A method and a system for analyzing infrastructure are provided. In one embodiment, a system for analyzing infrastructure is provided. The system includes a grid intelligence quotient as a service (GIQAAS) system. The GIQAAS system includes an infrastructure data gathering system having a first inpu
A method and a system for analyzing infrastructure are provided. In one embodiment, a system for analyzing infrastructure is provided. The system includes a grid intelligence quotient as a service (GIQAAS) system. The GIQAAS system includes an infrastructure data gathering system having a first input form configured to collect an economic data related to an infrastructure. The GIQAAS system further includes an economic modeling system configured to import the economic data and to derive an economic analysis based on the economic data. The GIQAAS system is configured to provide the infrastructure data gathering system to a first user for collection of the economic data, and to provide the economic modeling system to a second user for derivation of the economic analysis.
대표청구항▼
1. A system for analyzing infrastructure, comprising: a processor configured to execute:a software system configured to: receive customer information further comprising: a customer name of the customer;a contract start date;a contract term;a cost to deploy a service vehicle;a plurality of endpoint t
1. A system for analyzing infrastructure, comprising: a processor configured to execute:a software system configured to: receive customer information further comprising: a customer name of the customer;a contract start date;a contract term;a cost to deploy a service vehicle;a plurality of endpoint types, further comprising at least one of an electric endpoint type, a water endpoint type and a gas endpoint type;a total number of endpoints by endpoint type;a monthly disconnect rate by endpoint type;a prepay monthly disconnect rate reduction for each endpoint type;an average bill by endpoint type;a total monthly service revenue by endpoint type;a truck roll cost;a cost per occurrence of move ins and move outs;a plurality of grid components, further comprising at least two of:an advanced metering infrastructure (AMI), an outage management system (OMS), a distribution management system (DMS), a geographic information system (GIS), a customer information system (CIS), an interactive voice response (IVR) system, a power plant component, a gas processing plant component, a water processing plant component, an electrical distribution grid component, a water distribution grid component, a gas distribution grid component and a utility control center component; and a first suite of offerings and a second suite of offerings of a plurality of energy offerings from one or more manufacturers or service providers;compute, by the processor, costs of the customer acquiring the first suite of offerings and to compute the costs of the customer acquiring the second suite of offerings by: multiplying each of a market pricing of an application of each of the plurality of grid components by an integration factor related to each of their installation to calculate a cost with integration for each of the plurality of grid components;dividing the cost with integration for each of the plurality of grid components by the total number of endpoints to compute a cost per meter;multiplying the cost with integration for each of the plurality of the grid components with an annual support rate percentage for each of the grid components, divided by twelve months, and further divided by the total number of endpoints, to compute an annual support per meter per month;summing the cost per meter by the annual support per meter per month to calculate a total per meter investment;computing, using the total per meter investment and the total number of endpoints, a total investment for each of the plurality of grid components;summing each of the market pricing of the application of each of the plurality of grid components to calculate a total technology cost;summing the cost with integration for each of the plurality of grid components to calculate a total cost with integration;multiplying a percent refreshment rate to the total technology cost to compute a cost of refreshing current technology;computing a technology refreshment cost spread over time using the cost of refreshing current technology;summing the technology refreshment cost spread over time and the total cost with integration to compute a total cost of ownership;dividing the total cost of ownership by the total number of endpoints and further by the twelve months to compute a total cost of ownership per meter cost;multiplying a personnel count by a labor cost to compute a total labor cost;dividing the total labor cost by the twelve months and by the total number of endpoints to compute a cost of labor avoided per month per meter by using the second suite of offerings;adding the total cost of ownership per meter cost to the cost of labor avoided per month per meter to compute a total cost of ownership per meter per month; andmultiplying the total cost of ownership per meter per month by the total number of endpoints to compute a total cost of ownership per month;compute, by the processor, a revenue generated by the customer acquiring the first suite of offerings and compute the revenue generated by the