IPC분류정보
국가/구분 |
United States(US) Patent
등록
|
국제특허분류(IPC7판) |
|
출원번호 |
US-0041057
(2011-03-04)
|
등록번호 |
US-8150559
(2012-04-03)
|
발명자
/ 주소 |
|
출원인 / 주소 |
- Saudi Arabian Oil Company
|
대리인 / 주소 |
|
인용정보 |
피인용 횟수 :
7 인용 특허 :
12 |
초록
▼
Systems and program product for managing/assessing heat exchanger network energy efficiency and retrofit for an industrial facility, are provided. An embodiment of a system can include a heat exchanger network analysis and design computer and heat exchange network analysis and design program product
Systems and program product for managing/assessing heat exchanger network energy efficiency and retrofit for an industrial facility, are provided. An embodiment of a system can include a heat exchanger network analysis and design computer and heat exchange network analysis and design program product configured to cause the heat exchange network analysis and design computer to perform various operations including those for determining an optimal heat exchanger network retrofit projects sequence extending between a current heat exchanger network retrofit project satisfying a current desired waste energy recovery goal and a future heat exchanger network retrofit project satisfying the final waste energy recovery goal. The heat exchanger network retrofit projects sequence can be configured so that each subsequent project within the heat exchanger network retrofit projects sequence does not contradict any of the previous projects within the heat exchanger network retrofit projects sequence.
대표청구항
▼
1. A system to manage heat exchanger network energy efficiency and retrofits for an industrial facility having a plurality of process streams comprising a plurality of hot process streams and a plurality of cold process streams, the system comprising: a heat exchanger network analysis and design com
1. A system to manage heat exchanger network energy efficiency and retrofits for an industrial facility having a plurality of process streams comprising a plurality of hot process streams and a plurality of cold process streams, the system comprising: a heat exchanger network analysis and design computer having a processor and memory in communication with the processor to store software and database records therein;at least one database stored in memory accessible to the heat exchanger network analysis and design computer; andheat exchange network analysis and design program product stored in the memory of the heat exchange network analysis and design computer to manage heat exchanger network energy efficiency and retrofits for an industrial facility, the program product including instructions that when executed by the heat exchange network analysis and design computer cause the computer to perform the operations of: identifying one or more process streams that primarily control a pinch point location for an existing heat exchanger network,determining an optimal pinch point location that provides one or more of the following: a maximum waste energy recovery and a minimum number of required heat exchanger units for a given set of process conditions, anddetermining an optimal heat exchanger network retrofit projects sequence extending between a current heat exchanger network retrofit project satisfying a current desired waste energy recovery goal and a future heat exchanger network retrofit project satisfying a final waste energy recovery goal. 2. A system as defined in claim 1, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence comprises: establishing a continuum of a plurality of sequential retrofit plans based upon an increase in utility costs exceeding a corresponding increase in capital expenditures to increase energy efficiency which do not conflict with each respective prior retrofit plan within the sequence, the continuum of the plurality of sequential retrofit plans extending between a current retrofit plan describing a currently desired level of waste energy recovery energy efficiency and a projected desired level of waste energy recovery energy efficiency associated with a time at or near an end of a service life of the facility. 3. A system as defined in claim 1, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence comprises: determining a continuum of a plurality of prospective incremental pinch point location moves for a corresponding plurality of heat exchanger network retrofit design variations, the plurality of possible incremental pinch point location moves associated with an incremental decrease in stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams, the continuum extending between a pinch point location associated with a heat exchanger network retrofit design satisfying the current desired waste energy recovery goal and a heat exchanger network retrofit design satisfying the final desired waste energy recovery goal, the final desired waste energy recovery goal requiring a larger amount of waste energy recovery than the current desired waste energy recovery goal, each of the corresponding plurality of heat exchanger network retrofit designs providing a progressively larger amount waste energy recovery. 4. A system has defined in claim 1, wherein the operation of determining an optimal sequence of heat exchanger network retrofit includes: determining a pinch point location map providing an ordered description of a plurality of prospective incremental pinch point location moves associated with a corresponding plurality of heat exchanger network retrofit design variations, the plurality of incremental pinch point location moves resulting from an incremental decrease in stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams, the pinch point location moves extending between a pinch point location associated with a heat exchanger network retrofit design satisfying the current desired waste energy recovery goal and a heat exchanger network retrofit design satisfying the final desired waste energy recovery goal, the final desired energy recovery goal requiring a larger amount of waste energy recovery than the current desired waste energy recovery goal, each of the plurality of incremental pinch point location moves associated with a corresponding heat exchanger network retrofit design providing a progressively larger amount of waste energy recovery. 5. A system as defined in claim 4, wherein the pinch point location map provides a heat exchanger network retrofit projects sequence identifying a plurality of heat exchanger network retrofit projects sequentially to define the optimal heat exchanger network retrofit projects sequence, each subsequent heat exchanger network retrofit project configured so as to not contradict any previous projects in the heat exchanger network retrofit projects sequence. 