IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
US-0735177
(2003-12-12)
|
등록번호 |
US-7451908
(2008-11-18)
|
우선권정보 |
IT-MI2002A2630(2002-12-12) |
발명자
/ 주소 |
|
출원인 / 주소 |
|
대리인 / 주소 |
|
인용정보 |
피인용 횟수 :
2 인용 특허 :
13 |
초록
▼
A furnace brazing process for metal parts of which at least one part is tubular, includes positioning of the filler metal, preferably as a pre-formed member inside said tubular part, and successive reheating inside the furnace to induce the melting of the filler metal and the accomplishment of the j
A furnace brazing process for metal parts of which at least one part is tubular, includes positioning of the filler metal, preferably as a pre-formed member inside said tubular part, and successive reheating inside the furnace to induce the melting of the filler metal and the accomplishment of the joint. The process is particularly suited to the construction of towel-rack type radiators.
대표청구항
▼
The invention claimed is: 1. A brazing process to join two metal parts (1, 11), said metal parts including a stopper (11) and a tubular manifold (1) having an end with an opening, wherein said stopper is brazed to close the open end (12) of said tubular manifold (1), said stopper having an internal
The invention claimed is: 1. A brazing process to join two metal parts (1, 11), said metal parts including a stopper (11) and a tubular manifold (1) having an end with an opening, wherein said stopper is brazed to close the open end (12) of said tubular manifold (1), said stopper having an internal face (15) provided with a housing (19) formed in the external edge (13) of the stopper and surrounding the internal face (15), the housing configured to receive a filler metal (18), said process comprising: positioning a portion of filler metal (18) on the stopper in housing (19); fixedly aligning the metal parts to be joined, wherein said internal face (15) and the filler metal (18) are both positioned inside said tubular manifold (1) prior to melting; and heating said metal parts (1, 11) to a temperature at which the filler metal (18) melts and is contained entirely within the tubular manifold, thereby forming a bond between the stopper and the internal surface of the adjacent manifold. 2. The process according to claim 1, wherein said positioning of a filler metal (18) includes holding the filler metal (18) in proximity to the junction to be brazed by a plurality of projections (20) formed on the internal face (15) proximate the edge (13) of the housing (19) of the stopper. 3. The process according to claim 1, wherein a portion of the housing (19) includes a step (14) that is inserted in said tubular manifold, wherein said step (14) forms a junction that is in contact with an internal surface (17) of the manifold to be brazed. 4. The process according to claim 1 wherein, the metal parts to be joined are parts of a towel-rack radiator. 5. A brazing process to join two metal parts, said metal parts including (i) a tube (3) having an end (4) and (ii) a tubular metal part (1) delimiting an internal cavity and having a lateral wall (2) with an inner wall surface, a hole in the lateral wall (2) communicating with said internal cavity, said hole configured to receive the end (4) of tube (3) in close-fitting relation, a brazing filler metal in the form of a preformed metal wire ring (6) being positioned around the end of said tube (3) in a groove (17) formed in the tube, the process comprising the steps of: fixedly aligning the metal parts to be joined with the portion of the metal tube (3) with said filler metal (6) positioned within said internal cavity of tubular metal part (1) and proximate the inner wall surface, prior to melting; heating said metal parts to a temperature at which the filler metal melts, whereby a brazed joint is formed between the two metal parts. 6. The process according to claim 5, wherein said heating step is carried out in a furnace. 7. The process according to claim 5, wherein a coating (5) of filler metal is applied to, or deposited around the end of said tube and the end of the tube is then inserted into said hole. 8. The process according to claim 5, wherein the end of said tube is tapered. 9. The process according to claim 5, wherein the end of said tube is inserted into said hole so as to protrude into the inside of said tubular part a distance of from 1 to 3 mm. 10. A brazing process to join two metal parts, said metal parts including (i) a tube (3) having an end (4) and (ii) a tubular metal part (1) delimiting an internal cavity, the tubular metal part having a lateral wall (2) with an inner wall surface, at least one hole in the lateral wall (2) communicating with said internal cavity configured to receive the end (4) of tube (3) in close-fitting relation, the process comprising the steps of: positioning a brazing filler metal (5,6) on the end (4) of said tube (3); fixedly aligning the metal parts to be joined with the portion of the metal tube (3) with said filler metal positioned within said internal cavity proximate the inner wall surface of tubular member (1) prior to melting; reconfiguring the shape of the end of the metal tube (3) after it has been inserted into the hole; heating said metal parts to a temperature at which the filler metal melts, whereby the two metal parts are joined by a brazed joint formed between the two metal parts.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.