customer acquiring the second suite of offerings by: multiplying the monthly disconnect rate by endpoint type with the total number of endpoints by endpoint type to compute a total number of meters by endpoint type disconnected per month;multiplying the total number of meters by endpoint type disconnected per month with the prepay monthly disconnect rate reduction by endpoint type to compute a monthly disconnect rate reduction;subtracting the monthly disconnect rate reduction from the total number of meters by endpoint type disconnected per month, and multiplying by the average bill by endpoint type, and dividing by the total number of endpoints by endpoint type to calculate a revenue improvement per meter per month;multiplying the average bill by endpoint type with the total number of endpoints by endpoint type to compute a total monthly revenue;multiplying the truck roll cost by an avoided track roll monthly occurrence to compute a monthly track roll costs avoidance;dividing the monthly track roll costs avoidance by the total number of endpoints by endpoint type to compute an avoidance of truck rolls per meter per month;multiplying the cost per occurrence of move ins and move outs with a number of move ins and move outs prevented and dividing by the total number of endpoints by endpoint type to compute a percent prevention of move ins and move outs per month;multiplying a theft caught by prepay loss by endpoint type with the total monthly service revenue by endpoint type and dividing by a theft rate prevented by prepayment value to calculate a loss prevention benefit; anddividing the loss prevention benefit by the total number of endpoints by endpoint type to calculate a per meter theft prevention benefit;calculate, by the processor, an as-is net revenue that does not include costs of the customer acquiring the first suite of offerings or the customer acquiring the second suite of offerings;calculate, by the processor, a capital expenditure net revenue by subtracting the costs of the customer acquiring the first suite of offerings from the revenue generated by the customer acquiring the first suite of offerings;calculate, by the processor, a grid intelligence quotient net revenue by subtracting the costs of the customer acquiring the second suite of offerings from the revenue generated by the customer acquiring the second suite of offerings;compute, by the processor, an as-is cumulative revenue, a capital expenditure cumulative revenue and a grid intelligence quotient cumulative revenue from each of the as-is net revenue, the capital expenditure net revenue and the grid intelligence quotient net revenue; anddisplay, by the processor, each of the as-is cumulative revenue, the capital expenditure cumulative revenue and the grid intelligence quotient cumulative revenue as a textual representation, a graphical representation, or a combination thereof, of cumulative revenue against time for analyzing economic differences of the customer implementing the first plurality of offerings, the customer implementing the second plurality of offerings or the customer not implementing any of the first plurality of offerings or the second plurality of offerings. 2. The system of claim 1, wherein the infrastructure comprises a smart grid system infrastructure. 3. The system of claim 2, wherein the smart grid system infrastructure comprises only two of: the advanced metering infrastructure (AMI), the outage management system (OMS), the distribution management system (DMS), the geographic information system (GIS), the customer information system (CIS), the interactive voice response (IVR) system, the power plant component, the gas processing plant component, the water processing plant component, the electrical distribution grid component, the water distribution grid component, the gas distribution grid component, or the utility control center component. 4. The system of claim 1, wherein the software system comprises a website. 5. The system of claim 1, wherein the software system comprises a spreadsheet. 6. The system of claim 2, wherein the smart grid system infrastructure is provided by a single manufacturer. 7. The system of claim 2, wherein the smart grid system infrastructure is provided by a plurality of manufacturers. 8. A non-transitory machine readable media storing instructions, comprising: instructions configured to receive customer information, the customer information further comprising: a customer name of the customer;a contract start date;a contract term;a cost to deploy a service vehicle;a plurality of endpoint types, further comprising at least one of an electric endpoint type, a water endpoint type and a gas endpoint type;a total number of endpoints by endpoint type;a monthly disconnect rate by endpoint type;a prepay monthly disconnect rate reduction for each endpoint type;an average bill by endpoint type;a total monthly service revenue by endpoint type;a truck roll cost;a cost per occurrence of move ins and move outs;a plurality of grid components, further comprising at least two of:an advanced metering infrastructure (AMI), an outage management system (OMS), a distribution management system (DMS), a geographic information system (GIS), a customer information system (CIS), an interactive voice response (IVR) system, a power plant component, a gas processing plant component, a water