6. A system as defined in claim 1, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves to thereby define a plurality of heat exchanger network retrofit designs;identifying each hot process stream-cold process stream combination in each respective heat exchanger network design that is exchanging heat across an optimal pinch point defining one or more cross-pinch heat exchange conditions;performing one or more of the following rematching techniques to remove any cross-pinch heat exchange condition in each respective heat exchanger network design: connecting an affected hot to a different cold process stream and adding additional heat exchanger units above and below the pinch point;performing one or more of the following after performing the one or more rematching techniques to remove any cross-pinch heat exchange condition in each respective heat exchanger network design: rematching one or more of the plurality of process streams to account for one or more non-process-pinch points when existing, andrematching one or more of the plurality of process streams to account for multiple refrigeration levels when existing; andanalyzing the resulting structure in each respective heat exchanger network design to determine feasibility of continued retrofits to thereby form the optimal heat exchanger network retrofit projects sequence. 7. A system as defined in claim 1, wherein the operations further comprise performing the following for each of a plurality of heat exchanger network designs: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of pinch point locations;identifying a hot process stream-cold process stream combination in the respective heat exchanger network design exchanging heat across a selected one of the plurality of pinch point locations defining a cross-pinch heat exchange condition; andperforming process condition manipulation, minimum temperature approach value manipulation, or both process condition manipulation and minimum temperature approach value manipulation to move the pinch point location to be completely above or completely below the hot stream and cold stream temperatures associated with the cross-pinch heat exchange condition. 8. A system as defined in claim 1, wherein the operations further comprise: identifying one or more of the plurality of process streams that control one or more pinch point location moves associated with a current heat exchanger network design that satisfies a desired increase in waste energy recovery prior to constructing a corresponding prospective heat exchanger network design that satisfies the desired waste energy recovery; andidentifying each of one or more streams specific turning point temperatures associated with the one or more pinch point location moves. 9. A system has defined in claim 1, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence includes: receiving minimum temperature approach value data indicating an upper and a lower range of a set of stream-specific minimum temperature approach values, the upper range of stream-specific minimum temperature approach values being a value attainable according to a current structure of the existing heat exchanger network, the lower range of stream-specific minimum temperature approach values being a lower bound set associated with a last retrofit project to be conducted at a future date at an end of the serviceable life of the heat exchanger network for the facility defining the future heat exchanger network retrofit project; anddetermining a process pinch range interval identifying a ranges of process pinch locations for all anticipated combinations of process conditions and heat exchanger network design modifications responsive to the minimum temperature approach value data. 10. A system as defined in claim 1, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of different pinch point locations to thereby define a plurality of heat exchanger network retrofit design variations for a heat exchanger network design problem;determining a minimum number of required heat exchanger units associated with each separate one of the plurality of heat exchanger network retrofit design variations having corresponding different pinch point locations; anddetermining an optimal pinch point location that provides the minimum number of heat exchanger units. 11. A system as defined in claim 1, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of different pinch point locations; anddetermining an optimal pinch point location that provides the maximum waste energy recovery for a given set of process conditions. 12. A system as defined in claim 1, wherein the operations further comprise: determining a minimum number of required heat exchanger units in a certain heat exchanger network design;determining an impact on waste energy recovery of using less than a minimum number of required heat exchanger units;determining the impact on waste energy recovery of wrong matches between one or more of the plurality of hot process streams and one or more of the plurality of cold process streams according to the certain heat exchanger network design; anddetermining the impact on waste energy recovery of heat exchanger units having a less than optimal heat exchanger unit surface area for the certain heat exchanger network design with respect to capital costs. 13. A system as defined in claim 1, wherein the operations further comprise: determining a minimum number of heat exchanger units that need to be added to a certain heat exchanger network design to attain a current waste energy recovery capability under existing process conditions and stream specific minimum temperature approach values. 14. A system as defined in claim 1, wherein the operations further comprise performing one or more of the following: moving a pinch point location for a certain heat exchanger network design through process condition modification of one or more process streams identified as controlling the pinch point location; andmoving the pinch point location through minimum temperature approach value modification of the one or more process streams identified as controlling the pinch point location. 15. A system as defined in claim 1, wherein the operations further comprise one or more of the following: defining an implicit pinch point when desired energy goals dictate a heat exchanger network design having only one but not both of the following classes of utility: a heating utility and a cooling utility; andidentifying design enhancement scenarios where a heat exchanger network design problem applied to the existing heat exchanger network and presented to satisfy the final energy recovery retrofit goal becomes a threshold problem during an optimization analysis. 