A wind energy plant having at least one rotor blade with a pitch angle, the pitch angle being adjustable by means of a pitch controller, and a generator converter unit, at least one electrical quantity of the generator converter unit being adjustable by means of a converter controller, wherein the w
A wind energy plant having at least one rotor blade with a pitch angle, the pitch angle being adjustable by means of a pitch controller, and a generator converter unit, at least one electrical quantity of the generator converter unit being adjustable by means of a converter controller, wherein the wind energy plant has a power train with a rotor having the at least one rotor blade, the rotor being disposed at a front end of the power train and the power train leading to the generator converter unit, wherein a first rotation speed detection unit is provided at the power train near the front end of the power train and a second rotation speed detection unit is provided at the power train near the generator converter unit, wherein the measured rotation speed nrot of the first rotation speed detection unit is applied as an input variable to the pitch controller and the measured rotation speed of the second rotation speed detection unit is applied as an input variable to the converter controller.
대표청구항▼
What is claimed is: 1. A wind energy plant having at least one rotor blade with a pitch angle, the pitch angle being adjustable by means of a pitch controller, and a generator converter unit, at least one electrical quantity of the generator converter unit being adjustable by means of a converter c
What is claimed is: 1. A wind energy plant having at least one rotor blade with a pitch angle, the pitch angle being adjustable by means of a pitch controller, and a generator converter unit, at least one electrical quantity of the generator converter unit being adjustable by means of a converter controller, wherein the wind energy plant has a power train with a rotor having the at least one rotor blade, the rotor being disposed at a front end of the power train and the power train leading to the generator converter unit, characterized in that a first rotation speed detection unit (30) is provided at the power train near the front end of the power train and a second rotation speed detection unit (24) is provided at the power train near the generator converter unit (22), wherein the measured rotation speed (nrot) of the first rotation speed detection unit (30) is applied as an input variable to the pitch controller (36) and the measured rotation speed of the second rotation speed detection unit (24) is applied as an input variable to the converter controller (28). 2. A wind energy plant according to claim 1, characterized in that the first rotation speed detection unit (30) is disposed at the front end of the power train. 3. A wind energy plant according to claim 1, characterized in that the first rotation speed detection unit (30) measures the rotation speed nrot of the rotor shaft (14) optically. 4. A wind energy plant according to claim 1, characterized in that the first rotation speed detection unit has a resolution of more than 2,000 pulses per revolution. 5. A wind energy plant according to claim 1, characterized in that the second rotation speed detection unit (24) is disposed between an output shaft of a gear (18) and an input shaft of the generator (22) or at the generator (22). 6. A wind energy plant according to claim 5, characterized in that the measured rotation speed of the second rotation speed detection unit for the converter controller (28) is filtered by a signal processing means (26). 7. A wind energy plant according to claim 6, characterized in that the signal processing means (26) smoothes the measured rotation speed values. 8. A wind energy plant according to claim 1, characterized in that an additional rotation speed monitoring unit (38) is provided which compares the measured rotation speed values (nrot, ngen) to each other and, if a deviation is detected, issues an error signal (40) indicating an error in the power train. 9. A wind energy plant according to claim 1, characterized in that in addition, the output signals of the second rotation speed detection unit are applied to the pitch controller. 10. A wind energy plant according to claim 9, characterized in that for predetermined operating conditions of the wind energy plant, the pitch controller controls the pitch angle by means of measured values of the second rotation speed detection unit only. 11. A wind energy plant according to claim 1, characterized in that the pitch controller reverts to measured values of the first rotation speed detection unit when the measured rotation speed of the first or second rotation speed detection unit exceeds a predetermined threshold.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (7)
Malakhova,Olga; Grant,John Wesley; Schmid,James Joseph; Clark,Timothy J., Method and apparatus of monitoring a machine.
Doman Glidden S. (Granby CT) Kos Joseph M. (Holyoke MA) Harner Kermit I. (Windsor CT) DiValentin Eugene D. (Enfield CT) Healy Henry S. (Bloomfield CT), Variable speed wind turbine.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.