processing plant component, an electrical distribution grid component, a water distribution grid component, a gas distribution grid component and a utility control center component; and a first suite of offerings and a second suite of offerings of a plurality of energy offerings from one or more manufacturers or service providers;compute, by a processor, costs of the customer acquiring the first suite of offerings and to compute the costs of the customer acquiring the second suite of offerings by: multiplying each of a market pricing of an application of each of the plurality of grid components by an integration factor related to each of their installation to calculate a cost with integration for each of the plurality of grid components;dividing the cost with integration for each of the plurality of grid components by the total number of endpoints to compute a cost per meter;multiplying the cost with integration for each of the plurality of the grid components with an annual support rate percentage for each of the grid components, divided by twelve months, and further divided by the total number of endpoints, to compute an annual support per meter per month;summing the cost per meter by the annual support per meter per month to calculate a total per meter investment;computing, using the total per meter investment and the total number of endpoints, a total investment for each of the plurality of grid components;summing each of the market pricing of the application of each of the plurality of grid components to calculate a total technology cost;summing the cost with integration for each of the plurality of grid components to calculate a total cost with integration;multiplying a percent refreshment rate to the total technology cost to compute a cost of refreshing current technology;computing a technology refreshment cost spread over time using the cost of refreshing current technology;summing the technology refreshment cost spread over time and the total cost with integration to compute a total cost of ownership;dividing the total cost of ownership by the total number of endpoints and further by the twelve months to compute a total cost of ownership per meter cost;multiplying a personnel count by a labor cost to compute a total labor cost;dividing the total labor cost by the twelve months and by the total number of endpoints to compute a cost of labor avoided per month per meter by using the second suite of offerings;adding the total cost of ownership per meter cost to the cost of labor avoided per month per meter to compute a total cost of ownership per meter per month; andmultiplying the total cost of ownership per meter per month by the total number of endpoints to compute a total cost of ownership per month;compute, by the processor, a revenue generated by the customer acquiring the first suite of offerings and compute the revenue generated by the customer acquiring the second suite of offerings by: multiplying the monthly disconnect rate by endpoint type with the total number of endpoints by endpoint type to compute a total number of meters by endpoint type disconnected per month;multiplying the total number of meters by endpoint type disconnected per month with the prepay monthly disconnect rate reduction by endpoint type to compute a monthly disconnect rate reduction;subtracting the monthly disconnect rate reduction from the total number of meters by endpoint type disconnected per month, and multiplying by the average bill by endpoint type, and dividing by the total number of endpoints by endpoint type to calculate a revenue improvement per meter per month;multiplying the average bill by endpoint type with the total number of endpoints by endpoint type to compute a total monthly revenue;multiplying the truck roll cost by an avoided track roll monthly occurrence to compute a monthly track roll costs avoidance;dividing the monthly track roll costs avoidance by the total number of endpoints by endpoint type to compute an avoidance of truck rolls per meter per month;multiplying the cost per occurrence of move ins and move outs with a number of move ins and move outs prevented and dividing by the total number of endpoints by endpoint type to compute a percent prevention of move ins and move outs per month;multiplying a theft caught by prepay loss by endpoint type with the total monthly service revenue by endpoint type and dividing by a theft rate prevented by prepayment value to calculate a loss prevention benefit; anddividing the loss prevention benefit by the total number of endpoints by endpoint type to calculate a per meter theft prevention benefit;calculate, by the processor, an as-is net revenue that does not include costs of the customer acquiring the first suite of offerings or the customer acquiring the second suite of offerings;calculate, by the processor, a capital expenditure net revenue by subtracting the costs of the customer acquiring the first suite of offerings from the revenue generated by the customer acquiring the first suite of offerings;calculate, by the processor, a grid intelligence quotient net revenue by subtracting the costs of the customer acquiring the second suite of offerings from the revenue generated by the customer acquiring the second suite of offerings;compute, by the processor, an as-is cumulative revenue, a capital expenditure cumulative revenue and a grid intelligence quotient cumulative revenue from each of the as-is net revenue, the capital expenditure net revenue and the grid intelligence quotient net revenue; anddisplay, by the processor, each of the as-is cumulative revenue, the capital expenditure cumulative revenue and the grid intelligence quotient cumulative revenue as a textual representation, a graphical representation, or a combination thereof, of cumulative revenue against time for analyzing economic differences of the customer implementing the first plurality of offerings, the customer implementing the second plurality of offerings or the customer not implementing any of the first plurality of offerings or the second plurality of offerings. 