16. Heat exchanger network analysis and design program product to manage heat exchanger network energy efficiency and retrofits for an industrial facility having a plurality of process streams comprising a plurality of hot process streams and a plurality of cold process streams, the program product comprising a set of instructions, stored on a tangible computer readable medium, that when executed by a computer, cause the computer to perform the operations of: identifying one or more process streams that primarily control a pinch point location for an existing heat exchanger network;determining an optimal pinch point location that provides one or more of the following: a maximum waste energy recovery and a minimum number of required heat exchanger units for a given set of process conditions; anddetermining an optimal heat exchanger network retrofit projects sequence extending between a current heat exchanger network retrofit project satisfying a current desired waste energy recovery goal and a future heat exchanger network retrofit project satisfying a final waste energy recovery goal. 17. Program product as defined in claim 16, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence comprises: establishing a continuum of a plurality of sequential retrofit plans based upon an increase in utility costs exceeding a corresponding increase in capital expenditures to increase energy efficiency which do not conflict with each respective prior retrofit plan within the sequence, the continuum of the plurality of sequential retrofit plans extending between a current retrofit plan describing a currently desired level of waste energy recovery energy efficiency and a projected desired level of waste energy recovery energy efficiency associated with a time at or near an end of a service life of the facility. 18. Program product as defined in claim 16, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence comprises: determining a continuum of a plurality of prospective incremental pinch point location moves for a corresponding plurality of heat exchanger network retrofit design variations, the plurality of possible incremental pinch point location moves associated with an incremental decrease in stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams, the continuum extending between a pinch point location associated with a heat exchanger network retrofit design satisfying the current desired waste energy recovery goal and a heat exchanger network retrofit design satisfying the final desired waste energy recovery goal, the final desired waste energy recovery goal requiring a larger amount of waste energy recovery than the current desired waste energy recovery goal, each of the corresponding plurality of heat exchanger network retrofit designs providing a progressively larger amount waste energy recovery. 19. Program product has defined in claim 16, wherein the operation of determining an optimal sequence of heat exchanger network retrofit includes: determining a pinch point location map providing an ordered description of a plurality of prospective incremental pinch point location moves associated with a corresponding plurality of heat exchanger network retrofit design variations, the plurality of incremental pinch point location moves resulting from an incremental decrease in stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams, the pinch point location moves extending between a pinch point location associated with a heat exchanger network retrofit design satisfying the current desired waste energy recovery goal and a heat exchanger network retrofit design satisfying the final desired waste energy recovery goal, the final desired energy recovery goal requiring a larger amount of waste energy recovery than the current desired waste energy recovery goal, each of the plurality of incremental pinch point location moves associated with a corresponding heat exchanger network retrofit design providing a progressively larger amount of waste energy recovery. 20. Program product as defined in claim 19, wherein the pinch point location map provides a heat exchanger network retrofit projects sequence identifying a plurality of heat exchanger network retrofit projects sequentially to define the optimal heat exchanger network retrofit projects sequence, each subsequent heat exchanger network retrofit project configured so as to not contradict any previous projects in the heat exchanger network retrofit projects sequence. 21. Program product as defined in claim 16, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves to thereby define a plurality of heat exchanger network retrofit designs;identifying each hot process stream-cold process stream combination in each respective heat exchanger network design that is exchanging heat across an optimal pinch point defining one or more cross-pinch heat exchange conditions;performing one or more of the following rematching techniques to remove any cross-pinch heat exchange condition in each respective heat exchanger network design: connecting an affected hot to a different cold process stream and adding additional heat exchanger units above and below the pinch point;performing one or more of the following after performing the one or more rematching techniques to remove any cross-pinch heat exchange condition in each respective heat exchanger network design: rematching one or more of the plurality of process streams to account for one or more non-process-pinch points when existing, andrematching one or more of the plurality of process streams to account for multiple refrigeration levels when existing; andanalyzing the resulting structure in each respective heat exchanger network design to determine feasibility of continued retrofits to thereby form the optimal heat exchanger network retrofit projects sequence. 22. Program product as defined in claim 16, wherein the operations further comprise performing the following for each of a plurality of heat exchanger network designs: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of pinch point locations;identifying a hot process stream-cold process stream combination in the respective heat exchanger network design exchanging heat across a selected one of the plurality of pinch point locations defining a cross-pinch heat exchange condition; andperforming process condition manipulation, minimum temperature approach value manipulation, or both process condition manipulation and minimum temperature approach value manipulation to move the pinch point location to be completely above or completely below the hot stream and cold stream temperatures associated with the cross-pinch heat exchange condition. 