최소 단어 이상 선택하여야 합니다.
최대 10 단어까지만 선택 가능합니다.
다음과 같은 기능을 한번의 로그인으로 사용 할 수 있습니다.
NTIS 바로가기International journal of 3-D information modeling, v.4 no.1, 2015년, pp.54 - 70
Patlakas, Panagiotis , Menendez, Jesus , Hairstans, Robert
초록이 없습니다.
American Institute of Architects. (2007). Integrated Project Delivery: A Guide. Retrieved June 4, 2014, from http://info.aia.org/siteobjects/files/ipd_guide_2007.pdf
Autodesk (2014a). Timber Framing for Autodesk Revit 2014. Retrieved June 4, 2014, from http://www.autodesk.com/solutions/building-information-modeling/overview
Autodesk (2014b). BIM: Building Information Modeling. Retrieved June 4, 2014, from http://www.autodesk.com/solutions/building-information-modeling/overview
AzharS.BrownJ.FarooquiR. (2009, April). BIM-based sustainability analysis: An evaluation of building performance analysis software. In Proceedings of the 45th ASC Annual Conference (pp. 1-4).
British Research Establishment (2003). Multi-storey timber frame buildings: A design guide (BRE Report 454), Watford: BREPress.
Cabinet Office. (2011). Government Construction Strategy. London: Cabinet Office.
CIOB. (2008). Skills Shortages in the UK Construction Industry. Berkshire: Chartered Institute of Building.
CrawfordD.HairstansR.SmithR. (2013). Feasibility of Cross-Laminated Timber Production from UK Sitka spruce. In Proceedings of the COST Action FP1004 Solid Timber Conference.
EganJ. (1998). Rethinking construction. London: Department of the Environment, Transport and the Regions.
GouldingJ.ArifM. (2013). Offsite Production and Manufacturing – Research Roadmap Report. CIB Publication 372. Rotterdam: CIB General Secretariat.
Goulding, J., Rahimian, F., Arif, M., & Sharp, M. (2012). Offsite Construction: Strategic Priorities for Shaping the Future Research Agenda. Architectoni.ca, 1, 62-73.
Goulding, J., Rahimian, F., Arif, M., & Sharp, M. D. (2014). New offsite production and business models in construction: priorities for the future research agenda. Architectural Engineering and Design Management, 1 - 22.
GranthamR.EnjilyV. (2004). UK design guidance for multi-storey timber frame buildings. In Proceedings of the 8th World Conference on Timber Engineering(1), 19-23.
HairstansR. (2010). Off-site and modern methods of timber construction: a sustainable approach. High Wycombe: TRADA Technology Ltd.
HiranoH.BodekN. (1995). 5 Pillars of the Visual Workplace: The Sourcebook for 5S Implementation. Tokyo: Productivity Press.
HubersJ. C. (2010). IFC based BIM or parametric design? In Proc., Int. Conf. on Computing in Civil and Building Engineering (ICCCBE), Nottingham: Nottingham University Press.
Katranuschkov, P., Weise, M., Windisch, R., Fuchs, & Scherer, R.J. (2010). BIM-based generation of multi-model views. CIB W78 2010.
KrygielE.NiesB. (2008). Green BIM: successful sustainable design with building information modeling. Indianapolis, Indiana: John Wiley & Sons.
MarasiniR.PatlakasP. (2012). Is there a business case for small to medium enterprises (SMES) to use building information modelling? In 1st UK Academic conference on BIM: Conference Proceedings, 211-221.
MenendezJ. M.LeitchK.HairstansR. (2014). Sole Plate Fixing Details for Modern Methods of Timber Construction. In Materials and Joints in Timber Structures (pp. 109–118). Springer Netherlands. 10.1007/978-94-007-7811-5_10
MTW. (2012) Timber Frame Construction Market Research and Analysis UK 2012, MTW Research 1st Edition April 2012.
Nadim, W., & Goulding, J. S. (2010). Offsite production in the UK: the way forward? A UK construction industry perspective. Construction Innovation: Information, Process, Management, 10(2).
National Audit Office. (2005). Using modern methods of construction to build homes quickly and efficiently. London: NAO Information Centre.
PorteousJ.KermaniA. (2013). Structural Timber Design to Eurocode 5. Chichester: John Wiley & Sons.
RacherP. (1995). Moment resisting connections. In BlassH. J. (Eds.), Timber Engineering: STEP 1. Almere: Centroum Hout.
RossK.CartwrightP.NovakovicO. (2006). A guide to modern methods of construction. IHS BRE Press.
SmithR. E. (2011). Prefab architecture: A guide to modular design and construction. Hoboken, NJ: Wiley.
Sulankivi, K., Kähkönen, K., Mäkelä, T., & Kiviniemi, M. (2010). 4D-BIM for construction safety planning. In W099-Special Track 18th CIB World Building Congress May 2010 Salford, United Kingdom (p. 117).
Taylor, M. P. (2010). A definition and valuation of the UK offsite construction sector. Construction Management and Economics. 28(8), 885-886.Neufert, E. & Neufert, P. (2012). Architects' data. Chichester: John Wiley & Sons.
UKCES. (2013). Technology and Skills in the Construction Industry (Evidence Report 74). London: UKCES.
*원문 PDF 파일 및 링크정보가 존재하지 않을 경우 KISTI DDS 시스템에서 제공하는 원문복사서비스를 사용할 수 있습니다.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.