9. The non-transitory machine readable media of claim 8, wherein the instructions are configured to be executable by a website. 10. The non-transitory machine readable media of claim 8, wherein the instructions are configured to be executable by a spreadsheet. 11. The non-transitory machine readable media of claim 8, wherein the plurality of grid components comprise only two of: the advanced metering infrastructure (AMI) input, the outage management system (OMS), the distribution management system (DMS), the geographic information system (GIS), the customer information system (CIS), the interactive voice response (IVR) system, the power plant component, the gas plant component, the water plant component, the electrical distribution grid component, the water distribution grid component, the gas distribution grid component, or the utility control center component. 12. The non-transitory machine readable media of claim 8, wherein the grid components are provided by a single manufacturer. 13. The non-transitory machine readable media of claim 8, wherein the grid components are provided by a plurality of manufacturers. 14. A method comprising: receiving customer information, the customer information further comprising: a customer name of the customer;a contract start date;a contract term;a cost to deploy a service vehicle;a plurality of endpoint types, further comprising at least one of an electric endpoint type, a water endpoint type and a gas endpoint type;a total number of endpoints by endpoint type;a monthly disconnect rate by endpoint type;a prepay monthly disconnect rate reduction for each endpoint type;an average bill by endpoint type;a total monthly service revenue by endpoint type;a truck roll cost;a cost per occurrence of move ins and move outs;a plurality of grid components, further comprising at least two of:an advanced metering infrastructure (AMI), an outage management system (OMS), a distribution management system (DMS), a geographic information system (GIS), a customer information system (CIS), an interactive voice response (IVR) system, a power plant component, a gas processing plant component, a water processing plant component, an electrical distribution grid component, a water distribution grid component, a gas distribution grid component and a utility control center component; anda first suite of offerings and a second suite of offerings of a plurality of energy offerings from one or more manufacturers or service providers;computing, by a processor, costs of the customer acquiring the first suite of offerings and to compute the costs of the customer acquiring the second suite of offerings by: multiplying each of a market pricing of an application of each of the plurality of grid components by an integration factor related to each of their installation to calculate a cost with integration for each of the plurality of grid components;dividing the cost with integration for each of the plurality of grid components by the total number of endpoints to compute a cost per meter;multiplying the cost with integration for each of the plurality of the grid components with an annual support rate percentage for each of the grid components, divided by twelve months, and further divided by the total number of endpoints, to compute an annual support per meter per month;summing the cost per meter by the annual support per meter per month to calculate a total per meter investment;computing, using the total per meter investment and the total number of endpoints, a total investment for each of the plurality of grid components;summing each of the market pricing of the application of each of the plurality of grid components to calculate a total technology cost;summing the cost with integration for each of the plurality of grid components to calculate a total cost with integration;multiplying a percent refreshment rate to the total technology cost to compute a cost of refreshing current technology;computing a technology refreshment cost spread over time using the cost of refreshing current technology;summing the technology refreshment cost spread over time and the total cost with integration to compute a total cost of ownership;dividing the total cost of ownership by the total number of endpoints and further by the twelve months to compute a total cost of ownership per meter cost;multiplying a personnel count by a labor cost to compute a total labor cost;dividing the total labor cost by the twelve months and by the total number of endpoints to compute a cost of labor avoided per month per meter by using the second suite of offerings;adding the total cost of ownership per