10.1016/j.autcon.2012.10.011 Y., Zhou, L.Y. Ding, L.J. Chen, Application of 4D visualization technology for safety management in metro construction. Automation in Construction. 2013, Sep 30; 34:25-36. Elsevier.
K. Hewage, A. Porwal, Sustainable construction: an information modelling approach for waste reduction. In International Conference on Building Resilience, 2011, Kandalama, Sri Lanka. .
10.1016/j.autcon.2015.07.020 Z. Liu, M. Osmani, P. Demian, A. Baldwin, A BIM-aided construction waste minimisation framework. Automation in Construction, 2015 Nov 30;59:1-23. .
J.C. Cheng, J. Won, M. Das, Construction and demolition waste management using BIM technology. In International Group for Lean Construction Conference (IGLC), 2015, Perth, Australia.
European Union Regulation (EC) No. 761/2001 of the European Parliament and of the Council of 19 March 2001 allowing voluntary particpation by organizations in a community eco-manaagmeent and audit scheme (EMAS).
10.1016/j.buildenv.2006.10.035 V.W. Tam, L.Y. Shen, R. Yau, C.M. Tam, On using a communication-mapping model for environmental management to improve environmental performance in project development processes. Building and Environment, 2007; 42(8), 3093-3107.
10.1016/j.buildenv.2008.05.001 M. Gangolells, M. Casals, S. Gasso, N. Forcada, X. Roca, A. Fuertes, A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings. Building and Environment. 2009, Mar 31; 44(3):558-71.
10.1080/014461999371655 A.N. Baldwin, S.A. Austin, T.M. Hassan, A. Thorpe, Modeling information flow during the conceptual and schemicatic stages of building design. Construction Management and Economics 1999;17: 155-67.
10.1016/j.buildenv.2009.07.012 D.Z. Li, E.C.M. Hui, B.Y.P. Leung, Q.M. Li, X. Xu, A methodology for ecoefficiency evaluation of residential development at city level. Building and Environment, 2010; 45 (3), 566-573.
10.1080/0961321032000132124 C.M. Tam, V.W. Tam, S.X. Zeng, Environmental performance assessment in China and Hong Kong. Building Research & Information, 2004 Mar 1; 32(2): 110-8.
10.1016/j.autcon.2004.08.017 L.Y. Shen, W.S. Lu, H. Yao, D.H. Wu, A computer-based scoring method for measuring the environmental performance of construction activities. Automation in Construction, 2005 Jun 30; 14(3): 297-309.
10.1080/09613210600766328 Y. Liu, D. Prasad, J. Li, Y. Fu, J. Liu, Developing regionally specific environmental building tools for China. Building Research & Information, 2006 Jul 1; 34(4): 372-86.
10.1016/j.jclepro.2013.02.005 A. Fuertes, M. Casals, M. Gangolells, N. Forcada, M. Macarulla, X. Roca, An environmental impact causal model for improving the environmental performance of construction processes. Journal of cleaner production. 2013 Aug 1; 52: 425-37.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
오픈액세스 학술지에 출판된 논문
※ AI-Helper는 부적절한 답변을 할 수 있습니다.