A concrete structure for replenishing an aquifer and a method for constructing the same is provided. The structure is comprised of a pavement layer with surface drains that extend through the pavement layer and into an aggregate leach field. The leach field includes leach lines spanning the leach fi
A concrete structure for replenishing an aquifer and a method for constructing the same is provided. The structure is comprised of a pavement layer with surface drains that extend through the pavement layer and into an aggregate leach field. The leach field includes leach lines spanning the leach field. An aggregate drain extends from the leach field into a sand lens. Precipitation which falls upon the structure thus flows through the surface drain, absorbed into the aggregate leach field, and transported to the aggregate drains by way of aggregate leach lines. The water is then absorbed into the sand lens, ultimately replenishing the aquifer. Existing conventional pavement structures are retrofitted by the removal of a section of the pavement, and filling the same with porous concrete.
대표청구항▼
What is claimed is: 1. A gutter formation method for enhancing the natural replenishment of an aquifer under a pavement layer, the pavement layer being dispose adjacent an elevated curb, said pavement layer and elevated curb being situated above a soil section having an upper surface and a lower su
What is claimed is: 1. A gutter formation method for enhancing the natural replenishment of an aquifer under a pavement layer, the pavement layer being dispose adjacent an elevated curb, said pavement layer and elevated curb being situated above a soil section having an upper surface and a lower surface adjacent the aquifer, the method comprising the steps of: forming a gutter section between said elevated curb and said pavement layer; forming a hole in said gutter section, the hole being disposed between said elevated curb and said pavement layer, the hole extending through the soil section to be in fluid communication with said aquifer; filling said hole with rocks; filling said gutter section with porous concrete, the porous concrete being configured to allow fluid to pass therethrough, the porous concrete defining a lower surface being disposed adjacent the hole to allow fluid to pass through the porous concrete and into the hole to replenish the aquifer; and curing said porous concrete. 2. The gutter formation method as set forth in claim 1, further comprising the step of removing a section of said pavement layer adjacent to elevated curb prior to forming the hole. 3. The gutter formation method as set forth in claim 1, further including the step of forming a first cut off wall extending downwards from said pavement layer and offset from said elevated curb. 4. The gutter formation method as set forth in claim 3, wherein the step of forming a gutter section further includes forming a second cut off wall extending downwards from said elevated curb section and laterally supporting said gutter section. 5. The gutter formation method as set forth in claim 4, wherein said first and second vertical cut off walls are angled inward in relation to said gutter section to direct water into said aquifer. 6. The gutter formation method as set forth in claim 1, further including the step of forming an aggregate base between the porous concrete and the hole. 7. The gutter formation method as set forth in claim 6 wherein said aggregate base includes a plurality of aggregates, each aggregate having a diameter up to ¾ inch. 8. The gutter formation method as set forth in claim 7, further including the step of compacting said aggregate base. 9. The gutter formation method as set forth in claim 1, wherein the step of forming the hole in said gutter section includes boring the hole through the soil section. 10. A gutter formation method for enhancing the natural replenishment of an aquifer under a pavement layer, the pavement layer being dispose adjacent an elevated curb, said pavement layer and elevated curb being situated above a soil section having an upper surface and a lower surface adjacent the aquifer, the method comprising the steps of: forming a gutter section between said elevated curb and said pavement layer; forming a hole in said gutter section, the hole being disposed between said elevated curb and said pavement layer, the hole extending from the upper surface of the soil section to the lower surface of the soil section, the hole being in fluid communication with said aquifer; and filling said gutter section with porous concrete, the porous concrete being configured to allow fluid to pass therethrough, the porous concrete defining a lower surface being disposed adjacent the hole to allow fluid to pass through the porous concrete and into the hole to replenish the aquifer. 11. The gutter formation method as set forth in claim 10, further comprising the step of filling said hole with rocks. 12. The gutter formation method as set forth in claim 10, further comprising the step of curing said porous concrete. 13. The gutter formation method as set forth in claim 10, further comprising the step of removing a section of said pavement layer adjacent to elevated curb prior to forming the hole. 14. The gutter formation method as set forth in claim 10, further including the step of forming a first cut off wall extending downwards from said pavement layer and offset from said elevated curb. 15. The gutter formation method as set forth in claim 14, wherein the step of forming a gutter section further includes forming a second cut off wall extending downwards from said elevated curb section and laterally supporting said gutter section. 16. The gutter formation method as set forth in claim 15, wherein said first and second vertical cut off walls are angled inward in relation to said gutter section to direct water into said aquifer. 17. The gutter formation method as set forth in claim 10, further including the step of forming an aggregate base between the porous concrete and the hole. 18. The gutter formation method as set forth in claim 17, wherein said aggregate base includes a plurality of aggregates, each aggregate having a diameter up to ¾ inch. 19. The gutter formation method as set forth in claim 18, further including the step of compacting said aggregate base. 20. The gutter formation method as set forth in claim 10, wherein the step of forming the hole in said gutter section includes boring the hole through the soil section.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (20)
Mark D. Ankeny ; James A. Kelsey, Apparatus and method for beneficial use or handling of run-off or collected water.
Medico ; Jr. John J. ; Medico Christine Meoli ; Medico Peter J. ; Medico ; III John C., Environmental porous pavement construction, and method for manufacturing pavement construction.
Medico ; Jr. John J. ; Medico Christine Meoli ; Medico Peter J. ; Medico ; III John C., Environmental porous paving material and pavement construction, environmental porous pavement mixing machine for mixing environmental porous pavement and methods for manufacturing porous material and.
Almond Daniel R. (7551 South Franklin St. Littleton CO 80122) Stroemel Joseph M. (4625 E. Louisiana Ave. ; E303 Denver CO 80222) Cameron Stuart M. (6308 S. Gallup Ct. Littleton CO 80120), Gravity drainage system for athletic fields and method therefor.
Treat Russell L. (Richland WA) Gee Glendon W. (Richland WA) Whyatt Greg A. (Richland WA), Method of draining water through a solid waste site without leaching.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.