meter cost to the cost of labor avoided per month per meter to compute a total cost of ownership per meter per month; andmultiplying the total cost of ownership per meter per month by the total number of endpoints to compute a total cost of ownership per month;computing, by the processor, a revenue generated by the customer acquiring the first suite of offerings and computing the revenue generated by the customer acquiring the second suite of offerings by: multiplying the monthly disconnect rate by endpoint type with the total number of endpoints by endpoint type to compute a total number of meters by endpoint type disconnected per month;multiplying the total number of meters by endpoint type disconnected per month with the prepay monthly disconnect rate reduction by endpoint type to compute a monthly disconnect rate reduction;subtracting the monthly disconnect rate reduction from the total number of meters by endpoint type disconnected per month, and multiplying by the average bill by endpoint type, and dividing by the total number of endpoints by endpoint type to calculate a revenue improvement per meter per month;multiplying the average bill by endpoint type with the total number of endpoints by endpoint type to compute a total monthly revenue;multiplying the truck roll cost by an avoided track roll monthly occurrence to compute a monthly track roll costs avoidance;dividing the monthly track roll costs avoidance by the total number of endpoints by endpoint type to compute an avoidance of truck rolls per meter per month;multiplying the cost per occurrence of move ins and move outs with a number of move ins and move outs prevented and dividing by the total number of endpoints by endpoint type to compute a percent prevention of move ins and move outs per month;multiplying a theft caught by prepay loss by endpoint type with the total monthly service revenue by endpoint type and dividing by a theft rate prevented by prepayment value to calculate a loss prevention benefit; anddividing the loss prevention benefit by the total number of endpoints by endpoint type to calculate a per meter theft prevention benefit;calculating, by the processor, an as-is net revenue that does not include costs of the customer acquiring the first suite of offerings or the customer acquiring the second suite of offerings;calculating, by the processor, a capital expenditure net revenue by subtracting the costs of the customer acquiring the first suite of offerings from the revenue generated by the customer acquiring the first suite of offerings;calculating, by the processor, a grid intelligence quotient net revenue by subtracting the costs of the customer acquiring the second suite of offerings from the revenue generated by the customer acquiring the second suite of offerings;computing, by the processor, an as-is cumulative revenue, a capital expenditure cumulative revenue and a grid intelligence quotient cumulative revenue from each of the as-is net revenue, the capital expenditure net revenue and the grid intelligence quotient net revenue; anddisplaying, by the processor, each of the as-is cumulative revenue, the capital expenditure cumulative revenue and the grid intelligence quotient cumulative revenue as a textual representation, a graphical representation, or a combination thereof, of cumulative revenue against time for analyzing economic differences of the customer implementing the first plurality of offerings, the customer implementing the second plurality of offerings or the customer not implementing any of the first plurality of offerings or the second plurality of offerings. 15. The method of claim 14, wherein the method is executed by utilizing a website. 16. The method of claim 14, wherein the method is executed by utilizing a spreadsheet. 17. The method of claim 14, wherein the plurality of grid components comprise only two of: the advanced metering infrastructure (AMI), the outage management system (OMS), the distribution management system (DMS), the geographic information system (GIS), the customer information system (CIS), the interactive voice response (IVR) system, the power plant component, the gas plant component, the water plant component, the electrical distribution grid component, the water distribution grid component, the gas distribution grid component or the utility control center component.
연구과제 타임라인
LOADING...
LOADING...
LOADING...
LOADING...
LOADING...
이 특허에 인용된 특허 (12)
Pang, Jong-Shi; Huang, Jacqueline, Apparatus and method of pricing financial derivatives.
Crooks Gerry ; Arnhold Ed ; Battista John ; Boni Ken ; Bowers Dan ; Feichtner Mark ; French Blaine ; Genzberger Janna ; Holmes David D. ; Kippenhan Larry ; Miller Dave ; Nanto Shawn ; Orr Teri ; Schl, Computerized resource accounting methods and systems, computerized utility management methods and systems, multi-user utility management methods and systems, and energy-consumption-based tracking met.
Scott,Donna M.; Gilliland,Katherine; Curtis,Patchin; Nason,Cheryl; Neale,Heather; Osguthorpe,Aaron, Methods and systems for the management of a bulk electric power market.
Jayaraman Rangarajan (Hopewell Junction NY) Roundy Robin (Ithaca NY) Srinivasan Ramesh (Yorktown Heights NY), Methods for parts procurement quantity determination where demand is uncertain for the product in which the parts are us.
※ AI-Helper는 부적절한 답변을 할 수 있습니다.