23. Program product as defined in claim 16, wherein the operations further comprise: identifying one or more of the plurality of process streams that control one or more pinch point location moves associated with a current heat exchanger network design that satisfies a desired increase in waste energy recovery prior to constructing a corresponding prospective heat exchanger network design that satisfies the desired waste energy recovery; andidentifying each of one or more streams specific turning point temperatures associated with the one or more pinch point location moves. 24. Program product has defined in claim 16, wherein the operation of determining an optimal heat exchanger network retrofit projects sequence includes: receiving minimum temperature approach value data indicating an upper and a lower range of a set of stream-specific minimum temperature approach values, the upper range of stream-specific minimum temperature approach values being a value attainable according to a current structure of the existing heat exchanger network, the lower range of stream-specific minimum temperature approach values being a lower bound set associated with a last retrofit project to be conducted at a future date at an end of the serviceable life of the heat exchanger network for the facility defining the future heat exchanger network retrofit project; anddetermining a process pinch range interval identifying a ranges of process pinch locations for all anticipated combinations of process conditions and heat exchanger network design modifications responsive to the minimum temperature approach value data. 25. Program product as defined in claim 16, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of different pinch point locations to thereby define a plurality of heat exchanger network retrofit design variations for a heat exchanger network design problem;determining a minimum number of required heat exchanger units associated with each separate one of the plurality of heat exchanger network retrofit design variations having corresponding different pinch point locations; anddetermining an optimal pinch point location that provides the minimum number of heat exchanger units. 26. Program product as defined in claim 16, wherein the operations further comprise: incrementally decreasing stream specific minimum temperature approach values applied to one or more of the plurality of hot process streams to identify a plurality of incremental pinch point location moves defining a plurality of different pinch point locations; anddetermining an optimal pinch point location that provides the maximum waste energy recovery for a given set of process conditions. 27. Program product as defined in claim 16, wherein the operations further comprise: determining a minimum number of required heat exchanger units in a certain heat exchanger network design;determining an impact on waste energy recovery of using less than a minimum number of required heat exchanger units;determining the impact on waste energy recovery of wrong matches between one or more of the plurality of hot process streams and one or more of the plurality of cold process streams according to the certain heat exchanger network design; anddetermining the impact on waste energy recovery of heat exchanger units having a less than optimal heat exchanger unit surface area for the certain heat exchanger network design with respect to capital costs. 28. Program product as defined in claim 16, wherein the operations further comprise: determining a minimum number of heat exchanger units that need to be added to a certain heat exchanger network design to attain a current waste energy recovery capability under existing process conditions and stream specific minimum temperature approach values. 29. Program product as defined in claim 16, wherein the operations further comprise performing one or more of the following: moving a pinch point location for a certain heat exchanger network design through process condition modification of one or more process streams identified as controlling the pinch point location; andmoving the pinch point location through minimum temperature approach value modification of the one or more process streams identified as controlling the pinch point location. 30. Program product as defined in claim 16, wherein the operations further comprise one or more of the following: defining an implicit pinch point when desired energy goals dictate a heat exchanger network design having only one but not both of the following classes of utility: a heating utility and a cooling utility; andidentifying design enhancement scenarios where a heat exchanger network design problem applied to the existing heat exchanger network and presented to satisfy the final energy recovery retrofit goal becomes a threshold problem during an optimization analysis. 31. Heat exchanger network analysis and design program product to manage heat exchanger network energy efficiency and retrofits for an industrial facility having a plurality of process streams comprising a plurality of hot process streams and a plurality of cold process streams, the program product comprising a set of instructions, stored on a tangible computer readable medium, that when executed by a computer, cause the computer to perform the operations of: receiving data indicating a current heat transfer structure of an existing heat exchanger network for an industrial facility;identifying one or more process streams that primarily control pinch point location for the existing heat exchanger network;identifying a set of one or more hot process streams having a highest impact on waste energy recovery upon reducing its respective stream specific minimum temperature approach value;identifying a maximum desired waste energy recovery goal anticipated over a life of the heat exchanger network defining a final waste energy recovery goal; anddetermining an optimal heat exchanger network retrofit projects sequence identifying a plurality of heat exchanger network retrofit projects sequentially, the heat exchanger network retrofit projects sequence extending between a current heat exchanger network retrofit project satisfying a current desired waste energy recovery goal and a future heat exchanger network retrofit project satisfying the final waste energy recovery goal, the final waste energy recovery goal requiring a larger amount of waste energy recovery than the current desired waste energy recovery goal, the heat exchanger network retrofit projects sequence configured so that each subsequent project within the heat exchanger network retrofit projects sequence does not contradict any of the previous projects within the heat exchanger network retrofit projects sequence.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.